A wooden bell tower, erected in the 16th century, was vertically deflected due to uneven settlement of the subgrade having insufficient load-bearing capacity. The structure's condition was continuously deteriorating due to the advancing structural deformation. Structure renovation was designed and carried out in two phases. Foundations in the form of piles and strips were executed under the existing structure in the first phase, and then the structure was reinforced and straightened with twelve hydraulic jacks. The damaged above-ground components of the construction and its sheathing were replaced in the second phase. With the designed and executed procedure, it was possible to preserve the historical building in the unaltered form without interfering with the elements of the 500 hundred-years-old structure's construction. Force values and jacks' displacements were measured during straightening. The construction's behaviour, when eliminating the deflection, was described with the measurement forces in jacks and its displacement.
1 October 2017 in IOP Conference Series: Materials Science and Engineering
The deflection of the building in relation to the vertical is caused by its uneven lowering. The deflection hinders the use of the building and causes occurrence of the additional inner forces which the construction of the building is not designed to take. Therefore, the deflections of the buildings should be removed. Three methods of removing building deflection have been used in Poland. The first method is removing the soil from under the part of the building which is positioned too high. The second method is elevating parts of the building that are too low. The third method is simultaneous removing the soil and elevating the building. In this work all three methods are presented and analysed showing their advantages and disadvantages. Removing the soil from under the part of the building which is positioned too high can be achieved by drilling holes under the building or cutting parts of the soil under the building. After removing the soil, the building returns to the vertical. The advantage of this method is no interference in the construction of the building. The disadvantages are the lack of precise control over the process and the necessity of occupancy for the construction site the considerable area around the building. The second method to remove the deflection of building is elevating using the hydraulic jacks. These jacks are usually built-up in the openings made in the walls of the lowest level. Removing deflection through elevating is performed through inflicting shifting to the jacks. It consists of three phases: tearing the building, steady elevating and not steady elevating. In practice two types of jacks are used: hydraulic piston jacks and hydraulic diaphragm jacks. These jacks can be manually or computer controlled. The advantage of this method is full control of the levelling process. The disadvantage is the interference in the construction of the building (tearing the building). The last method is simultaneous elevating parts of the building located too low and lowering parts of the building positioned too high. Removing building deflection through non uniform elevating with the help of hydraulic piston jacks is the method being used the most often.
In this paper, we present the application of the homotopy analysis method for solving integrodifferential equations. In this method, a series is created, the successive elements of which are determined by calculating the appropriate integral of the previous element. In this elaboration, we prove that, if this series is convergent, then its sum is the solution of the objective equation. We formulate and prove the sufficient condition of this convergence, and we give also the estimation of error of an approximate solution obtained by taking the partial sum of the considered series. Moreover, we present in this paper the example of using the investigated method for determining the vibrations of the freely supported reinforced concrete beam as well as for solving the equation of movement of the electromagnet jumper mechanical system.
There are many vertically deflected building structures in the world that require rectification. Temporary supports installed in the building bearing walls can be used to perform such a rectification. The supports consist of a hydraulic piston jack, a stack of parallelepiped steel elements, and a concrete grout. The structure is unevenly raised and reaches the desired vertical position using such supports. The support in which the piston extension is forced at the given time is an active support. The aim was to determine the stiffness of an active support. The investigations were performed in in situ conditions during experimental building rectification. No such investigations have been performed to date. It has been demonstrated that the stiffness of the investigated support results from the stiffness of the serially connected elements forming the support. In general, the support stiffness depends on the value of the force occurring in the support and is rising linearly along with the load for the investigated range. It was also shown that the force existing in the active support also depends on the stiffness of the building being rectified. The investigations carried out show that it is advantageous to use supports with smaller stiffness for rectification, as forces with smaller values must be induced in them. The application of forces with lower values also allows the avoidance of unfavorable penetration of the unlifted part of the building into the ground.
1 September 2019 in IOP Conference Series: Materials Science and Engineering
The construction of the German Nazi concentration and extermination camp Auschwitz II - Birkenau started at the end of 1941. A barrack with the current inventory no. B-123, situated at the section BI, was then erected. The barrack has a documentary and historical value. The barrack walls are characterised by the low stiffness, because with the building’s plan of 36.17 m × 11.39 m, the walls are only 0.12 m thick. All the outer walls have been substantially deformed or vertically deflected. Up to 100 mm wide gaps have formed between the deformed and deflected external walls and contiguous walls as a result. The stability of the walls was at risk, because a bad-quality wall was loaded with horizontal and vertical forces transmitted from the roof on the eccentricity reaching 100 mm. Deformations were progressing over time as a consequence of such forces. Individual rectification procedures were designed and implemented for each wall as part of the comprehensive conservatory and building works, the purpose of which was to ensure the stability. This article presents a procedure of rectification the eastern gable wall and the outer, longitudinal northern wall. The deformation of the eastern gable wall was removed by changing its static scheme, by inserting hinge regions into the wall along the line of selected bed joints. Separate wall patches, which could rotate relative to each other, were created as a result of the forces acting perpendicular to the wall surface. By causing the mutual rotation of such patches, the eastern gable wall reached the desired vertical position. The vertically deflected, longitudinal outer northern wall was rectified by rotating the wall in relation to the wall support edge on the foundations. An analogous procedure was applied to the outer longitudinal southern wall. After the completed rectification, the walls were anchored to the contiguous walls; the places of rotation and anchoring were filled with mortar. A different procedure was adopted for the other deflected walls. The advancing deformations of the western gable wall were stopped by stabilising its position with the steel elements connected with ties anchored in the ground. It was inadmissible to rectify this wall because it is covered with plaster and paint coats with a high historical value.
1 December 2020 in IOP Conference Series: Materials Science and Engineering
The displacements and forces were measured and analysed in the jacks on which the structure was rested during the complex renovation. The building was deflected from the vertical and its foundations were damaged. The renovation consisted in lifting the above-ground part of the structure and removing its deflection and then replacing the foundations. The building subject to renovation and investigations dates back to 1902; it is a historical structure and serves as a museum. The building is partially cellared, has two above-ground floors and a rectangular projection with 10.3 m and 10.7 m long sides. The building was vertically deflected by 31 mm/m. 27 hydraulic jacks were installed in order to remove the deflection in the axes of the cellar and foundation walls. With their help, the building was torn apart and then straightened by uneven lifting. After the rectification, the weight of the building was transferred onto a new system of supports transferring the load directly to the ground outside the foundations and the jacks located in the walls’ axes were dismounted. This made it possible to demolish the old stone foundations which were in very poor technical condition. New reinforced concrete strip foundations and foundation walls made of concrete blocks were made in their place. The forces and displacements in the jacks were continuously measured during the rectification. The article presents these measurements and establishes the relationships between the forces in the jacks and the displacements of the elevated building. The scope of the renovation and the innovative structural solutions applied in the construction of the foundations are also presented. The renovation of the deflected structure allowed to avoid demolition of the historic building and its re-assembly. Moreover, with the presented procedure, no damage was caused to the structure’s elements that were being lifted. The measurements of forces and displacements made it possible to determine the parameters of the straightened building.