Concrete and asphalt are the two competitive materials for a highway. In Sweden, the predominant material for the highway system is asphalt. But under certain conditions, concrete pavements are competitive alternatives. For example, concrete pavements are suitable for high-traffic volume roads, roads in tunnels, concentrated loads (e.g., bus stops and industrial pavement). Besides the load-carrying capacity, the concrete pavement has many advantages such as durability (wear resistance), resistance against frost heave, environment (pollution, recycling, and low rolling resistance leading to fuel savings), fire resistance, noise limitations, brightness, evenness and aesthetics. Concrete pavements are long-lasting but need final repair. Single slabs may crack in the jointed concrete pavement due to various structural and non-structural factors. Repair and maintenance operations are, therefore, necessary to increase the service life of the structures. To avoid extended lane closures, prevent traffic congestions, and expedite the pavement construction process, precast concrete technology is a recent innovative construction method that can meet the requirement of rapid construction and rehabilitation of the pavement. This paper evaluates rapid repair techniques of concrete pavement using precast concrete technology by analysing three case studies on jointed precast concrete pavements. The study showed that the required amount of time to re-open the pavement to traffic is dramatically reduced with jointed precast concrete panels.
Transverse joints are introduced in jointed plain concrete pavement systems to mitigate the risk of cracks that can develop due to shrinkage and temperature variations. However, the structural behaviour of jointed plain concrete pavement (JPCP) is significantly affected by the transverse joint, as it creates a discontinuity between adjacent slabs. The performance of JPCP at the transverse joints is enhanced by providing steel dowel bars in the traffic direction. The dowel bar provides reliable transfer of traffic loads from the loaded side of the joint to the unloaded side, known as load transfer efficiency (LTE) or joint efficiency (JE). Furthermore, dowel bars contribute to the slab’s alignment in the JPCP. Joints are the critical component of concrete pavements that can lead to various distresses, necessitating rehabilitation. The Swedish Transport Administration (Trafikverket) is concerned with the repair of concrete pavement. Precast concrete slabs are efficient for repairing concrete pavement, but their performance relies on well-functioning dowel bars. In this study, a three-dimensional finite element model (3D-FEM) was developed using the ABAQUS software to evaluate the structural response of JPCP and analyse the flexural stress concentration in the concrete slab by considering the dowel bar at three different locations (i.e., at the concrete slabs’ top, bottom, and mid-height). Furthermore, the structural response of JPCP was also investigated for several important parameters, such as the joint opening between adjacent slabs, mispositioning of dowel bars (horizontal, vertical, and longitudinal translations), size (diameter) of the dowel bar, and bond between the slab and the dowel bar. The study found that the maximum LTE occurred when the dowel bar was positioned at the mid-depth of the concrete slab. An increase in the dowel bar diameter yielded a 3% increase in LTE. Conversely, the increase in the joint opening between slabs led to a 2.1% decrease in LTE. Additionally, the mispositioning of dowel bars in the horizontal and longitudinal directions showed a 2.1% difference in the LTE. However, a 0.5% reduction in the LTE was observed for a vertical translation. Moreover, an approximately 0.5% increase in LTE was observed when there was improved bonding between the concrete slab and dowel bar. These findings can be valuable in designing and evaluating dowel-jointed plain concrete pavements.
Aggregate interlocking and dowel bar systems are the two primary mechanisms in a jointed plain concrete pavement for transferring the wheel loads from the loaded slab to the adjacent unloaded slab, avoiding critical stresses and excessive deformations across the joint. Aggregate interlocking is suitable for small joint openings, while the dowel bar provides effective load transmission for both smaller and wider joint openings. In this study, a three-dimensional finite element model was developed to investigate the structural performance of dowelled jointed plain concrete pavements. The developed model was compared with an analytical solution, i.e., Westergaard’s method. The current study investigated the effectiveness of the dowel bars in jointed plain concrete pavements considering the modulus of elasticity and the thickness of the base layer, as well as dowel bar diameter and length. Furthermore, the load transfer efficiency (LTE) of a rounded dowel bar was compared with that of plate dowel bars (i.e., rectangular and diamond-shaped dowel bars) of a similar cross-sectional area and length. This study showed that the LTE was enhanced by 4% when the base layer’s modulus of elasticity increased from 450 MPa to 6000 MPa, while the increase in stress was 23%. A 1.2% improvement in the LTE and a 2.1% reduction in flexural stress were observed as the base layer’s thickness increased from 100 to 250 mm. Moreover, increasing the dowel bar’s diameter from 20 mm to 38 mm enhanced the LTE by 4.3% and 3.8% for base layer moduli of 450 MPa and 4000 MPa, respectively. The corresponding rise in stresses was 10% and 5%. The diamond-shaped dowel bar of a 50 × 32 mm size showed a 0.48% increase in the LTE, while sizes of 100 × 16 mm and 200 × 8 mm reduced the stress 6.7% and 23.1%, respectively, compared to that in the rounded dowel bar. With rectangular dowel bars, a 4% rise in the stress was noted compared to that with the rounded dowel bar. Increasing the length of the diamond-shaped dowel bar slightly improved the LTE but had no impact on the stress in the concrete slab. The findings from this study can help highway engineers improve pavements’ durability, make cost-effective decisions, contribute to resource savings in large-scale concrete pavement projects, and enhance the overall quality of infrastructure.