Frédéric Le Pimpec

Dr. Frédéric Le Pimpec

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 March 2026 in Instruments
Verified
Journal Article
Open access
PDF file
Frédéric Le PimpecFrédéric Le Pimpec
Frédéric Le Pimpec
WWWard Andrew Wurtz
Ward Andrew Wurtz
JVJohannes Manfred Vogt
Johannes Manfred Vogt
XSXavier Stragier
Xavier Stragier
TSTylor Sové
Tylor Sové
AVAnne Vanselow
Anne Vanselow
After approximately 60 years of service, the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B-type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling-wave accelerating structures technology already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 m long, delivering a 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one klystron modulator, and the last two RF structures receive their RF power from a second klystron modulator that passes through a SLED system. The SLED system multiplies the peak power by a factor of 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.

7 January 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
Frédéric Le PimpecFrédéric Le Pimpec
Frédéric Le Pimpec
WWWard Andrew Wurtz
Ward Andrew Wurtz
JVJohannes Manfred Vogt
Johannes Manfred Vogt
XSXavier Stragier
Xavier Stragier
TSTylor Sové
Tylor Sové
AVAnne Vanselow
Anne Vanselow
After approximately 60 years of service the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling wave accelerating structures technology, already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 meters long, delivering 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one modulator-klystron and the last two RF structures receive their RF power from a second modulator-klystron that passes through a SLED system. The SLED system multiplies the peak power by a factor 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.

18 November 2025 in arXiv
Verified
Preprint
Open access
PDF file
Frédéric Le PimpecFrédéric Le Pimpec
Frédéric Le Pimpec
CBCameron Baribeau
Cameron Baribeau
TBTonia Batten
Tonia Batten
GBGrant Bilbrough
Grant Bilbrough
BFBud Fogal
Bud Fogal
WWWard Wurtz
Ward Wurtz
In the next 5 to 10 years, new fourth generation light sources will be coming online either from upgrades or as brand new facilities. The question regarding the competitiveness and the usability of a third generation light source is certainly in the mind of the scientific personnel, which includes both the beamline and the accelerator staff of any third Gen Research Infrastructures. At the Canadian Light Source (CLS), Accelerator Operation and Development (AOD) staff are responsible for the daily operation of the machines, their upgrades which extend to long term development and shall also raise awareness on their possibilities. The boundaries of this mind experiment are 1) we must use CLS infrastructure, 2) identify the existence of the knowledge to realize an idea, 3) the realization, with whom, how, with which funds and under which administrative supervision is out of bounds.