Marton Frits

Dr. Marton Frits

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 July 2021 in Computers & Operations Research
Verified
Journal Article
Open access
MFMarton Frits
Marton Frits
BBBotond Bertok
Botond Bertok
Field service operation is a theoretically complex problem. Numerous tasks at various locations need to be assigned to service staff. Skills, capabilities, and the level of local knowledge have to be considered to estimate the time required to complete a task by a group of selected technicians. Multiple objectives involve cost, task priorities, and consumer satisfaction. The cost includes the salary of service staff for a whole route from departing to returning to the base location. The travel cost depends on the proper routing of the service staff and the effective collection of closely located tasks into a single route. Priorities of tasks are defined by a function of their deadlines. Consumer satisfaction is a function of the number of missed appointments. A two-level optimization model is introduced to solve large-scale field service operation problems. At the higher level, tasks are assigned to time intervals based on the capacity and availability of the service groups. Then at the lower level, assigned tasks are exactly scheduled and service routes planned by time-constrained process network synthesis (TCPNS). The execution of the different levels is performed iteratively until the overall work plan cannot be further improved.

13 December 2023 in Journal of Cleaner Production
Verified
Journal Article
Open access
KKKaroly Kalauz
Karoly Kalauz
MFMarton Frits
Marton Frits
BBBotond Bertok
Botond Bertok

8 February 2026 in Discover Sustainability
Verified
Journal Article
Open access
PDF file
BBBotond Bertók
Botond Bertók
DCD. J. S. Chong
D. J. S. Chong
MFMarton Frits
Marton Frits
Capacity sizing and calculating cost savings for residential households in a rapidly evolving energy market, influenced by fluctuating electricity prices and changing government incentives, is a highly complex problem. The key challenges stem from multiple interacting factors, including retail electricity prices, the desired payback period, household size, applicable electricity schemes, and the capacity factor of the photovoltaic (PV) system. The nominal power output of the solar energy system is constrained by both the specifications and the number of installed inverters and PV panels. As solar generation is intermittent and non-dispatchable, it is inherently weather-dependent and often unable to align with the dynamic fluctuations in household electricity consumption. From a financial modelling perspective, the length of the accounting period directly determines the time resolution of the model, influencing both the accuracy of cash flow estimation and investment decision-making. The proposed two-level investment planning model is based on the process network synthesis approach. At the upper level of the process model, solar generation technologies, including inverters and solar panels, are technically and economically assessed. At the lower level, which represents the load consumption side, the periodical energy balances for production, storage, demand, and purchase are considered. In order to accurately evaluate the solar energy system, the model is developed with both a monthly framework and a detailed hourly framework. The time resolution allows the model to account for grid intake, electricity sold, and storage inventory conditions over the defined periods, ultimately providing the optimal sizing for a solar system equipped with battery storage. Case studies are conducted to investigate the effects of household size, extended payback periods, varying retail electricity prices, and grid reliability. These scenarios demonstrate the key parameters that significantly influence the economic feasibility and optimal sizing of the solar energy system, which are discussed in detail in this paper.

4 February 2026 in Energies
Verified
Journal Article
Open access
PDF file
BBBotond Bertok
Botond Bertok
MFMarton Frits
Marton Frits
KKKároly Kalauz
Károly Kalauz
Petar Sabev VarbanovPetar Sabev Varbanov
Petar Sabev Varbanov
In traditional industry setups, Automated Guided Vehicles (AGVs) follow trajectories planned together with the layout of the storage or production facility and supported by fixed markers on the floor or on the walls. Traffic rules manage the avoidance of multiple vehicles, while fleet management gets movement and transportation commands completed as soon as possible. In contrast, recent developments in navigation and advanced computing, sensor, and communication capabilities make their free movement safe and manageable. Detailed route planning and scheduling can guarantee that the vehicles keep a safe distance in time and space. A recent challenge of electric AGVs is that their charging may take several hours, which must be factored into their schedule. This has made minimal energy demand a key objective alongside earliest delivery and strictly meeting the deadlines. This paper presents a method for detailed routing and scheduling of AGV fleets to minimize energy consumption while considering battery levels and charging times. The optimization method is illustrated by a case study where multiple delivery tasks are performed by synchronized movement of vehicles on a complex warehouse layout. In the optimal solution, the scheduled waiting times for collision avoidance are utilized by the vehicles to pre-charge their batteries.