Jose Jorge Muñoz

Mr. Jose Jorge Muñoz

University of Magdalena, Santa Marta, Magdalena, Colombia
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 October 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
Jose Jorge MuñozJose Jorge Muñoz
Jose Jorge Muñoz
Manuel J CampuzanoManuel J Campuzano
Manuel J Campuzano
JMJaime Mosquera
Jaime Mosquera
This paper studies an attribute control chart for monitoring the number of nonconforming items using a triple sampling (TS-np) which has not yet been applied to attribute control charts. The chart design and procedure for the decision about the state of the process are given. Mathematical expressions for the average run length (ARL) for in-control and out-of-control processes and the average sample number (ASN) are given. A bi-objective genetic algorithm that seeks to minimize the ASN and the probability of type 2 error is implemented in order to optimize the design of the TS-np control chart. A comparison between TS-np, single sampling np (SS-np), double sampling np (DS-np), and multiple dependent state repetitive sampling (MDSRS) control charts is carried out in terms of the out-of-control average run length (ARL1). Tables of ARL1 values for TS-np are presented in comparison with MDSRS and DS-np for various scenarios. The operation of the proposed control chart is shown through simulated data. Finally, it is concluded that the proposed TS-np chart has a better performance in terms of ARL1 detecting small and moderate shifts in the process nonconforming rate in-control (p0) compared with MDSRS and DS-np.

25 July 2023 in Stochastics and Quality Control
Verified
Journal Article
Closed access
Jose Jorge MuñozJose Jorge Muñoz
Jose Jorge Muñoz
Manuel J CampuzanoManuel J Campuzano
Manuel J Campuzano
VDVerónica Deibe-Blanco
Verónica Deibe-Blanco
In this paper, a c-control chart using a triple sampling scheme (TS-c) is studied. The chart design, procedure, and a bi-objective optimization model are given to optimize the TS-c-chart. The Average Run Length for in-control and out-of-control ( ARL 1 ), and Average Sample Number metrics are calculated. A Comparison among TS-c, Fixed parameters c (FP-c), VSS-c, EWMA-c, and Double Sampling c (DS-c) control charts are carried out in terms of ARL 1 . The proposed TS-c-chart has lower ARL 1 values for detecting small and moderate shifts in the mean number of non-conformities in control compared with FP-c, VSS-c, EWMA-c, and DS-c.

21 December 2020 in Entre Ciencia e Ingeniería
Verified
Journal Article
Open access
PDF file
JSJhon Jairo Vargas Sánchez
Jhon Jairo Vargas Sánchez
Jose Jorge MuñozJose Jorge Muñoz
Jose Jorge Muñoz
NLNayeth Alejandra Paba Luna
Nayeth Alejandra Paba Luna
NCNicolás Ordoñez Castro
Nicolás Ordoñez Castro
In this article, the improvement of the manufacturing process of a construction brick producing company in the city of Santa Marta was studied. By simulation, the current process has been modeled and improvement alternatives have been established. The performance of these simulated processes has been assessed using the variables cost per lot (in Colombian pesos) and the time in the System (in hours), both programmed in the simulated models and which were established as control variables. These variables are the components of a bivariate vector whose values were obtained from samples derived from replicating each of the models, which were then analyzed using a technique derived from multivariate statistics called Manova. The multivariate hypothesis test shows that one of the models presents better performance. Based on the results, it is concluded that the company should adopt the improvement found in the simulation.

Verified
Journal Article
Open access
PDF file
Jose Jorge MuñozJose Jorge Muñoz
Jose Jorge Muñoz
Manuel J CampuzanoManuel J Campuzano
Manuel J Campuzano
RARick Acosta-Vega
Rick Acosta-Vega
Machine learning (ML) can guide measurement allocation, but predictive accuracy does not establish operational value. We evaluate whether a bounded ML allocator improves industrial monitoring when a frozen variance detector retains alarm authority. The evaluation combines five run-grouped test folds on the Skoltech Anomaly Benchmark (SKAB), an illustrative two-event MetroPT-3 replay, and 1800 controlled policy runs. On SKAB, ML rollout achieved physical-event recall of 0.636 versus 0.697 for the smallest fixed policy; the paired 95% interval for the difference included zero. It required 5.985 additional observations per system epoch, an acquisition proxy rather than measured energy or monetary expenditure. Precursor skill varied across runs, and controlled tests exposed sensitivity to distribution shift. Delay-only break-even analysis identified a high cost ratio needed to favor ML. MetroPT-3 illustrates cadence sensitivity but cannot establish field reliability. The contribution is a reproducible seven-gate evaluation procedure linking precursor validity, detector suitability, resource use, uncertainty, and deployment decisions. The findings support withholding autonomous deployment of this specific univariate variance-monitoring configuration; they do not establish the performance of multivariate or distributionally robust allocation methods.