Multiple-criteria analysis methods are a useful tool for decision making support in everyday engineering practice. They turn out to be especially helpful when one considers numerous variants described by many parameters, such as commercially available drywall systems - plasterboard partition walls, claddings and suspended ceilings. In this study four methods of multiple-criteria analysis are investigated (weighted sum, weighted product, ideal point and PROMETHEE II) and 7 normalization algorithms (vector, Manhattan, maximum, Weitendorf linear, Jüttler-Korth linear, Peldschus nonlinear, Zavadskas and Turskis logarithmic) and their influence on the rankings obtained for 5 groups of products: plasterboard partition walls without fire resistance, EI30 partition walls, hard partition walls, suspended ceilings and ceiling claddings. The study shows high sensitivity of the commonly used methods to input data normalization algorithms and indicates the need for a cautious approach to the results obtained by them
The paper presents new technology on polish market – BIM. Nowadays method of project management and construction did not change for many decades. Traditionally, all information were handed over in the form of flat drawings: sketches, graphics, technical drawings and nowadays in program generated visualizations. Documentation form has involved, but it was always two-dimensional. Over last years, the new conception has raised, which base on changing the technology of design. BIM – Building Information Modeling is one the most latest and important technologies for architecture, civil engineering and construction management. Information are handed over in the form of three dimensional model which consists of separated models. They are characterized by parameters such as: mass, length, layer, level, phase of construction process when element is used or produced. In other words, they are ideal illustration of components, which are built in to building. This way the reliable virtual copy of building is created
The problem described in this paper deals with construction project scheduling for multi-object projects. The use of the flow shop model allows for quick execution through optimal, simultaneous means of production. The correct order of tasks according to assumed criteria is the subject of a lot of research. In this paper, we have focused on the aspect of multi-project work crews. In practice, we often observe cases where overburdened crews are supported by ones with downtime. This paper presents a newly developed model used to smoothe out schedules in terms of maintaining crew work continuity. A full description of the algorithm and example usage are presented.