liu pan

Dr. liu pan


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 December 2019 in Materials
Verified
Journal Article
Open access
PDF file
QSQingchuan Shen
Qingchuan Shen
Wei ChenWei Chen
Wei Chen
CLChao Liu
Chao Liu
WZWenjie Zou
Wenjie Zou
LPliu pan
liu pan
In this study, tensile splitting tests and corresponding numerical simulations are performed on high strength concrete, low strength concrete, the interface between the two types of concrete, and the interface reinforced by steel fiber, respectively. The tensile splitting strength, crack initiation load, and damage characteristics are analyzed based on experiment data and fracture surface of samples. It can be concluded that tensile splitting strength and crack initiation load have the descending order of ‘HT’ (high strength concrete sample) > ‘LT’ (low strength concrete sample) > ‘FT’ (interface reinforced by steel fiber) > ‘OT’ (interface). The tensile splitting strength is related not only to the roughness of the fracture surface, but also to the percentage of fractured aggregates. The steel fiber can increase initiation cracking load, peak load and residual strength of the interface. The existing of interface composited by two types of material can cause asymmetric distribution of the stress state, even if geometry and the load are symmetrical for samples.

28 May 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CLChao Liu
Chao Liu
PZPeng Zhuohua
Peng Zhuohua
LPliu pan
liu pan
HLHai Liu
Hai Liu
YYYUBING YANG
YUBING YANG
HJHuaqin Jiang
Huaqin Jiang
This study investigates the influence of subsequent tunnel boring machine (TBM)-driven processes on the responses of the first tunnel in twin-tunnel construction using the ultra-rapid underground pass (URUP) method. A comprehensive finite element analysis (FEA) is performed to simulate the URUP TBM tunneling, considering the non-uniform convergence caused by the TBM geometry, the tunnel face supporting pressure, and the tail-grouting pressure. The FEA model is validated by the monitoring results of the bending element of the first tunnel lining. The FEA results reveal that the grouting pressure of the second tunnel has significant influence on lining deformation of the first tunnel, while the face supporting pressure shows little effect. The relationship between the grouting pressure and the maximum bending moment of adjacent first tunnel can be fitted by linear function. A grouting pressure equals to the lateral earth pressure is able the reduce the variation of the bending element of the first tunnel during the TBM-driven process of the second tunnel. The bending element of the first tunnel shows a typical lognormal relationship with the face supporting pressure during the TBM advance of the second tunnel. A critical cover-to-depth ratio, under which the horizontal and vertical soil arching effect vanishes, can be deduced to be within the range of 0.55–0.60.