Jie Yang

Prof. Jie Yang

Institute of Water Resources and Hydro-electric Engineering, Xi’an University of Technology, Xi’an 710048, China
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 April 2015 in International Journal of Machine Learning and Cybernetics
Verified
Journal Article
Closed access
PDF file
MJMa Jing
Ma Jing
Jie YangJie Yang
Jie Yang
LSLi Shou-Yi
Li Shou-Yi
WLWang Lu
Wang Lu


23 August 2021 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
FTFei Tong
Fei Tong
Jie YangJie Yang
Jie Yang
MCMA Chunhui
MA Chunhui
Lin ChengLin Cheng
Lin Cheng
GLGaochao Li
Gaochao Li

11 March 2023 in Water
Verified
Journal Article
Open access
PDF file
Chunhui MAChunhui MA
Chunhui MA
XXXiaoyan Xu
Xiaoyan Xu
Jie YangJie Yang
Jie Yang
Lin ChengLin Cheng
Lin Cheng
Water conservancy projects have the functions of flood control, power generation, water supply, and irrigation, and play a vital role in the survival and development of human society

12 October 2022 in Water
Verified
Journal Article
Open access
PDF file
Lin ChengLin Cheng
Lin Cheng
Chunhui MAChunhui MA
Chunhui MA
XYXina Yuan
Xina Yuan
Jie YangJie Yang
Jie Yang
LHLiangcai Hu
Liangcai Hu
DZDongjian Zheng
Dongjian Zheng
The system identification of concrete dams using seismic monitoring data can reveal the practical dynamic properties of structures during earthquakes and provide valuable information for the analysis of structural seismic response, finite element model calibration, and the assessment of postearthquake structural damage. In this investigation, seismic monitoring data of the Pacoima arch dam were used to identify the structural modal parameters. The identified modal parameters of the Pacoima arch dam, derived in different previous studies that used forced vibration tests (FVT), numerical calculation, and seismic monitoring, were compared. Meanwhile, different modal identification results using the input-output (IO) methods and the output-only (OO) identification methods as well as the linear time-varying (LTV) modal identification method were adopted to compare the modal identification results. Taking into account the different excitation, seismic input, and modal identification methods, the reasons for the differences among these identification results were analyzed, and some existing problems in the current modal identification of concrete dams are pointed out. These analysis results provide valuable guidance regarding the selection of appropriate identification methods and the evaluation of the system identification results for practical engineering applications.

23 March 2020 in Engineering Computations
Verified
Journal Article
Closed access
Chunhui MAChunhui MA
Chunhui MA
Jie YangJie Yang
Jie Yang
LCLin Cheng
Lin Cheng
LRLi Ran
Li Ran
To improve the efficiency, accuracy and adaptivity of the parameter inversion analysis method of a rockfill dam, this study aims to establish an adaptive model based on a harmony search algorithm (HS) and a mixed multi-output relevance vector machine (MMRVM). By introducing the mixed kernel function, the MMRVM can accurately simulate the nonlinear relationship between the material parameters and dam settlement. Therefore, the finite element method with time consumption can be replaced by the MMRVM. Because of its excellent global search capability, the HS is used to optimize the kernel parameters of the MMRVM and the material parameters of a rockfill dam. Because the parameters of the HS and the variation range of the MMRVM parameters are relatively fixed, the HS-MMRVM can imbue the inversion analysis with adaptivity; the number of observation points required and the robustness of the HS-MMRVM are analyzed. An application example involving a concrete-faced rockfill dam shows that the HS-MMRVM exhibits high accuracy and high speed in the parameter inversion analysis of static and creep constitutive models. The applicability of the HS-MMRVM in hydraulic engineering is proved in this paper, which should further validate in inversion problems of other fields. An adaptive inversion analysis model is established to avoid the parameters of traditional methods that need to be set by humans, which strongly affect the inversion analysis results. By introducing the mixed kernel function, the MMRVM can accurately simulate the nonlinear relationship between the material parameters and dam settlement. To reduce the data dimensions and verify the model’s robustness, the number of observation points required for inversion analysis and the acceptable degree of noise are determined. The confidence interval is built to monitor dam settlement and provide the foundation for dam monitoring and reservoir operation management.