Huimin Li

Dr. Huimin Li


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
QCQing Chai
Qing Chai
HLHuimin Li
Huimin Li
Wei TianWei Tian
Wei Tian
Yang ZhangYang Zhang
Yang Zhang
The regeneration of abandoned industrial buildings (RAIBs) has received extensive attention in urban renewal efforts to achieve urban sustainable development goals. Meanwhile, the construction safety performance of RAIBs is a major challenge with increasing RAIB projects in China. Safety programs have been considered as one of the proactive methods to effectively reduce accidents and injuries in the construction industry. Various studies have conducted critical success factors (CSFs) that influence the effective implementation of safety programs in new buildings. However, the CSFs affecting the construction safety program implementation of RAIBs were ignored. The aim of this study is to determine CSFs that affect the safety program implementation of RAIB projects. First, sixteen factors were identified combining characteristics of RAIBs with literature reviews and experts’ opinion. Second, the fuzzy set theory and decision-making trial and evaluation laboratory (DEMATEL) approach are proposed to identify the influencing degree of the factors and categorize these factors into cause-and-effect groups. Then, according to the causal diagram, management support (C1), allocation of authority and responsibility (C3), control of subcontractor (C5), personal attitude (C9), and safety inspections and hazard assessment (C14) are identified as the CSFs for the safety program implementation of RAIBs’ construction. This study guides the managers and stakeholders to especially concentrate on these CSFs in order to improve the efficiency of the safety program implementation of RAIB projects with limited resources. This study also will contribute to the improvement of safety performance and to the sustainable development goal of RAIB projects.

19 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Guangmin ZhangGuangmin Zhang
Guangmin Zhang
Yang ZhangYang Zhang
Yang Zhang
Wei TianWei Tian
Wei Tian
HLHuimin Li
Huimin Li
Ping GuoPing Guo
Ping Guo
Fangfang YeFangfang Ye
Fangfang Ye
Green redevelopment (GR) is a promising strategy to deal with industrial brownfields, this sustainable initiation usually fails to be implemented practically in China. Thus, investigating the driving mechanism of developer’s GR behavior, as executors of renovation project, is quite essential. The study introduced formative constructs perceived risk (PR) and perceived cost (PC), integrated them with theory of planned behavior (TPB), and extended them by adding two altruistic motives, awareness of responsibility (AR) and awareness of consequence (AC), as moderation variables to explore the bridging role of altruistic motives in GR’s intention–behavior gap. Based on 156 developers-oriented field surveys, the study conducted data analysis through partial least square structural equation modeling. It interestingly showed that subjective norm could primarily affect developers’ GR behavior, while perceived behavior control is not a significant influencing factor. Meanwhile, adding PR and PC as the additional constructs significantly increased the explanatory power of standard TPB model. Furthermore, the conclusion confirmed altruistic motives AR can distinctly adjust the relationship between GR intention and behavior, whereas AC has no such effect. These findings provide a scientific theoretical basis and a targeted path reference for promoting GR of industrial brownfields.

2 December 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
Ping GuoPing Guo
Ping Guo
HLHuimin Li
Huimin Li
GZGuangmin Zhang
Guangmin Zhang
Yang ZhangYang Zhang
Yang Zhang
With the rapid development of the transformation and urbanization of Chinese social structures, more and more industrial heritage renewal projects are emerging. However, there are significant policy risks associated with Chinese industrial heritage renewal projects. Through a literature review, a total of 20 policy risk factors were determined, and a total of 10 industrial heritage renewal project managers in six regions nationwide conducted a pilot study. A questionnaire survey was conducted to collect 398 evaluations of these 20 risk factors from relevant professionals. Secondly, through confirmatory factor analysis, a six-part policy risk assessment model was established. The results indicated that the critical variables that affect the policy risk level were: (1) industry maturity, (2) tax policy, (3) financial freedom, (4) the rule of law, (5) local market size, and (6) local market experience. Moreover, there are significant opportunities and policy risks in Chinese industrial heritage renewal projects, and appropriate strategies can capture these opportunities and mitigate risks. As there are few pieces of research on the policy risks of industrial heritage renewal projects in China, this study has a certain reference significance for the policy risk management of industrial heritage renewal projects in China.