Yun Cheng

Dr. Yun Cheng

Yancheng Institute of Technology, Yancheng, Jiangsu, China
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 May 2020 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
SZSong Zhanping
Song Zhanping
YCYun Cheng
Yun Cheng
XTXiaoxu Tian
Xiaoxu Tian
JWJunbao Wang
Junbao Wang
TYTengtian Yang
Tengtian Yang

26 July 2023 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
SZSong Zhanping
Song Zhanping
YCYun Cheng
Yun Cheng
ZZZe-Kun Zhang
Ze-Kun Zhang
TYTengTian Yang
TengTian Yang

30 March 2024 in Construction and Building Materials
Verified
Journal Article
Closed access
YCYun Cheng
Yun Cheng
SZSong Zhanping
Song Zhanping
ZLZhi Liu
Zhi Liu
XTXiaoxu Tian
Xiaoxu Tian
WQWenjun Qian
Wenjun Qian
TYTengtian Yang
Tengtian Yang

23 March 2024 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
YCYun Cheng
Yun Cheng
SZSong Zhanping
Song Zhanping
ZXZhiwei Xu
Zhiwei Xu
TYTengTian Yang
TengTian Yang
XTxiaoxu tian
xiaoxu tian

30 November 2019 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
YCYun Cheng
Yun Cheng
SZSong Zhanping
Song Zhanping
JJJiefang Jin
Jiefang Jin
JWJunbao Wang
Junbao Wang
TWTong Wang
Tong Wang

7 May 2020 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
ZNZelin Niu
Zelin Niu
YCYun Cheng
Yun Cheng
ZYZhang Yuwei
Zhang Yuwei
SZSong Zhanping
Song Zhanping
GYGuiyang Yang
Guiyang Yang
HLHui Li
Hui Li
Pipe jacking technology has the advantages of fast construction speed, high economic benefit, and small impact on the urban environment, and mechanical vibration and mechanical soil interaction will lead to the settlement of upper part of pipe jacking and surrounding soil. So, the solution of soil settlement problem is of great significance for underground engineering construction. The soil loss, additional stress, and friction during the construction of rectangular pipe jacking are the main factors that cause the surface settlement. Aiming at the problem of surface settlement caused by pipe jacking in no. 6 subway in Kunming, the formation deformation caused by additional stress and friction force on excavation surface during pipe jacking process was analyzed by Mindlin’s displacement solution, and the formation deformation caused by soil loss was analyzed by random medium theory. Considering the independence of the three influencing factors, the superposition of the three types of stratum deformation was the superposition model of surface settlement, and the model was compared with the empirical method and the measured settlement data to verify its practicability and reliability. The results showed that the surface vertical settlement curve was roughly in the shape of “S,” which can be divided into uplift occurrence area, sensitive settlement area, stable settlement area, and rebound settlement area. Friction force and additional stress caused the uplift of stratum in the front of construction area, and soil loss caused the subsidence of stratum in the rear of construction area. Rectangular pipe jacking in weak stratum caused the soil to move towards the excavation surface, easily causing micro-overexcavation.