Osama Moselhi

Dr. Osama Moselhi


Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 April 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
OMOsama Moselhi
Osama Moselhi
HBHassan Bardareh
Hassan Bardareh
Zhenhua ZhuZhenhua Zhu
Zhenhua Zhu
Near real-time tracking of construction operations and timely progress reporting are essential for effective management of construction projects. This does not only mitigate potential negative impact of schedule delays and cost overruns but also helps to improve safety on site. Such timely tracking circumvents the drawbacks of conventional methods for data acquisition, which are manual, labor-intensive, and not reliable enough for various construction purposes. To address these issues, a wide range of automated site data acquisition, including remote sensing (RS) technologies, has been introduced. This review article describes the capabilities and limitations of various scenarios employing RS enabling technologies for localization, with a focus on multi-sensor data fusion models. In particular, we have considered integration of real-time location systems (RTLSs) including GPS and UWB with other sensing technologies such as RFID, WSN, and digital imaging for their use in construction. This integrated use of technologies, along with information models (e.g., BIM models) is expected to enhance the efficiency of automated site data acquisition. It is also hoped that this review will prompt researchers to investigate fusion-based data capturing and processing.

1 April 2010 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
ZKZafar Khan
Zafar Khan
Tarek ZayedTarek Zayed
Tarek Zayed
OMOsama Moselhi
Osama Moselhi
The need of immediate supportive measures for sustainability of municipal infrastructures calls for better understanding of the behavior of various infrastructure network systems and their components. This paper presents a study which uses artificial neural networks to investigate the importance and influence of certain characteristics of sewer pipes upon their structural performance, expressed in terms of condition rating. In this study, back propagation and probabilistic neural network (NN) models were developed and validated. The data used in the development of these models were provided by the municipality of Pierrefonds, Quebec. It comprised of parameters related to sewer pipelines, pipe diameter, buried depth/cover, bedding material, pipe material, pipeline length, age, and closed circuit television (CCTV) based structural condition rating. The first six parameters are the independent variables of the models whereas CCTV based condition rating for these pipes is the dependent variable (i.e., the out...

1 May 2013 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MAMohammad Ammar
Mohammad Ammar
Tarek ZayedTarek Zayed
Tarek Zayed
OMOsama Moselhi
Osama Moselhi
Decision support models are needed to facilitate long-term planning and priority setting among competing alternatives. Life-cycle cost is the most frequently used economic model that considers all cost elements and related factors throughout the service life of the alternatives being considered. These cost elements and related factors are usually associated with uncertainty and subjectivity. As such, it is important to model the uncertainty arising from the assumed data over the service life of competing alternatives. Probabilistic techniques, such as Monte Carlo simulation, are commonly used to deal with such uncertainty or vagueness. However, they have been criticized for their complexity and amount of data required. This paper presents a fuzzy-based life-cycle cost model that accounts for uncertainty in a manner that disadvantages commonly encountered in probabilistic models are alleviated. The developed model utilized fuzzy set theory and interval mathematics to model vague, imprecise, qualita...

1 June 2010 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
MFMohamed Fahmy
Mohamed Fahmy
OMOsama Moselhi
Osama Moselhi
Leakage of water distribution networks is the most common reason of undesirable losses of potable water. Problems associated with water main leaks pose growing concern around the globe. These problems include water and energy loss, in addition to the risk it poses to structural damage of adjacent properties. In current practice, not all water leaks can be detected in a timely and cost effective manner. This paper presents a study conducted for detection of water leaks in underground pipelines, and identification of their respective locations using thermography infrared camera. The paper describes the field work and the experimental protocol which were carried out over 2 years in three different locations in greater Montréal (Canada) area in order to investigate factors that affect the applicability and limitations of using IR camera in water leak detection. These factors beyond those studied in previous work carried out by American Water Works Association and National Research Council. The paper presents ...

1 October 2009 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
OMOsama Moselhi
Osama Moselhi
AAAdel Alshibani
Adel Alshibani
Large scale earthmoving operations require the use of heavy and costly construction equipment. Optimum utilization of equipment is a crucial task for the project management team. It can result in substantial savings in both time and cost of earthmoving operations. This paper presents optimization model for earthmoving operations in heavy civil engineering projects. The developed model is designed to assist general contractor in optimizing planning of earthmoving operations. The model utilizes genetic algorithm, linear programming, and geographic information systems to support its management functions. The model assists in planning earthmoving operations; taking into consideration: (1) availability of resources to contractors; (2) project budget and/or time constraints, if any; (3) scope of work; (4) construction site conditions; (5) soil type; (6) project indirect cost; and (7) equipment characteristics. The model also determines the quantities of earth to be moved from different borrow pits and those to ...

10 May 2019 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
TSTarek Salama
Tarek Salama
OMOsama Moselhi
Osama Moselhi
Purpose: The purpose of this paper is to present a newly developed multi-objective optimization method for the time, cost and work interruptions for repetitive scheduling while considering uncertainties associated with different input parameters. Design/methodology/approach: The design of the developed method is based on integrating six modules: uncertainty and defuzzification module using fuzzy set theory, schedule calculations module using the integration of linear scheduling method (LSM) and critical chain project management (CCPM), cost calculations module that considers direct and indirect costs, delay penalty, and work interruptions cost, multi-objective optimization module using Evolver © 7.5.2 as a genetic algorithm (GA) software, module for identifying multiple critical sequences and schedule buffers, and reporting module. Findings: For duration optimization that utilizes fuzzy inputs without interruptions or adding buffers, duration and cost generated by the developed method are found to be 90 and 99 percent of those reported in the literature, respectively. For cost optimization that utilizes fuzzy inputs without interruptions, project duration generated by the developed method is found to be 93 percent of that reported in the literature after adding buffers. The developed method accelerates the generation of optimum schedules. Originality/value: Unlike methods reported in the literature, the proposed method is the first multi-objective optimization method that integrates LSM and the CCPM. This method considers uncertainties of productivity rates, quantities and availability of resources while utilizing multi-objective GA function to minimize project duration, cost and work interruptions simultaneously. Schedule buffers are assigned whether optimized schedule allows for interruptions or not. This method considers delay and work interruption penalties, and bonus payments.