This article presents a study of sustainability in railway investment projects. The purpose of the study was to analyse how sustainability is interpreted and evaluated in the early phases of major public investment projects. These phases are characterized by potentially very influential decisions being made prior to when precise, detailed knowledge is available. The research uses a mix of qualitative and quantitative information sources and three datasets; 12 interviews, document analyses for 10 railway projects, and a case study. The qualitative data are from semi-structured interviews, while the quantitative data are based on structured document review of planning documents from ten Norwegian railway projects. In addition, a detailed case study of a major rail infrastructure project has been performed. The findings show that several aspects of sustainability are evaluated in the early phase of investment projects, but there are no explicit requirements to do an overall analysis of sustainability. Environmental aspects of sustainability are predominant in the respondents’ interpretation of the concept. Still, the structure and requirements of the early phases in the national project model ensures that the economic dimension of sustainability has the most influence in decisions regarding which project concepts that receive financing for further development.
25 April 2018 in International Journal of Managing Projects in Business
Purpose: Standardizing the development, planning and construction of public building projects can contribute to timely and efficient project delivery. This is especially relevant when there are urgent needs for capacity. The purpose of this paper is to share the experiences from the development of standardized concepts for school extensions and prison building in Norway. Design/methodology/approach: The research questions posed in this paper are on the interaction between public entities project delivery models and standardizing building types and the construction method. To investigate the research questions, the paper presents the findings from two case studies: school and prison development and construction projects. It is based on a literature review, semi-structured interviews, document studies and quantitative data on time and cost for the planning and construction phases. Findings: Standardization and use of modularized building systems can contribute to shortened delivery time by reducing the duration of both the planning and construction phase. The most significant time reduction resulted from less time spent on quality assurance of cost estimates prior to the funding of the projects. Project costs increased in the school case, but were reduced in the prison case. An important challenge faced in both cases is a shallow pool of capable suppliers; the actors have approached the challenge with different strategies, yet neither actor has been successful in their attempts. Originality/value: The paper provides empirical data to add to the collective knowledge on the project management aspects of using standardized project delivery models and standardized (modular) building. However, by emphasizing the interaction between project delivery models and standardization of the planning and execution of the projects, additional insight into the benefits and challenges are highlighted.
Scope management in the form of reduction lists was integrated in the quality assurance scheme for Norwegian public projects in 2001. This article presents findings on the actual use of reduction lists for major public construction projects Project representatives were contacted to obtain information about the actual use of pre-defined potential scope reductions. Eight of the 14 studied projects did not implement any of the predefined reductions. Six projects implemented some of the reductions. The scope reductions on the reduction lists are very specific and detailed, unlike general theory on scope management and cost control. However, the findings from the study are in line with the general theory; it was the most general scope and cost reductions that where used in practice. The study subsequently looked into the relationship between scope reductions and sustainability. Although the most frequently observed reduction was of the category “reduced quality or functionality”, sustainability was rarely affected with the notable exception of the railway infrastructure projects.