With the start of the COVID-19 pandemic and the resulting contact restrictions, conducting field trips to hydrological research basins became close to impossible. Hydrological field knowledge is an essential part of hydrological education and research. In order to impart this knowledge to students of hydrological engineering subjects in times or situations where on-site exploration is not possible, the VR4Hydro tool was developed. VR4Hydro is a virtual reality platform built from 360° panoramas that allows users to interactively explore the Gersprenz River basin in Germany. The following study seeks to investigate the applicability of performing virtual field trips in the context of hydrological education by evaluating user experience. Sixteen students of the subject engineering hydrology were asked to document their experiences with VR4Hydro using a qualitative approach by answering a series of multiple-choice questions as well as long-answer text questions. The analysis and discussion of the results showed that virtual excursions generally met with great interest among users. The majority rated the virtual tour as a valuable addition to traditional teaching methods. All students found the tool particularly appealing in cases where external circumstances did not allow for a real excursion. The findings of this study show that the application of virtual field trips (VFT) in hydrological engineering can be a valuable supplement to real field trips to improve the interest and learning outcome of students.
The goals of fire protection activities are to prevent fires, rescue people and ensure the effectiveness of firefighting. To achieve these goals for complex buildings, holistic fire protection concepts are developed which should take into account the special characteristics of each building. To ensure fire safety during the building lifecycle, a maintenance strategy is required. This includes recurring site inspections by experts, especially when a building needs to be refurbished or in the context of a technical due diligence during real estate transactions. If a malfunction of a fire safety element is detected in the context of these inspections, this is called a fire protection deficiency. These deficiencies decrease the fire safety rating of the building, increase the risk level, and result in deferred maintenance costs. For the analysis of the fire risk level and for risk comparisons between buildings and fire protection concepts, different techniques and approaches are available and are summarized under the term risk methods. A problem during this process is that findings and results from risk assessments are difficult to bring together with the real building. Information of the influence of individual fire safety deficiencies (technical, structural fire protection elements/components) on the risk level of the whole building and the associated repair and replacement costs are not directly related. This relationship must be associated in the expert's mind based on different documents. To overcome these limitations and to support the planning of deferred maintenance tasks, the goal of the presented approach is to visualize all required information within a BIM environment.
Traditional construction logistics rely on manual processes and fragmented tools, leading to inefficient planning, poor communication, and disorganized supply chains. Despite advances in digitalization, there is a lack of integrated, data-driven approaches tailored to construction logistics. To address this gap, this paper adopts a design-science approach to develop and evaluate a modular Digital Twin (DT) framework, the ConLogTwin. The framework integrates planning data with real-time site data through a robust data storage layer and digital services for automated planning and analytics. A prototype demonstrates the technical feasibility of mirroring both physical and organizational setups of projects, enabling more efficient and adaptive logistics management. The work contributes a modular reference architecture that integrates established open-source tools into a coherent, adaptable framework for construction logistics, enhancing practical applicability and lowering implementation barriers. A limitation is that the framework has not yet been validated in a full-scale field study, leaving its effectiveness in practice to be tested in a future study.