Although performing tunnel excavation using tunnel boring machines (TBMs) is rapid, it is susceptible to the unexpected geological changes located in front of the tunnel face. Seismic detection methods are useful to detect local geological conditions in front of the tunnel face. However, manual detection is time consuming and may interfere in realizing rapid excavation by TBMs. Therefore, this study proposes an automated seismic detection system that is mounted on a TBM for rapidly imaging anomalous zones in front of the tunnel face. The system consists of an automated data acquisition system and a data processing system. The automated data acquisition system allows reducing the data acquisition time. To reduce the data processing time, the data processing system images the anomalous zones based on a modified Coppens’ method. The proposed system has been mounted on TBMs and verified based on field tests.
27 June 2023 in Bulletin of Engineering Geology and the Environment
The seismic ahead-prospecting method is useful to detect anomalous zones in front of the tunnel face. However, most existing seismic detection method is designed for drilling and blasting tunnel. The detection method should be improved to satisfy the rapid tunneling of Tunnel Boring Machines (TBMs). This study focuses on reducing the time spent on seismic data processing and result analysis. Therefore, to reduce the data processing time, an automatic initial model establishment method based on surrounding rock grade is proposed. To reduce the time spent on result analysis and avoid subjective judgment, a modified k-means++ method is adopted to interpret the detecting results and extracting anomalous zones. The efficacy of the developed method is demonstrated by field tests. The fractured zones such as cavity collapse and fissure are successfully predicted and identified.
With the rapid development of underground engineering, tunnel construction faces the challenge of increasingly complex geological conditions. Geological hazards, such as water inrush, frequently occur during tunnel construction. Specifically, water inrush is primarily governed by hydraulic conductivity. Therefore, accurately assessing the distribution of hydraulic conductivity ahead of the tunnel face is vital. However, applying hydraulic tomography (HT) as a routine method during tunnel construction is difficult because of its time-consuming implementation and limited data availability, which can significantly affect the construction schedule. Therefore, an inversion method using hydrogeologic data under full-decay induced polarization (FDIP) constraints is proposed to assess hydraulic conductivity distribution in front of the tunnel face. The proposed method combines the complementary advantages of HT and FDIP by constructing a spatial gradient function from the relaxation time to constrain the conventional HT inversion, thereby improving the accuracy of hydraulic conductivity inversion. The constrained inversion method is tested on synthetic model, and the results are compared with the individual HT. The results indicate that the proposed approach can more accurately delineate zones of high hydraulic conductivity. Additionally, the constrained inversion method is more robust because the constructed spatial gradient constraint function preserves the high-resolution gradient information from FDIP. Hence, the proposed method is applied to a diversion tunnel project in southwestern China, and the results demonstrate its ability to accurately assess the hydraulic conductivity ahead of the tunnel face. The proposed method is efficient and cost-effective and has potential for engineering applications, providing a feasible approach for accurately assessing areas with anomalous hydraulic conductivity ahead of the tunnel face.