Zahra Pezeshki

Ms. Zahra Pezeshki

Department of Industrial Heat Engineering Systems, National Research University "Moscow Power Engineering Institute", Moscow, Moskva, Russia
orcid
PhD Candidate

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 November 2016 in Archives of Computational Methods in Engineering
Verified
Journal Article
Closed access
PDF file
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
SISyed Ali Soleimani Ivari
Syed Ali Soleimani Ivari

4 April 2018 in Artificial Intelligence Review
Verified
Journal Article
Closed access
PDF file
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
SMSayyed Majid Mazinani
Sayyed Majid Mazinani

1 May 2019 in Journal of Building Engineering
Verified
Journal Article
Closed access
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
ASA. Soleimani
A. Soleimani
ADA. Darabi
A. Darabi

1 August 2018 in Construction and Building Materials
Verified
Journal Article
Closed access
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
ASA. Soleimani
A. Soleimani
ADA. Darabi
A. Darabi
SMS.M. Mazinani
S.M. Mazinani

1 December 2017
Verified
Conference Paper
Closed access
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
ASAli Soleimani
Ali Soleimani
ADAhmad Darabi
Ahmad Darabi
The complication of building constructions, with irregular geometry, different building materials, variable morphology, alterations and damages, poses numerous challenges in the digital modeling and simulation of structural performances under different types of actions. Most of the research is focused on importing Three Dimension (3D) geometry data in a Finite Element Method (FEM) applications. This paper presents an innovative two-step methodology (3ds MAX-to-FEM) able to convert a Three Dimension Studio Modeling, Animation & Rendering Software/Autodesk (3ds MAX) file into a FEM for structural simulation. In this study, the 3ds MAX file is a large building, has been carried out with an accurate survey that integrates geometrical aspects, element interconnections, and architectural considerations. Then it is turned into COMSOL Multiphysics environment and tested thermal simulation with a geometric rationalization which preserves irregularities and anomalies, such as verticality deviation and variable thickness. After setting material properties, loads, and boundary conditions, the structural simulation is run with a detailed model that respects the uniqueness and authenticity of the building. A real case study is illustrated and discussed to prove that a rigorous 3ds MAX to FEM workflow allows the generation of an accurate practical methodology for 3D visualization and simulation for thermal distribution operation in COMSOL. Structural simulation was carried out with a 3D mesh derived from the 3ds MAX file in order to take into consideration the geometrical irregularity of a building. COMSOL Multiphysics is a software tool uses artificial intelligent and soft computing for doing computations with high speed and accuracy, and computes and shows different types of phenomenon together. In this study simulation results compare with the reality results. Here, the advantages and disadvantages of the proposed approach are illustrated.

3 February 2025 in Human-Centric Intelligent Systems
Verified
Journal Article
Open access
PDF file
ADAmir Hossein Dalir
Amir Hossein Dalir
Zahra PezeshkiZahra Pezeshki
Zahra Pezeshki
MRMehdi Ravanshadnia
Mehdi Ravanshadnia
EKEugene Krinitsky
Eugene Krinitsky
ISIldar Aidarovich Sultanguzin
Ildar Aidarovich Sultanguzin
This paper presents a comprehensive scientific analysis of research on automatic monitoring in construction projects. Through a methodical examination of 857 bibliographic records from three databases, we find important trends, novel themes, and key research areas in this field. Our findings reveal that machine learning (ML), building information modelling (BIM), and deep learning are the most the most popular techniques for automatic monitoring. Furthermore, we identify construction technologies and artificial intelligence (AI) as the primary research foci. So, the study uncovers collaboration patterns among researchers and institutions, highlighting key players and their contributions, identifies research gaps and challenges, such as the need for integrating AI, big data, and cloud computing into construction project monitoring, and proposes future research directions to address these challenges and enhance the effectiveness of automatic monitoring systems. By providing a systematic review and insightful analysis, this study contributes to the advancement of construction project monitoring. It offers valuable insights for researchers, practitioners, and policymakers to foster innovation, improve project performance, and ensure sustainable construction practices.