1 September 2022 in Journal of Urban Planning and Development
Verified
Journal Article
Closed access
PDF file
TWTing Wang
Ting Wang
JFJingchun Feng
Jingchun Feng
Based on an increasing amount of attention paid to explore why building information modeling (BIM) application levels are so low and what are the obstacles that hinder the further application of BIM, a range of existing studies began to explore BIM from different research perspectives. However, these studies only focus on a single perspective to explore this issue in isolation, ignoring the correlation between them. Therefore, by reviewing the hot perspectives of in-depth discussion on this issue in the existing literature, the present study focuses on exploring the quantitative relationships between BIM definition, BIM capability maturity, integrated project delivery (IPD), BIM diffusion, and moral hazard. Structural equation modeling (SEM) was conducted using data from 295 questionnaires to empirically verify our research model. The results show that the perfection of BIM technology, BIM process, and BIM policy have a positive association with BIM capability maturity. In addition, these three factors can be used as mediating variables to affect the relationship between the other two factors and BIM capability maturity. Moreover, BIM capability maturity has a positive impact on the realization of IPD. Specifically, BIM diffusion was found to positively moderate the relationship between BIM capability maturity and the realization of IPD, while moral hazard plays a negatively moderating role. The findings of this research contribute to lay a theoretical foundation for discussing how to improve BIM capability maturity from the perspective of BIM definition, as well as the influence of BIM capability maturity and BIM-related promotion and hindrance factors on IPD, an ideal project transaction model. Understanding these in-depth underlying interrelations can contribute to fully realizing the real implementation of BIM and improve the acceptance of IPD, and ultimately realize the transformation and upgrading of the Architecture, Engineering, Construction, and Operations industry and the construction of smart cities.

5 June 2020 in Frontiers in Ecology and Evolution
Verified
Journal Article
Open access
PDF file
YCYun Chen
Yun Chen
YSYizhen Shao
Yizhen Shao
JXJingjing Xi
Jingjing Xi
ZYZhiliang Yuan
Zhiliang Yuan
YYYongzhong Ye
Yongzhong Ye
TWTing Wang
Ting Wang
Diversified community types provide different microhabitats for plant growth. However, whether the distribution of species is random distribution or ecological specialization within different plant community types remains to be elucidated. Here, five 1 ha (100 m × 100 m) plots with different communities were established in a temperate forest. We examined community structure differences by non-metric multidimensional scaling and betadisper test, analyzed the species–community relationships by correlation network approach, and then the examined distribution preferences of woody plant species by torus-translation test. Results showed that the abundance, richness, and species composition of woody plants exhibited significant differences among the five communities. The specialization index showed that 42.83% of the species had the characteristics of distribution specialization for different communities. The torus-translation test showed that 85 species (86.74%) were positively associated with specific community. Our findings suggested that the distribution of woody plants species among different plant community types is not random but specialization. Different woody plant species have distinct specific preferences among various plant community types in temperate mountain forest. These findings provide new insights into the biodiversity conservation of woody plant species in temperate deciduous broad-leaved forests and indicate the potential importance of community partitioning for the maintenance of woody plant diversity.

1 January 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
TWTing Wang
Ting Wang
JFJingchun Feng
Jingchun Feng
In traditional design-bid-build (DBB) mode, due to the sequential execution of design and construction, the review method of construction documentations is a one-time review at the beginning of the construction phase. However, in design-build (DB) mode, to realize the concurrent execution between design and construction tasks, the review method of construction documentations is multiple reviews during the concurrent execution, and the problem of when and how to review under this review method has not been solved yet. Therefore, dynamic and static decision models are creatively constructed to solve when and how to review. Based on the dynamic decision model, the influence of the execution of the review strategy on the preparation duration, review duration, executable tasks and rework duration during construction was discussed. Based on the static decision model, the influence of design accuracy, construction sensitivity, and review efficiency on the review method under different time ratios was discussed. The research achievements provide operational countermeasures for exploring the principles of developing review strategies in the concurrent execution process from the perspective of quantitative analysis, and also provide directional suggestions for the way of applying concurrent engineering in DB mode.

6 August 2022 in Concurrent Engineering
Verified
Journal Article
Closed access
TWTing Wang
Ting Wang
JFJingchun Feng
Jingchun Feng
Concurrent execution of design and construction tasks is an important way to realize the integration of them in design-build (DB) mode, but it may bring about period risk due to multiple rework and frequent information transfer in local scope. To solve this problem, this study constructs a concurrent execution strategy model from the perspective of quantitative analysis with the decision goal of minimizing the total execution duration. The results show that: first, when the probability of information change between design and construction tasks decreases gradually, the optimal overlap degree increases and the optimal parallelism decreases. Second, learning effect can effectively shorten the minimum duration corresponding to the optimal overlap degree under any degree of parallelism. Thirdly, with the decrease of the probability of information change between design and construction tasks and the strengthening of learning effect, the shortening rate of the actual execution duration corresponding to the optimal parallelism will be gradually greater than the increasing rate of the actual execution duration. The findings of the study provide suggestions for exploring the mechanism of concurrent execution in DB mode, and also provide countermeasures for better realization of integration of design and construction in DB mode.

24 September 2026 in International Journal of Mechanics and Materials in Design
Verified
Journal Article
Closed access
PDF file
TWTing Wang
Ting Wang

Verified
Journal Article
Open access
PDF file
TWTing Wang
Ting Wang
XDXuefeng Ding
Xuefeng Ding
BLBangguo Liu
Bangguo Liu
Parallel operations by multiple trades on constrained workfaces pit safety against schedule. Static schedulers, scalar fatigue models, and standard evolutionary algorithms all struggle to reconcile the two. Simulation tackles the Parallel Task Matching Problem (PTMP). A Spatial Conflict Graph quantifies workspace interference, with edge weights combining a 3D Jaccard overlap and a process-coupling coefficient. The Cross-Task Fatigue Transfer Model (CTFTM) governs whole-body, localized, and cognitive fatigue. Task-specific accumulation, recovery, and crosstalk parameters in this coupled ODE system capture fatigue carryover across heterogeneous activities. Minimizing schedule delay and OHS risk then follows from a bi-objective model under spatial-conflict, fatigue, skill, crew-size, and precedence constraints. An NSGA-III extension uses integer worker–task encoding, a Conflict Repair Operator that modifies fewer than 7% of genes and removes penalty calibration, and TOPSIS-based Pareto selection. Hybrid re-scheduling pairs persistent event triggers with structural state updates and a periodic trigger. The test campaign used three parallel tasks, eight heterogeneous workers, five ablative baselines, four empirical sensitivity analyses, and a design-level threshold assessment. Standalone calibration produced comparable, trade-off-dependent multi-objective performance for NSGA-III, NSGA-II, and MOEA/D; NSGA-III with conflict repair was retained for the full dynamic experiments. Over-threshold-fatigue workers fell from 5.789 to 0.020 relative to the scalar-fatigue baseline. Fatigue-efficiency index (FEI) improved by 43.5% relative to the scalar-fatigue baseline, alongside robust real-time disruption handling. Taken together, these results establish a simulation-based foundation for intelligent, safety-aware workforce scheduling.