Re-baking is an excessively economical phase in the graphite electrode and anodes manufacturing industries, these electrodes and anodes are very important for the global aluminium and steel sectors. The creation of graphite electrodes which are extensively utilized in electric arc furnaces for the production of steel, involves a crucial procedure called re-baking. However, high-temperature technique is an energy-intensive process that results in significant heat loss, raising operational costs and harming the environment. To address the problems of corrosion control and energy saving, this study examines the use of heat recycling techniques in the re-baking process for producing graphite electrodes. This strategy analyzes potential ways to increase the energy efficiency of an active oil-fired re-baking furnace. Significant increases in the heat transfer rate of 19.56% as per data collection and investigation and the combustion air volume and temperature rise by 25.49% and66.67%. This research identified chances to save energy 26.08% of power and 40% of oil saving per hour.
31 January 2024 in Research Square
In the pneumatic conveying system the graphite powder conveyed from furnace to silos with the help of compressed air but presence of moisture in this air creates lumps formation in mild steel pipe result choking and system under breakdown. In this paper a practical modification has been done in graphite manufacturing industry to improve the system efficiency of compressor unit by recycling heat with an additional heat exchanger and improve cost control of pneumatic conveying system. This study investigates that potential of heat recycling to enhance the efficiency of pneumatic conveying systems in the graphite manufacturing industry. Coefficient of performance improves (COP) up to 75.2% ,with reduction in down time 75%,increasing availability of pneumatic conveying 23.7% and reduces in cost of steel pipe material up to 66.67% & labour cost 90%. Effectiveness of heat exchanger and heat transfer rate found 63.51% and 16.907 KW respectively.