Javier Sepúlvead-Morales

Javier Sepúlvead-Morales

Universidad del Bio Bio, Concepción, Biobío, Chile
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 March 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Eric ForcaelEric Forcael
Eric Forcael
Alejandro Martínez-RocamoraAlejandro Martínez-Rocamora
Alejandro Martínez-Rocamora
JSJavier Sepúlvead-Morales
Javier Sepúlvead-Morales
Rodrigo Garcia AlvaradoRodrigo Garcia Alvarado
Rodrigo Garcia Alvarado
ANAlberto Nope-Bernal
Alberto Nope-Bernal
FLFrancisco Leighton
Francisco Leighton
Collaborative work in Building Information Modeling (BIM) projects is frequently understood as the interaction of modelers in an asynchronous way through modification requests or via e-mail/telephone. However, alternative work methodologies based on creating a common and synchronous environment allow solving issues instantaneously during the design process. This study aimed to analyze the behavior and performance of BIM users with different specialties who were subjected to an experimental exercise in a collaborative environment. For this purpose, a process was devised to collect, sort, and select the data from the log files generated by the BIM software. A timeline of the experiment was populated with data on the intensity and types of commands used by each specialist, which allowed determining behavioral patterns, preferred commands, indicators of their experience, further training needs, and possible strategies for improving the team’s performance. In the experiment, the mechanical designer’s performance was 49% and the rest approximately 64%, with respect to that of the architect. An average rate of 1.66 necessary or auxiliary commands for each contributory command was detected. The average performance was 200–400 commands per hour, which intensified by the end of the experiment. Further training needs were detected for the plumbing designer to reduce the use of backwards commands. Conversely, the electrical designer showed a positive evolution regarding this aspect during the experiment. The analysis methods here described become useful for the aforementioned purposes. Nevertheless, combinations with methods from existing research might improve the outcomes and therefore the specificity of recommendations.

5 August 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Eric ForcaelEric Forcael
Eric Forcael
JPJavier Pérez
Javier Pérez
ÁVÁlvaro Vásquez
Álvaro Vásquez
Rodrigo Garcia AlvaradoRodrigo Garcia Alvarado
Rodrigo Garcia Alvarado
FOFrancisco Orozco
Francisco Orozco
JSJavier Sepúlvead-Morales
Javier Sepúlvead-Morales
Historically, the construction industry has exhibited slow technological development when compared to other industries. However, during the last several years, investigations related to automation in construction have been conducted, such as additive manufacturing in concrete. This study aims to delve into this topic, providing effective communication between BIM-designed elements and its additive concrete manufacturing, with the help of an articulated robotic arm. Therefore, the paper addresses the preparation of computer code that allows such BIM–robot communication, checking the parameters utilized, and analyzing the results of tests with the equipment involved.