Jacobus Daniel van der Walt

Jacobus Daniel van der Walt

Auto-generated profile, based on publicly available information

Jacobus Daniel van der Walt


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 July 2021 in Buildings
Verified
Journal Article
Open access
PDF file
TPTIRTH PATEL
TIRTH PATEL
HBHirakraj Bapat
Hirakraj Bapat
DPDaksh Patel
Daksh Patel
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
The architecture, engineering, and construction (AEC) industry has seen a significant rise in the adoption of Building Information Modeling (BIM) in the last few years. BIM software have launched with numerous robust capabilities and features to satisfy the ever-demanding needs of the AEC industry. Various factors are associated with the selection of BIM software depending on a company’s requirements and constraints. BIM software selection is a daunting process as most AEC industries are unaware of the factors to consider when making this important decision. This study focuses on identifying the critical success factors (CSFs) and their interrelationship for efficient BIM software selection. For this research, a questionnaire was developed and disseminated in two stages in India, the United States of America (U.S.A.), Germany, and the United Kingdom (U.K.). In the first stage, a total of twenty-six identified CSFs were analyzed with the factor comparison method (FCM) to identify the top fifteen CSFs. Subsequently, the identified top fifteen CSFs were further assessed by implementing Fuzzy DEMATEL to categorize them into cause-and-effect groups based on respective influence strength, depicted with a causal diagram. Out of fifteen CSFs, five and ten factors were grouped into the cause group and effect group for BIM software selection, respectively. The most important factors were identified as software functionality, BIM adoption strategies and processes, interoperability, staff competencies, BIM standards and regional regulations. The outcome of this research can help BIM user companies improve their BIM software selection framework and decision-making process during purchasing software.

20 December 2022 in Buildings
Verified
Journal Article
Open access
PDF file
TPTIRTH PATEL
TIRTH PATEL
Brian H.W. GuoBrian H.W. Guo
Brian H.W. Guo
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
Yang ZouYang Zou
Yang Zou
As-built progress of the constructed pavement should be monitored effectively to provide prompt project control. However, current pavement construction progress monitoring practices (e.g., data collection, processing, and analysis) are typically manual, time-consuming, tedious, and error-prone. To address this, this study proposes sensors mounted using a UGV-based methodology to develop a pavement layer change classifier measuring pavement construction progress automatically. Initially, data were collected using the UGV equipped with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope, and GPS sensor in a controlled environment by constructing various scenarios of pavement layer change. Subsequently, four Long Short-Term Memory network variants (LSTMs) (LSTM, BiLSTM, CNN-LSTM, and ConvLSTM) were implemented on collected sensor data combinations for developing pavement layer change classifiers. The authors conducted the experiment to select the best sensor combinations for feature detection of the layer change classifier model. Subsequently, individual performance measures of each class with learning curves and confusion matrices were generated using sensor combination data to find out the best algorithm among all implemented algorithms. The experimental result demonstrates the (az + gx + D) sensor combination as the best feature detector with high-performance measures (accuracy, precision, recall, and F1 score). The result also confirms the ConvLSTM as the best algorithm with the highest overall accuracy of 97.88% with (az + gx + D) sensor combination data. The high-performance measures with the proposed approach confirm the feasibility of detecting pavement layer changes in real pavement construction projects. This proposed approach can potentially improve the efficiency of road construction progress measurement. This research study is a stepping stone for automated road construction progress monitoring.

4 July 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
TPTIRTH PATEL
TIRTH PATEL
Brian H.W. GuoBrian H.W. Guo
Brian H.W. Guo
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
Yang ZouYang Zou
Yang Zou
Purpose: Current solutions for monitoring the progress of pavement construction (such as collecting, processing and analysing data) are inefficient, labour-intensive, time-consuming, tedious and error-prone. In this study, an automated solution proposes sensors prototype mounted unmanned ground vehicle (UGV) for data collection, an LSTM classifier for road layer detection, the integrated algorithm for as-built progress calculation and web-based as-built reporting. Design/methodology/approach: The crux of the proposed solution, the road layer detection model, is proposed to develop from the layer change detection model and rule-based reasoning. In the beginning, data were gathered using a UGV with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope and GPS sensor in a controlled environment. The long short-term memory (LSTM) algorithm was utilised on acquired data to develop a classifier model for layer change detection, such as layer not changed, layer up and layer down. Findings: In controlled environment experiments, the classification of road layer changes achieved 94.35% test accuracy with 14.05% loss. Subsequently, the proposed approach, including the layer detection model, as-built measurement algorithm and reporting, was successfully implemented with a real case study to test the robustness of the model and measure the as-built progress. Research limitations/implications: The implementation of the proposed framework can allow continuous, real-time monitoring of road construction projects, eliminating the need for manual, time-consuming methods. This study will potentially help the construction industry in the real time decision-making process of construction progress monitoring and controlling action. Originality/value: This first novel approach marks the first utilization of sensors mounted UGV for monitoring road construction progress, filling a crucial research gap in incremental and segment-wise construction monitoring and offering a solution that addresses challenges faced by Unmanned Aerial Vehicles (UAVs) and 3D reconstruction. Utilizing UGVs offers advantages like cost-effectiveness, safety and operational flexibility in no-fly zones.

12 October 2023 in International Journal of Pavement Engineering
Verified
Journal Article
Open access
YLYu Li
Yu Li
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
ESEric Scheepbouwer
Eric Scheepbouwer
BGBrian Guo
Brian Guo
TPTIRTH PATEL
TIRTH PATEL

1 January 2025 in Advances in Civil Engineering
Verified
Journal Article
Open access
AKAashish Khadka
Aashish Khadka
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
MPMarkus Pahlow
Markus Pahlow
Culverts are essential for the sustainability and safety of transportation infrastructure. Despite their significance, they are often insufficiently managed, leading to significant socioeconomic and environmental repercussions. This systematic review critically evaluates the current state of roadway culvert asset management (RCAM), focusing on inspection technologies, factors influencing culvert deterioration, and predictive models for condition forecasting. Using the Preferred Reporting Items for Systematic Reviews and Meta‐Analyses (PRISMA) methodology, this review synthesizes findings from 86 key studies published between 1988 and 2023, sourced from Scopus, ScienceDirect, and Google Scholar. By employing scientometric mapping research trends and keyword relationships within RCAM are determined. The review identifies critical limitations in existing practices, including a predominant reliance on labor‐intensive and subjective inspections, and the absence of real‐time data integration in predictive models. These gaps lead to delayed interventions, escalating risks of costly infrastructure failures, such as roadway collapses. The integration of cost‐effective advanced sensor technologies and machine learning algorithms for real‐time monitoring and predictive analytics emerges as a transformative solution. This study underscores the urgent need to adopt these technologies in RCAM to enhance infrastructure sustainability, reduce maintenance costs, and mitigate catastrophic failures.

25 November 2024 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
YLYu Li
Yu Li
JWJacobus Daniel van der Walt
Jacobus Daniel van der Walt
ABAlan Basnet
Alan Basnet
TATejaswi Acharya
Tejaswi Acharya
ESEric Scheepbouwer
Eric Scheepbouwer
TPTirth Patel
Tirth Patel
The New Zealand government has introduced cycleways on existing narrow roads, leading to disruptions and inconsistencies for both motorists and cyclists. The effect on their behaviour about positioning, however, remains uncertain. This research paper investigated lateral positioning and lateral clearance using multiple Internet of Things prototypes to quantify the relationship between motor vehicles and cyclists. Two methods were used: (1) sensors mounted on the pavement curb to collect positioning data, and (2) sensors mounted on a cyclist to collect lateral clearance data. Results show that heavy vehicles have the highest encroachment rate. Additionally, the cycleway helps steer motorists slightly farther away from cyclists while passing. The lateral clearance between cyclists and motorists on roads with cycle lanes is higher than on roads without cycle lanes. It was found that over 90% of motor vehicles meet the 1 m separation standard, as recommended by the NZ Cycling Safety Panel.