Under special circumstances, a cable-driven parallel robot (CDPR) may leave its wrench-feasible-workspace. Standard approaches for the computation of set-point cable forces are likely to fail in this case. The novel nearest corner method for calculating appropriate cable forces when the CDPR is outside of its wrench-feasible-workspace was introduced in former work of the authors. The obtained cable force distributions aim at continuity and generate wrenches close to the desired values. The method employs geometrical operations in the cable force space and promises real-time usability because of its non-iterative structure. In a simplified simulation, a cable break scenario was used to carry out more detailed testing of the method regarding different parameters, a higher number of cables, and the numerical efficiency. A brief discussion about the continuity of the method when entering the wrench-feasible-workspace is presented.
Cable failure is an extremely critical situation in the operation of cable-driven parallel robots (CDPR), as the robot might be instantly outside of its predefined workspace. Therefore, the calculation of a cable force distribution might fail and, thus, the controller might not be able to master the guidance of the system anymore. However, as long as there is a remaining set of cables, the dynamic behavior of the system can be influenced to prevent further damage, such as collisions with the ground. The paper presents a feasible algorithm, introduces the models for dynamical multi-body simulation and verifies the algorithm within control loop closure.
This paper outlines an important step in characterizing a novel field of robotic construction research where a cable-driven parallel robot is used to extrude cementitious material in three-dimensional space, and thus offering a comprehensive new approach to computational design and construction, and to robotic fabrication at larger scales. Developed by the Faculty of Art and Design at Bauhaus-University Weimar (Germany), the faculty of Architecture at the University of Applied Sciences Dortmund (Germany) and the Chair of Mechatronics at the University of Duisburg-Essen (Germany), this approach offers unique advantages over existing additive manufacturing methods: the system is easily transportable and scalable, it does not require additional formwork or scaffolding, and it offers digital integration and informational oversight across the entire design and building process. This paper considers 1) key research components of cable robotic 3D-printing (such as computational design, material exploration, and robotic control), and 2) the integration of these parameters into a unified design and building process. The demonstration of the approach at full-scale is of particular concern.