Andi Hida

Dr. Andi Hida

Electrical Power Systems Department, Polytechnic University of Tirana, Tirana, Tiranë, Albania
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 May 2024 in WSEAS TRANSACTIONS ON POWER SYSTEMS
Verified
Journal Article
Closed access
AHAndi Hida
Andi Hida
LMLorenc Malka
Lorenc Malka
RBRajmonda Bualoti
Rajmonda Bualoti
High wind performance systems are influenced by many factors such as site wind resources and configuration, technical wind turbine features and many financial conditions. Scenario planning and modelling activities often focus on restricted parameters and numbers to justify wind power plant performance. To better understand possible pathways to scaling up the distributed wind market in Albania, a deep and multidimensional calculations based on Monte Carlo analysis, using RETScreen and wind JEDI model, to assess socio-economic impact as a function of turbine output power, operating and maintenance cost and many other financial inputs by testing different WT (i.e., VESTAS, GAMESA, W2E and NORDEX) with rated power from 3.45 MW up to 4.5MW applied on LCOE, NPV, SPP, equity payback, B-C, after-tax IRR on equity and effects of GHG credits extended at a sensitivity range of ±35% is scientifically performed. From the simulation results LCOE reaches a minimal value of €43.48/MWh, if the debt rate is 99 % and a debt interest rate of 5.0%, a TotCapEx of €828/MW (-35 % less expenditures) indexed as the best scenario. For the base case scenario LCOE results €62.79/MWh, when applying a debt rate of 80% and a TotCapEx of (€1274/MW), while in the worst-case scenario LCOE impart a maximal value of €87.63/MWh if a TotCapEx of €1720/MW (+35 % more expenditures) and a share of 52 % debt rate is applied. Local annual economic impact (m€) during construction period and operating period evaluated in the wind JEDI model result around m€ 89.92 and m€ 23.54, respectively. As a conclusion, wind power plants (WPP), installed in low wind zones (Albania and many other EU countries) would be of interest if an electricity export rate of 110€/MWh, and a GHG credit rate of €50/tCO2 were accepted.

1 June 2025 in Journal of Sustainable Development of Energy, Water and Environment Systems
Verified
Journal Article
Closed access
AHAndi Hida
Andi Hida
OKOlsi Karapici
Olsi Karapici
RBRajmonda Buhaljoti
Rajmonda Buhaljoti
DGDiamant Gashi
Diamant Gashi

1 January 2017 in Journal of Electrical Engineering and Information Technologies
Verified
Journal Article
Closed access
PDF file
AHAndi Hida
Andi Hida
RBRajmonda Bualoti
Rajmonda Bualoti
MÇMarialis Çelo
Marialis Çelo

1 June 2025 in Journal of Sustainable Development of Energy, Water and Environment Systems
Verified
Journal Article
Closed access
KKKlajdi Kamberi
Klajdi Kamberi
DSDonard Shaliu
Donard Shaliu
MÇMarialis Çelo
Marialis Çelo
AHAndi Hida
Andi Hida
VRViktor Rrotani
Viktor Rrotani

1 February 2025 in IET Conference Proceedings
Verified
Journal Article
Closed access
AHAndi Hida
Andi Hida
VRViktor Rrotani
Viktor Rrotani
RBRajmonda Bualoti
Rajmonda Bualoti
DSDonard Shaliu
Donard Shaliu
KKKlajdi Kamberi
Klajdi Kamberi

28 July 2022
Verified
Conference Paper
Closed access
RBRajmonda Bualoti
Rajmonda Bualoti
MÇMarialis Çelo
Marialis Çelo
EVElio Voshtina
Elio Voshtina
AHAndi Hida
Andi Hida
OKOlsi Karapici
Olsi Karapici
The connection of new hydro sources to the distribution network has had an impact on various technical parameters like losses, peak load, balance of exchanged energy, electricity production, and profile of the voltage as well as directly has affected the supply reliability. This paper is based on analytical methods, different reliability evaluation criteria, which are calculated with key parameters such as SAIFI and SAIDI as well as hosting capacity evaluation. Utilization of reliability indices at the operating district levels has allowed us to more accurately pinpoint trouble areas of the distribution network.