Alessandra Arezza

Mrs. Alessandra Arezza

DGS S.p.A., Rome, Lazio, Italy
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 May 2022 in Processes
Verified
Journal Article
Open access
PDF file
FBFaezeh Bagheri
Faezeh Bagheri
Melissa DemartiniMelissa Demartini
Melissa Demartini
Alessandra ArezzaAlessandra Arezza
Alessandra Arezza
Flavio TonelliFlavio Tonelli
Flavio Tonelli
MPMassimo Pacella
Massimo Pacella
GPGabriele Papadia
Gabriele Papadia
In recent decades, manufacturers’ intense competitiveness to suit consumer expectations has compelled them to abandon the conventional workflow in favour of a more flexible one. This new trend increased the importance of master production schedule and make-to-order (MTO) strategy concepts. The former improves overall planning and controls complexity. The latter enables the production businesses to reinforce their flexibility and produce customized products. In a production setting, fluctuating resource capacity restricts production line performance, and ignoring this fact renders planning inapplicable. The current research work addresses the MPS problem in the context of the MTO production environment. The objective is to resolve Rough-Cut Capacity Planning by considering resource capacity fluctuation to schedule the customer’s order with the minimum cost imposed by the company and customer side. Consequently, this study is an initial attempt to propose a mathematical programming approach, which provides the optimum result for small and medium-size problems. Regarding the combinatorial intrinsic of this kind of problem, the mathematical programming approach can no longer reach the optimum solution for a large-scale problem. To overcome this, an innovative agent-based heuristic has been proposed. Computational experiments on variously sized problems confirm the efficiency of the agent-based approach.