Keith Kong

Mr. Keith Kong

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 April 2016 in HKIE Transactions
Verified
Journal Article
Closed access
KKKeith Kong
Keith Kong
PCPhil H Cai
Phil H Cai
TTTerence K M Tang
Terence K M Tang
The paper discusses the validation of a two-dimensional finite-element Phase2 programme using various approaches to verify and compare for underground excavations in rock and jointed rock. Corresponding to the analysis of underground openings, the behaviour between circular and horseshoe-shaped underground excavation, with and without rock bolt and/or lining supports, is carried out using the numerical modelling software Phase2. The analysis of the model is compared with analytical solutions using two other numerical software packages – Plaxis and Universal Distinct Element Code (UDEC) – as well as a case study using field data recorded from one of the Hong Kong tunnel projects. As Phase2 is not a universal computer programme for solving all soil and rock engineering problems, the key assumptions and theory of the programme and its limitations are discussed. The results of the study show that the Phase2 numerical modelling programme provides satisfactory agreement with different verification cases, suggesting that the finite-element method (FEM) software is promising for simulating underground opening stability and providing a reference structural design for underground excavation in tunnel engineering.

22 March 2024 in Australian Journal of Multi-Disciplinary Engineering
Verified
Journal Article
Closed access
KKKeith Kong
Keith Kong
JKJurij Karlovsek
Jurij Karlovsek

3 July 2018 in HKIE Transactions
Verified
Journal Article
Closed access
KKKeith Kong
Keith Kong
Conventional cast in-situ concrete linings are a costly, time consuming activity and environmentally unfriendly solution for supporting hard rock excavations because concrete linings are unable to utilise the inherent strength of the rock. In evidence, by the application of confining pressure via pattern bolts suffices to improve the strength of the rockmass at the underground opening (i.e. cavern or tunnel). In the implementation of this measure, the rock arch formed by the tunnel roof and walls is considered to be a supporting arch capable of sustaining a thrust at the arch ends. However, a potential rock wedge failure, of comparatively small size, is highly probable and may occur between rock bolts. To deal with this issue, shotcrete linings will then be introduced to act as thin “protective skin” liners to support the rock surface with performance similar to a reinforced concrete slab. A detailed discussion of these combination measures, so called “shotcrete rock reinforcement” (SRR), including analysis of the strengthened rock arch and the design of shotcrete linings’ structural capacity according to Eurocodes for hard rock underground openings are presented in the paper together with numerical modelling to check against the boundary deformation of openings. Key issues of the constructability of SRR are also discussed.

24 June 2021 in Australian Journal of Civil Engineering
Verified
Journal Article
Closed access
KKKeith Kong
Keith Kong
In sewer environments, there are complex chemical and microbiological processes with a reaction between the hydrogen sulphide, a gas produced by the used water, and aerobic feeding microorganism. This resulted in production of sulphuric acid which would cause long-term corrosion on cement based concrete structures. This corrosion process is known as “Microbiologically Influenced Corrosion“. Generally, the ordinary Portland cement-based concrete is not considered as a suitable material for direct exposure to acidic sewer environments. As such, it is necessary to prevent the aggressive environments from developing, as well as to prevent the corrosive environments from coming in contact with the concrete elements. A robust corrosion protection system must be specified and provided for the tunnels and underground structures to ensure the durability of these structures under the aggressive sewer environments and able to withstand a design life span of 100 years. Case example with discussion on seven proven corrosion protection lining systems based on current technology. Past experience of the tunnels is provided with further exploratory study in terms of cost effectiveness and quantity analysis for these seven lining systems to be investigated. A technical specification for Portland cement–based Microbiologically Influenced Corrosion resistant concrete is provided.

26 November 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KKKeith Kong
Keith Kong
MRMojtaba Rajabi
Mojtaba Rajabi
JKJurij Karlovsek
Jurij Karlovsek
The Jenolan Caves are the most spectacular limestone caves in Australia. Within this cave system, the Grand Arch, which is 24 m high, 55 m wide, and 127 m long, is the largest open cave in the country. A cave of this size could potentially accommodate small city streets, buildings, and other facilities. This paper examines a stability simulation of the Grand Arch, using numerical models to deduce foundational insights into rock openings under different geological and rock mass conditions. Following this, using numerical analysis, we investigate the creation of a man-made rock opening with the same span, height, and ground conditions of the Grand Arch but formed in two different arch shapes (i.e., with and without rock reinforcement as a stabilization measure). With all stability simulations conducted in this study, a clear explanation to describe the relationship and interaction between various parameters, such as rock mass structure and quality, rock mass strength, and in situ stress field, as well as different arch roofs shapes of the rock opening, is provided. Through its comparisons between natural rock cave and man-made rock openings, this study provides some findings and deep insight, as well as further questioning on creating a large size rock-reinforced cavern in different shapes to be opened in a range of rock conditions.

2 January 2020 in Australian Journal of Civil Engineering
Verified
Journal Article
Closed access
KKKeith Kong
Keith Kong
Due to the expansion of the existing Hong Kong International Airport, known as the Three Runway System, two new 500 mm diameter, 5.2 km long aviation fuel pipelines were proposed to be built through bedrock undersea to replace the two-existing submarine aviation fuel pipelines running between the Western Quay of the Airport and the offshore Aviation Fuel Receiving Facility (AFRF) at Sha Chau. Having considered the site constraints with the expansion works for the new airport island, and minimising the disturbance of marine environments and ecology, a trenchless method using horizontal direction drilling (HDD) technique that is a cost-effective and environmental-friendly solution was adopted to complete these two aviation fuel pipelines' installation. Numerous challenges were encountered for constructing this 5.2 km long subsea pipeline using HDD method that is the longest record in the world at the time. Although the mission of the project seemed impossible, the challenge still can be defeated by incorporating technology, advanced equipment, knowledge and good practice of project planning.