Majid Parchamijalal

Majid Parchamijalal


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
AMAli Mirzaei
Ali Mirzaei
FNFarnad Nasirzadeh
Farnad Nasirzadeh
MPMajid Parchamijalal
Majid Parchamijalal
YZYasin Zamani
Yasin Zamani
Workspace in construction projects is considered a resource and a constraint that needs to be addressed in project scheduling. Without proper workspace planning, time–space conflicts frequently may occur at construction sites. In this study, a novel four-dimensional building information modeling (4D-BIM) dynamic conflict detection and quantification system was developed to identify time–space conflicts and quantify their impacts on project performance. Using the proposed approach, the conflict between different activities workspaces was identified considering the labor crew movement in the assigned workspace during different time intervals. For this purpose, four distinct execution patterns were defined, which in combination with four starting positions, led to 16 execution alternatives. The conflict’s severity was then calculated through the quantitative assessment of its effects on labor productivity. To evaluate the performance of the proposed approach, it was implemented on a building project. The time–space conflicts were detected and quantified using the proposed approach. Finally, a what-if analysis was performed to select the optimum execution scenario with the minimum number of time–space conflicts. Using the proposed approach, conflict detection can be performed more accurately, and a more precise value for conflict severity is achieved.

17 July 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
MPMajid Parchamijalal
Majid Parchamijalal
SSShahab Shoar
Shahab Shoar
Purpose: The purpose of this paper is to develop a model for complex interconnected structure of various factors interacting with delay in order to identify the most important factors influencing and influenced by delay based on their interrelations. Design/methodology/approach: Reviewing literature and interviewing with local experts selected from the Iranian construction industry, top 58 delay factors were identified and categorized into six major groups. The interrelations among these factors were, then, modeled using the system dynamics (SD) approach. The resulting causal loop diagrams obtained from SD were used subsequently for identifying the most significant factors influencing and influenced by delay through the Decision Making Trial and Evaluation Laboratory (DEMATEL) method. The impact of factors on each other was finally determined based on the opinions of 63 experts selected from the Iranian community of consultants, contractors, and clients. Findings: According to the analysis, eight out of the 58 factors were identified as the most influencing factors on delay, and nine factors were found to be the most influenced factors by delay in the field of delay analysis. The study also concluded that factors related to labors are the most important and influential factors. In addition, factors related to client were the most influencing factors and external-related factors were the least important ones. At the end, some recommendations to reduce variation of delay in the construction projects are presented as well. Originality/value: Considering the interconnected structure of the factors, the paper identifies the most important factors interacting with time delay in construction projects.

14 August 2023 in Buildings
Verified
Journal Article
Open access
PDF file
HNHossein Naderi
Hossein Naderi
MHMohammadHossein Heydari
MohammadHossein Heydari
MPMajid Parchamijalal
Majid Parchamijalal
Building energy performance contracts have emerged as a highly effective strategy for reducing energy consumption in both developed and developing markets. These projects inherently involve risks, and a comprehensive risk analysis can greatly enhance their successful implementation, especially in emerging markets. This research aims to analyze risks associated with building energy performance projects, considering their interrelationships, prioritization, and the ranking of optimal project types based on the analyzed risks. Given its position as the largest electrical energy consumer in the Middle East and its status as an emerging market, Iran was selected as the case study for conducting the risk analysis. Thirteen risk factors were classified into four distinct risk groups, and their relationships and priority weights were determined using a hybrid DANP approach. Subsequently, the VIKOR method was employed to rank the most-advantageous project types based on their risk priorities. The findings of this research identified project lifecycle risks as the highest-priority risks, while external risks were determined to be the most-influential among all identified risks. Moreover, the implementation of packaged public projects was identified as the most-favorable alternative for promoting building energy performance projects in Iran and similar emerging markets. By providing a comprehensive understanding of risks, this study offers valuable insights that can aid emerging and developing markets in successfully implementing energy performance projects and improving overall energy efficiency.