Claudio Mourgues

Dr. Claudio Mourgues

orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2018 in Energy and Buildings
Verified
Journal Article
Closed access
PAPaz Arroyo
Paz Arroyo
CMClaudio Mourgues
Claudio Mourgues
FFForest Flager
Forest Flager
MCMaría Gabriela Correa
María Gabriela Correa

30 September 2021 in Buildings
Verified
Journal Article
Open access
PDF file
Rodrigo F. HerreraRodrigo F. Herrera
Rodrigo F. Herrera
CMClaudio Mourgues
Claudio Mourgues
LUIS ALARCONLUIS ALARCON
LUIS ALARCON
EPEugenio Pellicer
Eugenio Pellicer
There is qualitative evidence showing that design teams that use BIM-lean management have a higher level of interaction than design teams that do not use this management approach. However, there is no quantitative empirical evidence of this higher level of interaction. Therefore, the objective of this paper is to present quantitative empirical evidence of the differences among the various types of interactions of a design team. Two case studies were analyzed, and their design management was assessed from a lean BIM perspective while their team interactions were assessed using social network analysis (SNA). To achieve the aim of this paper, four steps were performed: (1) case study selection; (2) description of the design management of the projects from the lean design management and BIM perspectives; (3) assessment of design team interaction; and (4) comparison using SNA. The results show that the project that applied BIM-lean management exhibited higher levels of interactions among its design team members than the traditional team; transparent, orderly, and standardized information flows; a collaborative, trusting, and learning environment; and commitment management. None of these interaction elements were visible in the project that did not apply BIM-lean management. It is suggested that an analysis be performed on a representative sample of projects in the future so that conclusive statistical inferences could be made.

1 December 2016 in Revista de la construcción
Verified
Journal Article
Open access
PDF file
MMMaría G Mandujano
María G Mandujano
LUIS ALARCONLUIS ALARCON
LUIS ALARCON
JKJohn Kunz
John Kunz
CMClaudio Mourgues
Claudio Mourgues
In recent years, the Architecture, Engineering, and Construction (AEC) industry has broadly expanded the use of Virtual Design and Construction (VDC), particularly Lean Construction methods, to deliver value to their customers. VDC includes the use of Production Management using Lean methods as an integral part of the defining theory and method, and multiple case studies have concluded that the greatest performance improvement is achieved by implementing both initiatives together. This paper reviews extensive literature of VDC and Lean Construction with the intent to show benefits in the application of Lean Construction in the actual practice of VDC and to provide examples of waste and opportunities for improvement in projects if Lean methods are applied. This study found that use of Lean methods can help to reduce waste within the VDC process, in the phase of information flow (process view). Specifically, our main finding from this study was that only five types of waste represent 80% of the referenced occurrence of waste in VDC processes, which suggests that if teams use Lean Methods and focus on elimination of these types of waste (i.e., motion (excess), inventory (excess), overproduction, waiting and employee knowledge (unused)), teams can improve VDC practices dramatically.

18 December 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
Rodrigo F. HerreraRodrigo F. Herrera
Rodrigo F. Herrera
CMClaudio Mourgues
Claudio Mourgues
LUIS ALARCONLUIS ALARCON
LUIS ALARCON
EPEugenio Pellicer
Eugenio Pellicer
Evidence exists for the application of lean management practices in the design process. However, there is no systematic review of this type of practice that links the design management practices to the lean construction principles. There is no tool to assess the level of use of lean design management practices in construction projects either. Therefore, this paper aims to assess the lean management practices that are performed at the design phase of construction projects. The research was divided into a literature review of design management practices; a validation of lean design management practices with a practice–principle relationship, based on an expert survey; the devolvement of a tool (questionnaire) to evaluate the lean design management practices; and an assessment in 64 construction projects (coherence, reliability, correlation, and descriptive analysis). It is concluded that evidence exists for the implementation of 19 lean design management practices. These practices are grouped into three categories: stakeholder management, planning and control, and problem solving and decision making. Additionally, in the assessment of the 64 projects, it can be observed that the lean design management practices are at initial levels of implementations, so there is a significant development gap. This research proposes a tool to assess management practices in the design phase of construction projects; then, the study identifies implementations gaps, it provides benchmarks with other projects, and it improves the design process through a taxonomy of lean design management practices.

21 May 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
ZGZulay Giménez
Zulay Giménez
CMClaudio Mourgues
Claudio Mourgues
LUIS ALARCONLUIS ALARCON
LUIS ALARCON
HMHarrison Mesa
Harrison Mesa
EPEugenio Pellicer
Eugenio Pellicer
The architecture, engineering, and construction industry requires methods that link the capture of customer requirements with the continuous measurement of the value generated and the identification of value losses in the design process. A value analysis model (VAM) is proposed to measure the value creation expected by customers and to identify value losses through indexes. As points of reference, the model takes the Kano model and target costing, which is used in the building project design process. The VAM was developed under the design science research methodology, which focuses on solving practical problems by producing outputs by iteration. The resulting VAM allowed the measurement and analysis of value through desired, potential, and generated value indexes, value loss identification, and percentages of value fulfillment concerning the design stage. The VAM permits the comparison of different projects, visualization of the evolution of value generation, and identification of value losses to be eradicated. The VAM encourages constant feedback and has potential to deliver higher value, as it enables the determination of parameters that add value for different stakeholders and informs designers where to direct resources and efforts to enhance vital variables and not trivial variables.

1 January 2021 in Waste Management
Verified
Journal Article
Closed access
CPCatalina Pérez
Catalina Pérez
PAPaz Arroyo
Paz Arroyo
CRChris Richards
Chris Richards
CMClaudio Mourgues
Claudio Mourgues