With the approaching end of the productive lives of offshore oil and gas platforms, the issue about decommissioning and what to do with existing structures arises. In this regard, this study aims to test solutions, at a preliminary level, for the eco-sustainable reuse of platforms at the end of their extraction phase. In particular, mineral accretion technology is applied by low-voltage electrolysis of seawater due to the precipitation of calcium carbonate on a cathode material in order to assess the protection capacity of the platforms against corrosion. This approach allows the extension of a platform’s “life” under a more sustainable purpose. The results, derived from laboratory and field experiments, will allow us to reduce uncertainties and define the best operating conditions to increase the efficiency of the mineral accretion technology in the marine ecosystem. The data collection on the main parameters that influence the process (i.e., temperature, salinity, and applied current) and the quantitative analysis of the collected material allowed us to acquire a better knowledge about mineral composition and deposition rate.
The international energy scenario to date is heavily based on fossil energy sources such as coal, oil or natural gas. According to the international ecological goals of the UNFCCC formalized in the legally binding treaty called the Paris Agreement, the next global challenges will be the decommissioning, dismantling or reconversion of the current fossil energy system into a new, more sustainable system that makes more efficient use of renewable energy technologies. Worldwide, there are about 6500 offshore oil and gas facilities and about 130 of them are located in the Mediterranean basin, mainly in the Adriatic and Ionian Seas: more than 110 offshore gas platforms have been installed in these areas since 1960. In this paper, using Life Cycle Assessment, the environmental and economic impacts of the total removal operations of an existing offshore platform in the context of the Adriatic Sea are assessed based on existing and registered decommissioning projects. In addition, the avoided impacts of primary steel production due to its recovery and recycling from the removed platform are assessed using the system boundary expansion method.