In a hydropower system, inflow is an uncertain stochastic process that depends on the meteorology of the reservoir’s location. To properly utilize the stored water in reservoirs, it is necessary to have a good forecast or a historical inflow record. In the absence of these two pieces of information, which is the case in Ethiopia and most African countries, the derivation of the synthetic historical inflow series with the appropriate time resolution will be a solution. This paper presents a method of developing synthetic historical inflow time series and techniques to identify the stochastic process that mimics the behavior of the time series and generates inflow scenarios. The methodology was applied to the Ethiopian power system. The time series were analyzed using statistical methods, and the stochastic process that mimics the inflow patterns in Ethiopia was identified. The Monte Carlo simulation was used to generate sample realizations of random scenarios from the identified stochastic process. Then, three cases of inflow scenarios were tested in a deterministic simulation model of the Ethiopian hydropower system and compared with the actual operation. The results show that the generated inflow scenarios give a realistic output of generation scheduling and reasonable reservoir content based on the actual operation.
This paper presents a long-term deterministic linear simulation model for the Ethiopian hydropower system, intending to utilize the water stored in the rainy season throughout the year with minimum load shedding. Two cases are simulated and compared to historical data. The base case represents current load levels, and the second case represents a load level increase. The results show that the Ethiopian hydropower system has a great deal of flexibility to be operated in a more efficient way to minimize load shedding. The results also show that the system can support a 50% load increase with minimum load shedding, mostly when the load demand exceeds the total generating capacity. The contribution of this paper is to apply a standard hydropower model for Ethiopia to estimate the potential of the Ethiopian hydropower system to avoid or minimize load shedding with improved generation and operation planning.
All long-term hydropower planning problems require a forecast of the inflow during the planning period. However, it is challenging to accurately forecast inflows for a year or more. Therefore, it is common to use stochastic models considering the uncertainties of the inflow. This paper compares deterministic and stochastic models in a weekly rolling horizon framework considering inflow uncertainty. The stochastic model is tested in both a risk-neutral and a risk-averse version. The rolling horizon framework helps make periodic decisions and update the information in each rolling week, which minimizes the errors in prolonged forecasts. The models aim to utilize the water stored in the rainy season throughout the year with minimum load shedding while storing as much water as possible at the end of the planning horizon. The Conditional Value at Risk () risk measure is used to develop the risk-averse stochastic model. Three different risk measures are investigated to choose the risk measure that yields the best outcome in the risk-averse problem, and the two best measures are compared to a deterministic and risk-neutral model in a weekly rolling horizon framework. The results show that the risk-neutral and best risk-averse models perform almost equally and are better than the deterministic model. Hence, using a stochastic model would be an improvement to the actual planning performed in the Ethiopian and other African countries’ power systems.