Seungho Kim

Dr. Seungho Kim


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 May 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSeungho Kim
Seungho Kim
SKSangyong Kim
Sangyong Kim
Dong-Eun LeeDong-Eun Lee
Dong-Eun Lee
Compared to the past, the complexity of construction-project progress has increased as the size of structures has become larger and taller. This has resulted in many unexpected problems with an increasing frequency of occurrence, such as various uncertainties and risk factors. Recently, research was conducted to solve the problem via integration with data-collection automation tools of construction-project-progress measurement. Most of the methods used spatial sensing technology. Thus, this study performed a review of the representative technologies applied to construction-project-progress data collection and identified the unique characteristics of each technology. The basic principle of the progress proposed in this study is its execution through the point cloud and the attributes of BIM, which were studied in five stages: (1) Acquisition of construction completion data using a point cloud, (2) production of a completed 3D model, (3) interworking of an as-planned BIM model and as-built model, (4) construction progress tracking via overlap of two 3D models, and (5) verification by comparison with actual data. This has confirmed that the technical limitations of the construction progress tracking through the point cloud do not exist, and that a fairly high degree of progress data which contains efficiency and accuracy can be collected.

4 May 2020 in Remote Sensing
Verified
Journal Article
Open access
PDF file
SKSeungho Kim
Seungho Kim
SKSangyong Kim
Sangyong Kim
Dong-Eun LeeDong-Eun Lee
Dong-Eun Lee
Progress management of a construction project can detect changes early by visualizing the progress of the project, as it is important to be capable of predicting the success or failure of future project objectives. However, to perform reliable progress management tasks, accurate measurement data is required. In this study, the basic principle of the evaluation of project progress was performed through the 3D point cloud and the 4D attributes of BIM. The evaluation of project progress proposed in this study was based on as-built data to assess the progress of the project site. The specific improvements via the proposed process for this study in the construction project-progress control area were as follows: (1) visualization of construction project progress, (2) calculation of project as-built quantity, and (3) evaluation of a project’s progress. This study improved the efficiency and productivity in the management of a construction project through detection of the progress process. It provided easy monitoring of the overall project status, such as productivity analysis, progress rate and quality verifications, and easy identification of the problems created and foreseeable engineering tasks.

23 April 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSeungho Kim
Seungho Kim
Dong-Eun LeeDong-Eun Lee
Dong-Eun Lee
YKYonggu Kim
Yonggu Kim
SKSangyong Kim
Sangyong Kim
The construction of most apartment underground parking lots utilizes reinforced concrete (RC) structures composed mainly of rebar work and formwork. RC structures lower construction efficiency and significantly delay the construction because they require a large number of temporary materials and wooden formwork. In this study, a precast concrete double wall (PCDW) system was developed to address the existing problems of RC structures and to improve the productivity of retaining wall construction. PCDW is a precast concrete (PC) wall in which two thin concrete panels are connected parallel to each other with truss-shaped reinforcement between them. PCDW can contribute to securing integrity, reducing the delay in construction, and improving quality. An overall process for the member design and construction stage of the PCDW system was proposed, and its improvement effects were examined regarding various aspects in comparison to the RC method.

21 May 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSu hyun Kang
Su hyun Kang
SKSangyong Kim
Sangyong Kim
SKSeungho Kim
Seungho Kim
Dong-Eun LeeDong-Eun Lee
Dong-Eun Lee
As the number of aged infrastructures increases every year, a systematic and effective asset management strategy is required. One of the most common analysis methods for preparing an asset management strategy is life cycle cost analysis (LCCA). Most LCCA-related studies have focused on traffic and energy; however, few studies have focused on school buildings. Therefore, an approach should be developed to increase the investment efficiency for the performance improvement of school buildings. Planning and securing budgets for the performance improvement of school building is a complex task that involves various factors, such as current conditions, deterioration behavior and maintenance effect. Therefore, this study proposes a system dynamics (SD) model for the performance improvement of school buildings by using the SD method. In this study, an SD model is used to support efficient decision-making through policy effect analysis, from a macro-perspective, for the performance improvement of school buildings.

22 June 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSu hyun Kang
Su hyun Kang
SKSeungho Kim
Seungho Kim
Dong-Eun LeeDong-Eun Lee
Dong-Eun Lee
SKSangyong Kim
Sangyong Kim
The noise between the floors in apartment buildings is becoming a social problem, and the number of disputes related to it are increasing every year. However, laypersons will find it difficult to use the sound level meters because they are expensive, delicate, bulky, etc. Therefore, this study proposes a system to monitor the noise between the floors, that will measure the sound and estimate the location of the noise using the sensors and applications in smartphones. To evaluate how this system can be used effectively within an apartment building, a case study has been performed to verify its validity. The result shows that the mean absolute error (MAE) between the actual noise generating position and the estimated noise source location was measured at 2.8 m, with a minimum error of 1.2 m and a maximum error of 4.3 m. This means that smartphones, in the future, can be used as low-cost monitoring and evaluation devices to measure the noise between the floors in apartment buildings.