Selecting the best materials that ensure maximum performance is crucial in the construction engineering design of any construction project. However, this is challenging and usually not properly considered because of the lack of systematic and scientific evaluation methods for the performance of materials. This paper proposes a new approach of selecting material to satisfy the performance goal of material designers in building constructions based on the analytic hierarchy process method. To validate the suggested model, a case study was conducted for a concrete system form, the performance of which is susceptible to its materials and has a strong effect on overall project productivity. The newly developed form comprising polymers and alloys showed that the proposed material selection model provided a better combination of materials, and the solution was technically more advanced and ensured better performance. This paper contributes to the body of knowledge by expanding the understanding of how construction material properties affect project performance and provides a guideline for material engineers to select the best-performing building materials while considering a performance goal.
Understanding the structure and behavior of emissions in building systems is the first step toward improving the reliability of the environmental impact assessment of buildings. The shortcomings of current building lifecycle assessment (LCA) research is the lack of understanding of embodied emissions and static analysis. This study presents a methodology for the dynamic LCA of buildings, combined with the system dynamics technique. Dynamic factors related to recurrent embodied emissions are explored through a literature review. Applying the dynamic factors based on the review, a causal map and stock-flow diagram are invented. Collecting the field data and establishing the assumptions based on the literature, a case study is performed for the proposed model. As a result, through dynamic analysis, it was found that recurrent embodied emissions have a considerably different behavior from static ones during their whole life. Additionally, it was found that the environmental impacts changed by more than 10%, according to the variation of the users’ required performance level in sensitivity analysis. This result thoroughly addressed the necessity and appropriateness of dynamic LCA. The dynamic LCA model developed in this study can contribute to the long-term behavioral understanding of the embodied environmental impacts of building LCA.
The current method of estimating CO2 emissions during the construction phase does not consider the variability that can occur in actual work. Therefore, this study aims at probabilistic CO2 estimation dealing with the statistical characteristics in activity data of building construction work, focused on concrete pouring work and based on field data. The probabilistically estimated CO2 emissions have some differences from CO2 emissions measured by current deterministic methods. The results revealed that the minimum difference was 11.4%, and the maximum difference was 132.7%. This study also used Monte Carlo simulations to derive information on a probability model of CO2 emissions. Results of the analysis revealed that there is a risk of underestimating emissions because the amount of emissions was estimated at a level that exceeds the 95% confidence interval of the simulation results. In addition, the probability that CO2 emissions using the measured activities data were less than the estimated CO2 emissions using the bill of quantity was 73.2% in the probability distribution model.
Building Information Modeling (BIM) can act as a solution to improve various difficulties faced in the construction industry. BIM is expanding into infrastructure facilities for integrated information management, productivity improvement, and risk management. There are many cases where BIM is applied to buildings with horizontal and linear characteristics, but the infrastructure is different from the method of applying BIM to buildings with vertical characteristics. Using premanufactured libraries in BIM-based design can shorten the design time and simplify the design method, thus increasing the 3D design productivity. This paper develops BIM prototype libraries based on the standards from the Ministry of Land, Infrastructure, and Transport (MOLIT) of South Korea for railway infrastructure. BIM tools such as Civil 3D, Revit, and AECOsim were used by reflecting the characteristics of each facility, and the libraries, with a total of 762 types in 363 files, were constructed. The specifications were created by linking the common and facility-specific attribute items to the libraries. The result of the test modeling using the developed library showed significant productivity improvement, such as an average difference of 38.2% was observed for roadbed modeling and a mean difference of 50.2% for bridge modeling.
Recently, as “Freeform buildings” have increased in number, studies on ways to increase productivity in the construction of freeform buildings are increasing. In the case of 3D printing in construction, many studies are being conducted using the material extrusion method; among the 3D printing methods, manufacturing freeform forms using laminated object manufacturing (LOM) can overcome the limitation presented above. However, there is a lack of cases used in LOM construction sites, so it is necessary to increase the productivity of construction work and study the slicing method suitable for construction. Therefore, in this paper, we propose using study criteria and adaptive slicing methods to combine both the shape error and the manufacturing time of freeform construction. A case study was conducted to verify the results of this study; the freeform concrete form manufacturing with the algorithm that proposed this study could save 66.1% of the manufacturing time compared with CNC milling, and it needs 19.8% less manufacturing time than the existing uniform slicing method. This is a result of the production of one freeform form, and it can be expected to have a greater effect if applied to many freeform forms used in construction sites. In addition, the results of this study can be used as a decision-making tool that can determine the shape and manufacturing time of production according to the on-site situation.