Underground reservoir water storage technology has become one important way to achieve efficient coal mining and water resource protection in the western mining areas of China, and the width of coal pillar dams is an important factor affecting the safe operation of underground reservoirs. In order to study the limitations on the reasonable size of a coal pillar dam, Daliuta Mine was selected as the engineering background and a theoretical formula for the reasonable width of a coal pillar dam was proposed. By combining theoretical analysis with numerical simulation analysis, the main influencing factors of the coal pillar dam were compared and analyzed. The research results indicated that changes in the mining height and coal parameters can cause a sharp change in the width of the plastic zone of the dam body. Then, mine water will have an impact on the width of the plastic zone and the width of the elastic core. Moreover, when the width of the coal pillar is smaller than the theoretically calculated width of the coal pillar dam body, the deviator stress and vertical stress inside the dam will significantly increase, and the plastic zone of the dam will significantly expand.
In order to control the large deformation of deep roadway, this paper analyzes the initiation conditions of abrasive jet slotting and fracturing, uses Fluent and UDEC to simulate and analyze the effect of low-pressure abrasive jet and the effect of slotting-fracturing integrated roof cutting and pressure relief, and conducts experiments in the field. The results show that the purpose of abrasive jet is to form prefabricated cracks and crack damage zones on the hole wall, providing an advantageous channel for hydraulic fracturing. In a certain range, with the increase of incident pressure, abrasive particle diameter and nozzle diameter, the effect of abrasive jet is improved, and the influence of incident pressure is the most significant. After the application of low-pressure abrasive jet slotting-fracturing integration technology in the field, the displacement of the roadway on the side of the goaf is significantly reduced, and the pressure relief effect of the roadway is good. The numerical simulation results also show that after the slotting fracturing pressure relief, the peak value and concentration coefficient of the bearing stress inside the retained coal pillar are reduced, and the damage zone around the roadway is relatively reduced.
6 February 2026 in Rock Mechanics and Rock Engineering