John Olav Giæver Tande

John Olav Giæver Tande


Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2012 in Wind Engineering
Verified
Journal Article
Closed access
TAThomas L. Acker
Thomas L. Acker
ARAndré Robitaille
André Robitaille
HHHannele Holttinen
Hannele Holttinen
MPMarian Piekutowski
Marian Piekutowski
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande
In May of 2004, the IEA Wind Implementing Agreement (IA) established R&D Task 24, “Integration of Wind and Hydropower Systems.” Australia, Canada, Finland, Norway, Sweden, Switzerland, and the United States joined Task 24 with the goal of collaborating in the study of wind integration in a variety of electrical system configurations (load, generation, and transmission); hydro system configurations and characteristics; and market and operational configurations. Representing these countries were utilities and research organizations with the intent to understand the potential for and limiting factors in integrating wind into systems with hydropower. Case studies that analyze the feasibility, benefits, detriments, and costs of specific wind-hydro integration projects were the mechanism through which the goals of the task were addressed. The purpose of this article is to summarize the framework within which these studies were performed, and to present the key results and the general conclusions of the Task.

26 June 2014 in Wires Energy and Environment
Verified
Journal Article
Closed access
PDF file
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande
KMKarl Merz
Karl Merz
UPUwe Schmidt Paulsen
Uwe Schmidt Paulsen
HSHarald G. Svendsen
Harald G. Svendsen

1 May 2004 in Wind Engineering
Verified
Journal Article
Closed access
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande
KUKjetil Uhlen
Kjetil Uhlen
This paper assesses the connection of a large wind farm to a regional power system with a weak link to the main transmission grid. The study demonstrates that utilization of modern wind turbine technology and automatic generation control schemes allow operation of large wind farms in weak grids. In the case study considered of a regional power system, the viable wind farm capacity may be increased from 50 to 200 MW.

1 June 2007 in 2007 IEEE Power Engineering Society General Meeting
Verified
Conference Paper
Closed access
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande
This paper considers the impact of wind farms on power system adequacy. The impact is studied using data from a real life regional power system with a predicted need for new generation to meet future demand. The question is if adding wind power to the system will be sufficient or if additional measures must be taken. The paper concludes that wind power contributes to reducing the loss of load probability, but the positive effect is less pronounced at high wind penetration. Adding a storage component to the wind farms provides for enhanced controllability and load carrying capability.

21 January 2005
Verified
Book Chapter
Closed access
PDF file
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande

1 March 2006 in Wind Engineering
Verified
Journal Article
Closed access
OMOlve Mo
Olve Mo
John Olav Giæver TandeJohn Olav Giæver Tande
John Olav Giæver Tande
LWLeif Warland
Leif Warland
KLKjell Ljøkelsøy
Kjell Ljøkelsøy
Grid codes concerning low-voltage fault ride-through capabilities of wind turbines are not (yet) harmonized, varying from country to country. Full-scale field testing of wind turbines with respect to all such codes may therefore not be practical. IEC 61400-21 is currently under revision, and the last committee draft (CD 2006) presents a standardized physical test for characterizing a wind turbine's response to a voltage-dip. The results of such physical tests may be used to validate numerical models of the turbine, which in turn can be used for modelling grid code compliance assessment of particular country codes. Success with such modelled validation will provide confidence in numerical simulations. The hypothesis of this paper is that the use of numerical models, that have been validated against the standardized tests, can reduce the number of physical full-scale tests needed. This paper assesses to what degree a validated simulation model is capable of predicting the fault ride-through capabilities of a fixed speed induction generator. This is done by comparing measurements on a wind-turbine emulator in a laboratory with predictions from a validated simulation model of the laboratory emulator. Simulations and laboratory measurements show excellent agreement. The validated simulation model accurately predicts the fault ride-through capability of the direct grid connected induction generator. It is concluded that the proposed methodology is promising and thus has the potential to increase the efficiency of grid code assessments. Full-scale field tests will still be required to validate the modelling completely, but using numerical models reduces the number of field tests needed.