Saman Baharvand

Dr. Saman Baharvand

The University of Texas at Arlington, Arlington, Massachusetts, USA
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 November 2020 in Iranian Journal of Science and Technology, Transactions of Civil Engineering
Verified
Journal Article
Closed access
PDF file
Saman BaharvandSaman Baharvand
Saman Baharvand
AJAli Jozaghi
Ali Jozaghi
RFReza Fatahi-Alkouhi
Reza Fatahi-Alkouhi
SKSaeed Karimzadeh
Saeed Karimzadeh
RNRuhollah Nasiri
Ruhollah Nasiri
BLBabak Lashkar-Ara
Babak Lashkar-Ara

15 September 2022 in International Journal of Sediment Research
Verified
Journal Article
Closed access
Saman BaharvandSaman Baharvand
Saman Baharvand
HAHabib Ahmari
Habib Ahmari
PTPoorya Taghvaei
Poorya Taghvaei

1 June 2021 in Ecological Engineering
Verified
Journal Article
Closed access
Saman BaharvandSaman Baharvand
Saman Baharvand
BLBabak Lashkar-Ara
Babak Lashkar-Ara

22 March 2024 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
Saman BaharvandSaman Baharvand
Saman Baharvand
HAHabib Ahmari
Habib Ahmari

16 September 2022 in Land
Verified
Journal Article
Open access
PDF file
HAHabib Ahmari
Habib Ahmari
MPMatthew Pebworth
Matthew Pebworth
Saman BaharvandSaman Baharvand
Saman Baharvand
SKSubhas Kandel
Subhas Kandel
Xinbao YuXinbao Yu
Xinbao Yu
Erosion is a natural process, but it can be accelerated by anthropogenic activities. Two of the predominant types of human-induced erosion are related to agricultural and construction activities. Of the two, construction-induced erosion is more severe because of the simultaneous removal of the land cover, disturbance of the soil, and eventual compaction of the soil by heavy machinery. Eroded materials released from bridge construction sites can alter the sediment regime and geomorphological conditions of receiving streams and may have short- and long-term impacts on aquatic habitats. Several models have been developed to estimate the total amount of soil erosion and sediment yield; however, no predictive model is available to quantify the potential release of sediment during the construction of bridges or to predict the quantity, size fraction, and accumulation depths for the extent of the measurable downstream effect. A GIS-based predictive sediment toolkit is developed to estimate the overland erosion and to determine the potential depositional area and suspended sediment concentration downstream of bridges. The performance of the GIS toolkit in estimating soil erosion was assessed using field data collected from the Wilson Creek bridge construction site in McKenney, Texas, U.S., and it was concluded that it predicted the overland erosion rate and sediment yield within the ranges observed in the field.

1 August 2021 in Journal of Irrigation and Drainage Engineering
Verified
Journal Article
Closed access
PDF file
Zohrab SamaniZohrab Samani
Zohrab Samani
Saman BaharvandSaman Baharvand
Saman Baharvand
SDSeth Davis
Seth Davis
The design and calibration of a simple rectangular flume with central cylindrical contraction is presented. The flume is designed based on principles of critical flow in open channels. Critical flow is created through contraction of flow cross section by installing a vertical cylindrical column at the center of a rectangular open channel. The stage–discharge relationship was calibrated using a laboratory prototype with various configurations. A previously developed model was recalibrated using the laboratory data for the proposed flume. The results of the proposed stage relationship were also compared with results from a computational fluid dynamics model (CFD). The results and analysis show that if the piezometric head is measured at midstream at the upstream side of the contracting column, then stage–discharge relationship can be developed, which is independent of the contraction ratio. The stage–discharge function developed in this paper can be used for design and calibration of the flume regardless of the flume size or contraction ratio. The stage–discharge relationship equation is also compared with another set of independently measured laboratory data.