Wei Zhou

Mr. Wei Zhou


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 December 2020 in IEEE Access
Verified
Journal Article
Open access
Lichao NieLichao Nie
Lichao Nie
WZWei Zhou
Wei Zhou
XXXinji Xu
Xinji Xu
KWKai Wang
Kai Wang
LCLEI CHEN
LEI CHEN
YLYao Li
Yao Li
Although performing tunnel excavation using tunnel boring machines (TBMs) is rapid, it is susceptible to the unexpected geological changes located in front of the tunnel face. Seismic detection methods are useful to detect local geological conditions in front of the tunnel face. However, manual detection is time consuming and may interfere in realizing rapid excavation by TBMs. Therefore, this study proposes an automated seismic detection system that is mounted on a TBM for rapidly imaging anomalous zones in front of the tunnel face. The system consists of an automated data acquisition system and a data processing system. The automated data acquisition system allows reducing the data acquisition time. To reduce the data processing time, the data processing system images the anomalous zones based on a modified Coppens’ method. The proposed system has been mounted on TBMs and verified based on field tests.

27 June 2023 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
LNLichao Nie
Lichao Nie
YGYifan Guo
Yifan Guo
WPWenbing Pei
Wenbing Pei
JSJunfeng Shen
Junfeng Shen
WZWei Zhou
Wei Zhou
DZDuo Zhang
Duo Zhang

13 October 2020 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
WZWei Zhou
Wei Zhou
Lichao NieLichao Nie
Lichao Nie
FSFahe Sun
Fahe Sun
XXXinji Xu
Xinji Xu
YZYi Zhang
Yi Zhang
The seismic ahead-prospecting method is useful to detect anomalous zones in front of the tunnel face. However, most existing seismic detection method is designed for drilling and blasting tunnel. The detection method should be improved to satisfy the rapid tunneling of Tunnel Boring Machines (TBMs). This study focuses on reducing the time spent on seismic data processing and result analysis. Therefore, to reduce the data processing time, an automatic initial model establishment method based on surrounding rock grade is proposed. To reduce the time spent on result analysis and avoid subjective judgment, a modified k-means++ method is adopted to interpret the detecting results and extracting anomalous zones. The efficacy of the developed method is demonstrated by field tests. The fractured zones such as cavity collapse and fissure are successfully predicted and identified.

16 June 2026 in Geophysics
Verified
Journal Article
Closed access
LNLichao Nie
Lichao Nie
YLYuancheng Li
Yuancheng Li
WZWei Zhou
Wei Zhou
ZLZhiqiang Li
Zhiqiang Li
YXYue Xiao
Yue Xiao
SJShixun Jia
Shixun Jia
With the rapid development of underground engineering, tunnel construction faces the challenge of increasingly complex geological conditions. Geological hazards, such as water inrush, frequently occur during tunnel construction. Specifically, water inrush is primarily governed by hydraulic conductivity. Therefore, accurately assessing the distribution of hydraulic conductivity ahead of the tunnel face is vital. However, applying hydraulic tomography (HT) as a routine method during tunnel construction is difficult because of its time-consuming implementation and limited data availability, which can significantly affect the construction schedule. Therefore, an inversion method using hydrogeologic data under full-decay induced polarization (FDIP) constraints is proposed to assess hydraulic conductivity distribution in front of the tunnel face. The proposed method combines the complementary advantages of HT and FDIP by constructing a spatial gradient function from the relaxation time to constrain the conventional HT inversion, thereby improving the accuracy of hydraulic conductivity inversion. The constrained inversion method is tested on synthetic model, and the results are compared with the individual HT. The results indicate that the proposed approach can more accurately delineate zones of high hydraulic conductivity. Additionally, the constrained inversion method is more robust because the constructed spatial gradient constraint function preserves the high-resolution gradient information from FDIP. Hence, the proposed method is applied to a diversion tunnel project in southwestern China, and the results demonstrate its ability to accurately assess the hydraulic conductivity ahead of the tunnel face. The proposed method is efficient and cost-effective and has potential for engineering applications, providing a feasible approach for accurately assessing areas with anomalous hydraulic conductivity ahead of the tunnel face.