The concept of digital twin (DT) has emerged as a trend in various industries development, enabling the creation of virtual models of physical objects. We conduct a systematic review of the DT technology in the field of transportation infrastructure management from the aspects of concept definition, whole life cycle application, advanced technology, and equipment utilization, as well as the challenges. We begin with an introduction that defines DT and its components, while also distinguishing it from building information modeling and cyber-physical systems. We explore the diverse applications of DT throughout its lifecycle and highlight the significance of DT in structural monitoring, infrastructure operation and maintenance, and dataset expansion. We further investigate the advanced techniques and equipment associated with DT components, focusing on the importance of virtual parts, data acquisition, transmission, multi-source data fusion processing, and data security as well as dynamic updating of models for effective integration and utilization of DT in transportation infrastructure management. We identify key challenges faced by DT in transportation infrastructure management and propose future trends in the study. This comprehensive review serves as a valuable resource for researchers, practitioners, and decision-makers in understanding the potential of DT technology in transportation infrastructure management.
1 January 2016 in Discrete Dynamics in Nature and Society
It is a multiobjective mixed integer programming problem that calculates the carrying capacity of high speed railway based on mathematical programming method. The model is complex and difficult to solve, and it is difficult to comprehensively consider the various influencing factors on the train operation. The multiagent theory is employed to calculate high speed railway carrying capacity. In accordance with real operations of high speed railway, a three‐layer agent model is developed to simulate the operating process of high speed railway. In the proposed model, railway network agent, line agent, station agent, and train agent are designed, respectively. To validate the proposed model, a case study is performed for Beijing–Shanghai high speed railway by using NetLogo software. The results are consistent with the actual data, which implies that the proposed multiagent method is feasible to calculate the carrying capacity of high speed railway.
The research on risk control during the construction stage of catenary is relatively limited. Based on a comprehensive analysis of the risk factors during catenary construction, this study determined the causal relationships between the risk factors and established a risk assessment model for catenary construction that analyzed the risks from a causal logic perspective. During the evaluation process, we identified six exogenous variables and twenty-one endogenous variables for risk factors in the construction of catenary based on a literature review in the field of catenary construction and expert opinions, described the cause-and-effect relationships between variables using structural equations and causal diagrams, and established a multi-level catenary construction risks structural causal model. Based on expert fuzzy evaluation and expert experience, the occurrence probability of exogenous variables and the conditional probability of endogenous variables were determined, respectively. Then, the risk assessment model of catenary construction stage based on fuzzy Bayesian Network was constructed to analyze the risk of catenary construction process. The results showed that the personal quality of the construction personnel and the sense of responsibility of the supervision unit had a great impact on the risk level of catenary construction. The findings can help construction personnel fully consider various weak points in catenary construction, thereby ensuring efficient and high-quality catenary construction.
The geological complexity, environmental sensitivity, and ecological fragility inherent in complex and difficult areas (CDAs) present new opportunities and challenges for technological innovation in railway engineering development in China. At the current stage in China, the process of technological innovation in railway engineering within CDAs still faces a series of pressing issues that need addressing. The paper identifies and determines 22 influencing factors for technological innovation in railway engineering within CDAs across five dimensions. Subsequently, a technological innovation model for railway engineering in such areas is constructed based on system dynamics (SD), which is followed by simulation and sensitivity analysis to identify the key influencing factors. The results indicate that key influencing factors for technological innovation in railway engineering within CDAs include technological innovation capability, the adaptability of technology to the environment, R&D funding investment, technological product requirements, technological innovation incentive mechanisms, and the level of technological development. The importance ranking of each dimension is as follows: technological factors > technical factors > management factors > resource factors > environmental factors. The paper provides new insights for promoting technological innovation and management development in complex and challenging railway engineering projects. It offers a fresh perspective to enhance the technological innovation efficiency of railway projects in complex and challenging areas.
Extreme climatic conditions and active geological factors posed challenges in evaluating disaster risk trends in railway construction projects and identifying key influencing factors. Traditional technology is difficult to adapt to the exploration and unknown construction process of railway engineering in complex and difficult areas. Therefore, there is an urgent need for technological innovation. The study used the Vague set theory method to screen and determine a list of risk factors for railway engineering technology innovation in complex areas, including 5 primary risk indicators and 26 secondary risk indicators. Based on this, an evaluation system for risk factors of railway engineering technology innovation in complex areas was established. Secondly, this study combined the Analytic Hierarchy Process (AHP) and Entropy Weight Method (EWM) with a cloud model to comprehensively evaluate risks and create cloud maps. Based on the calculation results, the risk level of railway engineering technology innovation risk factors in complex areas is obtained as environmental factors > technological factors > social factors > management factors > resource factors. The “combination weighting-cloud model” framework adopted in this study effectively overcomes the problem of insufficient representation of traditional single weighting method by integrating subjective and objective weight optimization and dynamic risk coupling analysis and significantly improves the multidimensional adaptability and dynamic evaluation accuracy.