Anis Chelbi

Dr. Anis Chelbi

orcid

Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2018 in International Journal of Production Research
Verified
Journal Article
Closed access
NBNadia Bahria
Nadia Bahria
ACAnis Chelbi
Anis Chelbi
HBHanen Bouchriha
Hanen Bouchriha
IDImen Harbaoui Dridi
Imen Harbaoui Dridi
The objective of this paper is to develop an integrated approach for the joint control of production, maintenance and quality for batch manufacturing systems. We consider such systems that are subject to degradation which is at the origin of the production of defective units. The quality control of lots produced is performed using an ‘x-bar’ control chart. This graphical tool will allow estimating the quality of the batch being produced and possibly undertake perfect preventive or corrective maintenance actions on the production system. A buffer stock is built to maintain continuity of supply during maintenance actions. The incurred total cost includes setup cost, inventory costs, the cost of unused products, maintenance costs and quality costs. Decision variables include the buffer stock size, the sample size, the sampling interval, the surveillance and the control limits of the control chart. Numerical experiments and sensitivity analyses are provided to evaluate the effectiveness of the proposed control policy and the robustness of the solving approach.

22 May 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
ABAmir Baklouti
Amir Baklouti
LMLahcen Mifdal
Lahcen Mifdal
DSDellagi Sofiene
Dellagi Sofiene
ACAnis Chelbi
Anis Chelbi
In this paper, we develop a preventive maintenance (PM) strategy for a solar photovoltaic system composed of solar panels functioning as a series system. The photovoltaic system is considered in a failed state whenever its efficiency drops below a predefined threshold or any electrical wiring element is damaged. In such a situation of failure, a minimal repair is performed. The proposed PM strategy suggests systematically replacing n panels with their respective wiring system every time units T over a finite operating time span H. The panels to be preventively replaced are selected by the maintenance agent after an on-site overall assessment of all panels, making sure every time not to replace panels previously replaced during a given replacement cycle of all panels of the system. An analytical model is proposed in order to simultaneously determine the optimal PM period, T, and the optimal number of solar panels, n, to be replaced at each PM. This is done by modeling and minimizing the expected total maintenance cost over the finite operating time horizon H. A numerical example is presented to illustrate the use of the proposed modelling approach and to discuss the obtained results. The latter provide the optimal solutions (T*, n*) for different combinations of input parameters. They also show the economic relevance of the proposed PM strategy through estimation of the economic gain when comparing the situations with and without preventive maintenance.

10 August 2015 in International Journal of Production Research
Verified
Journal Article
Closed access
AMA. Ben Mabrouk
A. Ben Mabrouk
ACAnis Chelbi
Anis Chelbi
MRM. Radhoui
M. Radhoui
In this paper, we consider randomly failing equipment leased several times during their life cycle with a given warranty period. A mathematical model is developed to determine the optimal efficiency levels of preventive maintenance (PM) to be performed on the equipment between successive lease periods, maximising the expected total profit of the lessor over the equipment life cycle. The model considers the expected leasing revenue as well as the equipment acquisition cost and the average PM and repair costs. PM actions allow reducing the age of the equipment to a certain extent with a corresponding cost depending on the PM level adopted. The efficiency of the PM is determinant of the expected revenue during the next lease period. Given a set of K possible PM levels and the number of lease periods n over the equipment life cycle, Kn−1 PM strategies are possible. A genetic algorithm is proposed in order to obtain nearly optimal policies in situations where the number of possibilities Kn−1 is very high. Obtained numerical results are discussed. Small- and big-size instances of the problem are considered in the case of a service company in the oil and gas industry specialised in leasing specific equipment such as separators, to oil companies for production activities with a limited duration of several months like well testing or short production tests.

17 October 2016 in International Journal of Production Research
Verified
Journal Article
Closed access
MDMohamed Noomane Darghouth
Mohamed Noomane Darghouth
ACAnis Chelbi
Anis Chelbi
DADaoud Ait-Kadi
Daoud Ait-Kadi
A cost model for optimal reliability improvement of warranted second-hand production equipment is developed. The second-hand production equipment of age x is subjected to an upgrade action of a certain level u before it is sold with a Free Repair Warranty. We look at determining the optimal upgrade level when not performing and when performing periodic preventive maintenance (PM) during the warranty period. Two different PM strategies are considered: (a) periodic PM actions having the same efficiency level; (b) periodic multi-phase PM actions with a maintenance efficiency level which varies according to the phase. The proposed model aims at helping the dealer to find the optimal upgrade level to perform before selling the second-hand equipment, and to assess whether performing PM actions during the warranty period, according to a specific maintenance strategy, is worthwhile in terms of cost reduction. Numerical experimentations considering each PM scenario are performed in order to investigate how each PM strategy impacts the improvement level to be performed and the associated total expected cost. The obtained results showed that the expected total cost incurred by the dealer is governed by a sensitive trade-off between the warranty servicing cost and the costs associated with the reliability improvement, and with the PM performed during the warranty period. It is also found that the proposed new periodic multi-phase PM policy with an increasing maintenance efficiency level yields lower upgrade levels, inducing lower costs for the dealer.

1 February 2018 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
SJS. Jbili
S. Jbili
ACAnis Chelbi
Anis Chelbi
MRM. Radhoui
M. Radhoui
MKM. Kessentini
M. Kessentini

27 November 2008 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
MRMehdi Radhoui
Mehdi Radhoui
NRNidhal Rezg
Nidhal Rezg
ACAnis Chelbi
Anis Chelbi