Kyong Ju Kim

Prof. Kyong Ju Kim


Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2010 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
KKKyong Ju Kim
Kyong Ju Kim
KKKyoungmin Kim
Kyoungmin Kim
This study proposes a preliminary cost estimation model using case-based reasoning (CBR) and genetic algorithm (GA). In measuring similarity and retrieving similar cases from a case base for minimum prediction error, it is a key process in determining the factors with the greatest weight among the attributes of cases in the case base. Previous approaches using experience, gradient search, fuzzy numbers, and analytic hierarchy process are limited in their provision of optimal solutions. This study therefore investigates a GA for weight generation and applies it to real project data. When compared to a conventional construction cost estimation model, the accuracy of the CBR- and GA-based construction cost estimation model was verified. It is expected that a more reliable construction cost estimation model could be designed in the early stages by using a weight estimation technique in the development of a construction cost estimation model.

1 November 2010 in Automation in Construction
Verified
Journal Article
Closed access
KKKyoungmin Kim
Kyoungmin Kim
KKKyong Ju Kim
Kyong Ju Kim

31 January 2003 in Automation in Construction
Verified
Journal Article
Closed access
KKKyong Ju Kim
Kyong Ju Kim
GGG.Edward Gibson
G.Edward Gibson

1 November 2009 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
KKKyong Ju Kim
Kyong Ju Kim
KKKyoungmin Kim
Kyoungmin Kim
CKChan Sung Kang
Chan Sung Kang
The accuracy of early cost estimates in engineering and construction projects is extremely important to both feasibility study and evaluation of design alternatives. In particular, to evaluate alternatives at the design stage, quick and accurate decision-making is needed under a limited definition of scope and constraints in available information and time. This study suggests an approximate cost estimation model for PSC Beam bridges based on the quantity of standard work. For model development, this study analyzed cost structure and proportion of cost items through bill of materials and quantities, identified 8 representative work items (Manufacturing PSC Beam, material, rebar fabrication/placing, supporting post/scaffolding, form work, slab waterproofing, concrete placing, deck finishing), and established approaches for quantify estimating on the work items. By utilizing the characteristics of bridges, the suggested model supports quick cost estimation with only three input values (length of span, total length of bridge, and width). The developed model is applied to 39 real projects for validation. The result of the application showed the accuracy with estimation error less than 4.04%.

14 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
EKEu Wang Kim
Eu Wang Kim
YSYeon Ju Shin
Yeon Ju Shin
KKKyong Ju Kim
Kyong Ju Kim
SKSehoon Kwon
Sehoon Kwon
Construction contract review demands specialized expertise, requiring comprehensive understanding of both technical and legal aspects. While AI advancements offer potential solutions, two problems exist: LLMs lack sufficient domain-specific knowledge to analyze construction contracts; existing RAG approaches do not effectively utilize domain expertise. This study aims to develop an automated contract review system that integrates domain expertise with AI capabilities while ensuring reliable analysis. By transforming expert knowledge into a structured knowledge base aligned with the SCF classification, the proposed structured knowledge-integrated RAG pipeline is expected to enable context-aware contract analysis. This enhanced performance is achieved through three key components: (1) integrating structured domain knowledge with LLMs, (2) implementing filtering combined with hybrid dense–sparse retrieval mechanisms, and (3) employing reference-based answer generation. Validation using Oman’s standard contract conditions demonstrated the system’s effectiveness in assisting construction professionals with contract analysis. Performance evaluation showed significant improvements, achieving a 52.6% improvement in Context Recall and a 48.3% improvement in Faithfulness compared to basic RAG approaches. This study contributes to enhancing the reliability of construction contract review by applying a structured knowledge-integrated RAG pipeline that enables the accurate retrieval of expert knowledge, thereby addressing the industry’s need for precise contract analysis.

1 November 2016 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
KKKyong Ju Kim
Kyong Ju Kim
WYWon Gun Yun
Won Gun Yun
IKIn Kyum Kim
In Kyum Kim
At present, there is no criterion to estimate the construction duration of a dam in the planning stage. Public agents estimate the construction duration of a dam based on their experience or sometimes, their needs. It often results in insufficient construction time during the construction stage. This results in quality deterioration and economic loss because of carrying out work on urgent basis frequently. Therefore, there has been a constant need for the estimation model of construction duration. This study targets Concrete-Faced Rock-fill Dam (CFRD), which is the most constructed type of dams in Korea. It aims to develop a model for the estimation of the construction duration of a dam in the planning stage. For this purpose, standard C.P. is identified from the process planning data, and the properties of the standard C.P. are analyzed to estimate the duration of each activity on C.P., and then two construction duration estimation models for CFRD are proposed. The results show that the two models have an error under 10% when compared with the estimation based on detailed design.