Keunhee Cho

Dr. Keunhee Cho

Korea Institute of Civil Engineering and Building Technology, Goyang-si, Republic of Korea
orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2017 in Construction and Building Materials
Verified
Journal Article
Closed access
HJHyun-O Jang
Hyun-O Jang
Han-Seung LeeHan-Seung Lee
Han-Seung Lee
KCKeunhee Cho
Keunhee Cho
JKJinkyu Kim
Jinkyu Kim

8 January 2015 in Sensors
Verified
Journal Article
Open access
PDF file
SKSung Tae Kim
Sung Tae Kim
YPYoung-Hwan Park
Young-Hwan Park
SPSung Yong Park
Sung Yong Park
KCKeunhee Cho
Keunhee Cho
JCJeong-Rae Cho
Jeong-Rae Cho
Prestressed Concrete Wire and Strand (PC) strands are the most used materials to introduce prestress in a Pre-Stressed Concrete (PSC) structure. However, it is difficult to evaluate the final prestress force of the PC strand after prestressing or its residual prestress force after completion of the structure on site. This impossibility to assess eventual loss of prestress of the PC strand has resulted in a number of serious accidents and even in the collapse of several structures. This situation stresses the necessity to maintain the prestress force residual or after prestressing for the evaluation of the health of the concrete structure throughout its lifespan. Recently, several researchers have studied methods enabling one to verify the prestress force by inserting an optical fiber sensor inside the strand but failed to provide simple techniques for the fabrication of these devices to fulfill measurement performance from the design prestress to failure. Moreover, these methods require the additional installation of electrical resistance strain gages, displacement sensors and load cells on the outer surface of the structure for long-term precise measurement. This paper proposes a method enabling one to evaluate precisely and effectively the prestress force of the PC strand and intends to verify the applicability of the proposed method on actual concrete structures. To that end, an innovative PC strand is developed by embedding a Fiber Bragg Grating (FBG) sensor in the core wire of the PC strand so as to enable short term as well as long term monitoring. The measurement performance of the developed strand is then evaluated experimentally and the reliability of the monitoring data is assessed.

12 May 2016 in Materials
Verified
Journal Article
Open access
PDF file
Han-Seung LeeHan-Seung Lee
Han-Seung Lee
HJHyuno Jang
Hyuno Jang
KCKeunhee Cho
Keunhee Cho
This study set out to derive the optimal conditions for ensuring the monolithicity of ultra-high-performance concrete (UHPC). Direct shear tests were performed to examine the influence on the bonding shear performance. The experimental variables included tamping and delay, which were set to 0, 15, 30, and 60 min. SEM and XRD analyses of the microstructure and composition were performed. The direct shear tests showed that the bonding shear strength was enhanced by the addition of tamping. For the normal-strength concrete (NSC), it is thought that a monolithicity of around 95% can be attained with a cold joint formation delay up to 60 min. In contrast, while the normalized bonding shear strength reduction of UHPC with a delay of 15 min was the lowest at around 8%, a dramatic degradation in the bonding shear performance was observed after 15 min. XRD analyses of the middle and surface sections revealed the composition of the thin film formed at the surface of the UHPC and, as a result, the main component appeared to be SiO2, which is believed to be a result of the rising of the SiO2-based filler, used as an admixture in this study, towards the surface, due to its low specific gravity.

1 February 2006 in Computers & Structures
Verified
Journal Article
Closed access
KCKeunhee Cho
Keunhee Cho
JCJeong-Rae Cho
Jeong-Rae Cho
WCWon-Jong Chin
Won-Jong Chin
BKByung-Suk Kim
Byung-Suk Kim

28 October 2010 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
KCKeunhee Cho
Keunhee Cho
SPSung Yong Park
Sung Yong Park
SKSung Tae Kim
Sung Tae Kim
JCJeong-Rae Cho
Jeong-Rae Cho
BKByung-Suk Kim
Byung-Suk Kim
Strong composition between FRP and concrete is an indispensable prerequisite to achieve the structural integrity of FRP-concrete composite deck. Accordingly, this study evaluates experimentally the behavioral characteristics of such shear connection systems realized by coarse sand coating and concrete wedge. The results show that coarse sand coating develops composite performance close to perfect composition in the shear direction but exhibits weakness against normal split. On the other hand, concrete wedge appears to be an efficient solution to resolve such problem. Therefore, a new shear connection system combining coarse sand coating and concrete wedge has been conceived and test revealed that the new shear connection system provides equivalent static performance together with significantly improved fatigue performance compared to the coarse sand coating composition. Following, the shear connection system combining both coarse sand coating and concrete wedge constitutes an efficient solution satisfying the strong composition requirement for the structural system.

1 December 2012 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
JCJeong-Rae Cho
Jeong-Rae Cho
SPSung Yong Park
Sung Yong Park
KCKeunhee Cho
Keunhee Cho
SKSung Tae Kim
Sung Tae Kim
BKByung-Suk Kim
Byung-Suk Kim
In this study, a series of pull-out tests on fibre-reinforced polymer (FRP) perfobond rib shear connectors were conducted to investigate their shear behavior. The test specimens were designed to examine only the effects of the resistance by rib holes. The test variables were the size and number of rib holes. In the tests, the resistance by concrete dowel action was practically linearly proportional to the area of the rib hole. However, the resistance appeared to be nonlinearly proportional to the number of rib holes with a slight loss for a larger number of the rib holes, due to the sequential failure of the rib holes. The constitutive equation of the discrete spring model representing the concrete dowel including post-failure frictional effects, adopting the diameter of the rib hole as parameter, was derived through regression analysis of the load – relative displacement curve obtained for specimens with a single rib hole. The proposed discrete spring model resulted in good correlation with the experimental results for specimens with a larger number of rib holes. It is expected that the derived constitutive equation would be useful for the analysis and design of structures using FRP perfobond rib shear connectors.