Baolin Huang

Baolin Huang

Auto-generated profile, based on publicly available information

Baolin Huang


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 June 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Habib UllahHabib Ullah
Habib Ullah
HZhong Zhang
hong Zhang
BHBaolin Huang
Baolin Huang
YGYinan Gong
Yinan Gong
In this paper, we explore the integration of building information modeling (BIM) technology to assess carbon emissions, emphasizing the unique contributions to smart and sustainable approaches in prefabricated buildings and focusing on the application of digital construction strategies facilitated by BIM to evaluate carbon emissions in green prefabricated buildings, with a detailed case study on C-House at Southeast University, Nanjing, China. The research methodology involved creating a BIM model of C-House in Rhino and collecting data from the operationalization phase. This research work delves into analyzing the structural components, on-site assembling process, and evaluation of carbon emissions by using a BIM-based assessment, as well as the energy load and consumption of prefabricated components, including sustainable PV panels, to enhance building efficiency and sustainability. The findings uncover the life cycle of C-House, which spans seven stages, compared with the five stages of conventional builds. Currently in its third cycle, C-House exhibits significant reductions of 70.57% in carbon emissions during the second cycle and 43.53% in the first one. This highlights the pattern showing that the prolonged reuse of prefabricated buildings leads to decreasing emissions over time. Such results underscore the potential carbon emission reductions and environmental advantages of reusing green prefabricated buildings. Furthermore, this study provides insights into the entire life cycle of the building, from inception to occupation and post-phase performance evaluation. By employing BIM for modeling, simulation, and analysis, we offer practical insights into the application of smart technologies for sustainable construction practices, significantly contributing to the advancement of green and digital construction technologies.

7 November 2024 in Scientific Reports
Verified
Journal Article
Open access
PDF file
BHBaolin Huang
Baolin Huang
HZhong Zhang
hong Zhang
WYWensheng Yang
Wensheng Yang
HYHongyu Ye
Hongyu Ye
BJBoya Jiang
Boya Jiang
Machinery operation is a major source of carbon emissions in building deconstruction. Early intervention through Design for Deconstruction (DfD) is crucial for emission reduction, yet the factors influencing these emissions are underexplored. This study integrates parametric BIM with multi-objective optimization (MOO) to assess mechanical carbon emissions in deconstruction. Using the Octopus solver in Grasshopper for Rhino, the study analyzes independent variables—possible working hours (PWH), vertical speed (VS), and horizontal speed (HS)—and dependent variables—minimum mechanical carbon emissions (MCE (min)), minimum deconstruction period (DP (min)), and maximum working efficiency (WE (max)). A lightweight steel roof truss structure is analyzed, comparing real-world deconstruction with optimized DfD schemes. Sensitivity analysis for BIM-MOO optimized results reveal that: (1) Adjusting PWH, VS, and HS significantly affects WE and DP, though with limited impact on carbon emissions; (2) VS influences WE and DP more than HS; (3) Limiting DP is essential for balancing WE, DP, and MCE, with WE adjusted to 20–60% and modifications to PWH and VS achieving balanced management. This study underscores the importance of early design and real-time adjustments for efficient, low-emission deconstruction, supporting the advancement of green building practices.

1 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Boya JiangBoya Jiang
Boya Jiang
HHHao Huang
Hao Huang
FGFeng Ge
Feng Ge
BHBaolin Huang
Baolin Huang
Habib UllahHabib Ullah
Habib Ullah
The improper disposal of construction and demolition waste (CDW) exacerbates the consumption of raw materials and emissions of greenhouse gasses. In this study, due to the high recycling rate, focusing on the meltable materials of CDW, the recycling phase of CDW is divided into four stages, namely the on-site disposal stage, the transportation stage, the reprocessing stage, and the reproduction stage. Second, based on these four stages, a carbon emission accounting model (CEAM) is established to evaluate the carbon emission benefits of meltable materials during these stages. Third, the CEAM is applied to a typical old residential area to evaluate the carbon emission reduction benefits of the CDW recycling. The results indicate that (1) the full-process carbon emissions of recycled steel, recycled flat glass, and recycled aluminum per unit mass are 677.77 kg/t, 1041.54 kg/t, and 845.39 kg/t, respectively, which are far lower than their corresponding ordinary meltable building materials (OMBMs); (2) the carbon emissions during the reproduction stage represent the primary component of carbon emissions in the MW recycling phase, accounting for 88.52% to 97.45% of the total carbon emissions; and (3) the carbon emissions generated by the recycling of cullet per unit mass are very high, reaching 1768 kg/t, which is 4.3 times that of scrap steel (409.05 kg/t) and 3.6 times that of scrap aluminum (483.76 kg/t). The research findings could provide theoretical methods and experimental data for decision-makers to formulate treatment plans for meltable materials in CDW, thereby empowering urban carbon emission reduction and promoting sustainable development. Construction parties engaged in demolition tasks should enhance on-site sorting and collaborate with recycling companies to ensure its efficient recycling. Recycling companies need to focus on high-carbon-emission stages, such as the reproduction stage, and strengthen technological research to improve carbon reduction benefits.

16 December 2024 in Buildings
Verified
Journal Article
Open access
PDF file
WPWenjia Pan
Wenjia Pan
HZhong Zhang
hong Zhang
SHShanggang Hei
Shanggang Hei
BHBaolin Huang
Baolin Huang
RHRuiya He
Ruiya He
ZSZimu Shao
Zimu Shao
Carbon emissions from buildings account for a large proportion of total social carbon emissions. Prefabricated buildings can effectively reduce carbon emissions in the construction materialization phase. The existing building carbon emission calculation method for prefabricated buildings seems too complicated due to the large amounts of data that need to be consulted in the production, transportation, construction, and demolition phases of each building. Meanwhile, the traditional building carbon emission calculation method must be carried out after the completion of construction drawings, because the consumption of labor, materials, and machinery must be calculated according to these drawings. This paper proposes a building carbon emission calculation method for prefabricated buildings based on the component design method. A case study proved that our method can calculate carbon emissions in the materialization phase of construction more quickly than the traditional quota carbon emission calculation method, and the results of the two methods differ by less than 10%. This method significantly improves the prediction of carbon emissions in the building materialization phase.

25 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
QCQiong Chen
Qiong Chen
BHBaolin Huang
Baolin Huang
YWYanhua Wu
Yanhua Wu
HZhong Zhang
hong Zhang
Habib UllahHabib Ullah
Habib Ullah
ZCZhen Che
Zhen Che
Prefabricated buildings, characterized by factory production, on-site assembly, and efficient and refined management, enhance construction efficiency, reduce building time, and promote material reuse and recycling. The energy consumption (and carbon emissions) during the building operational stage are significantly influenced by the performance of the building envelope component system. To minimize carbon emissions throughout the building’s lifecycle, it is essential to focus on a comprehensive optimization design for carbon reduction in prefabricated envelope systems. This paper draws on grounded theory to construct a system of factors influencing carbon emissions throughout the lifecycle of prefabricated building envelopes. Using a questionnaire survey and leveraging Structural Equation Modeling (SEM), this study identifies key pathways and factors, influencing carbon emissions throughout the lifecycle of building envelope components. It provides insights into carbon emission mechanisms in these components and establishes a comprehensive design pathway for carbon control throughout the lifecycle of building envelope systems. Subsequently, the survey results were analyzed using Structural Equation Modeling (SEM) to identify key factors influencing carbon emissions throughout the lifecycle and their interrelationships. These findings were integrated into the various stages of the whole-process design, yielding actionable recommendations for carbon control in the design process. Additionally, the case study method was employed to illustrate how carbon control design and optimization techniques can be applied at each stage of a specific project, providing a practical demonstration of the research outcomes. The study offers optimized methods for carbon control across the entire process, utilizing optimization strategies to reduce carbon emissions at each stage of the building’s lifecycle.

16 January 2025 in Buildings
Verified
Journal Article
Open access
PDF file
WPWenjia Pan
Wenjia Pan
HZhong Zhang
hong Zhang
SHShanggang Hei
Shanggang Hei
YYYingjian Yang
Yingjian Yang
XXXifeng Xu
Xifeng Xu
HXHaochen Xu
Haochen Xu
Of all the construction waste, the building interior decoration and renovation waste (D&R waste) is difficult to dispose of and recycle due to its complex components and varied producers. The goal of this study is to reveal the current situation of D&R waste disposal through case studies and put forward the correlation proposal to improve standards of D&R waste recycling. This study investigated the various stages of the D&R waste management process, including generation, collection, transportation, sorting, recycling, and landfilling. Detailed studies were conducted for (i) the composition of D&R waste and (ii) the material flow analysis (MFA) of D&R waste recycling in different cases with different sorting technology. The results show that (i) concrete, stone, and other hard inorganic materials accounted for about 35–55% of the total. Soft inorganic materials such as aerated concrete and gypsum made up 5–25%, slag 15–20%, timber 5–10%, combustible matter such as plastic, rubber, and paper 9–12%, and glass and metal 1–5%, and (ii) artificial intelligence (AI) sorting offers better sorting performance and economic advantages over manual sorting, promoting the application of artificial AI sorting equipment as important solutions to face the key challenges of D&R waste recycling.