The stability and economic level of the power system operation during the penetration of Wind Power Plants (WPPs) are much determined by the variability and uncertainty of the wind power output. The characteristics of seasonal wind power output can be used to define the optimal operating reserves of a stable and cost-effective power system operation. This paper proposes a comprehensive algorithm of hybrid Artificial Intelligence (AI) approach that combines the Seasonal Autoregressive Integrated Moving Average (SARIMA) and selected Neural Network Variants (NNVs) in Seasonal Daily Variability and Uncertainty (SDVU) scheme. Among all NNVs, Long Short-Term Memory (LSTM) shows the most consistent and accurate results. With the hybrid AI approach, this algorithm calculates the Dynamic Confidence Level (DCL) to determine hourly operating reserves on a daily basis. The proposed algorithm has been successfully tested using historical data of real-world WPPs that operated in Indonesia. Furthermore, the comparison toward non-seasonal with a Static Confidence Level (SCL) in several percentile scenarios is made to prove the cost-effectiveness advantages of this new algorithm that may save up to 4.2% of total daily energy consumption. An interface application is added so that the results of this research can be directly utilized by users both on the observed power system and generally in Indonesia.
Renewable Energy Power Plant (REPP) such as Solar Power Plant (SPP) and Wind Power Plant (WPP) are the most popular types of REPP and have been developed and operated widely around the world because of their advantages as clean energy, cheap fuel cost, and the investment costs are decreasing significantly. Recent years in Indonesia, SPP and WPP have started to be developed in several regions. Based on the Longterm Planning Document of Electricity Development issued by Indonesia Government, in 2025 it is targeted that around 23% of the total energy mix in Indonesia will come from REPP. But on the other hand, the two types of power plants have intermittent/variable characteristics that vary rapidly according to weather and solar intensity conditions even naturally uncontrollable by the system operators. It is categorized as Variable Renewable Energy (VRE). This Intermittent nature has the potential to endanger the stability and reliability of electric power system network. One of the root causes is lack of provisions in Grid Code that clearly regulates the operational of VRE. It raises a lot of researches to discover appropriate and specific adaptation of the existing Grid Code that unique for each network based on its own characteristics, government policies, and the availability of local natural resources.This paper presents a brief literature review on Grid Code that has been implemented not only in Indonesia but also abroad. This paper also reviews characteristic of VRE from various textbook references, government regulations, and scientific journals. Furthermore, this paper presents an exposure of the impact of SPP operation in Kupang sub system, in term of operating pattern and power system stability. It will be used as a preliminary study in the formulation of the technical parameters of the Indonesian Grid Code Adaptation toward Variable Renewable Energy Penetration.
Jawa Bali power system represents nearly 80% total loads of Indonesia. JCC is the master station that control power system in Jawa Bali. Energy management and 500 kV EHV T/L switching are the main tasks to be maintained optimal. For the complexity of the network that consists of hundreds generator units and substations and thousands KMC of transmission line, it needs EMS application tools to help dispatcher to control the system securely and economically. EMS is the application that being embedded to the SCADA systems. LFC and NA is the main parts of EMS that being used in JCC. In this paper, experiences of JCC in using LFC since 1993 is presented and described. The process of database and TM/TS improvement in order to activate NA after 18 years blocked is discussed as well. In advance, experiences of dispatcher in using NA will be shared.
Indonesia is a big country which has many isolated power system networks. Sumatera power system is one of the main power system networks in Indonesia that supplies electricity for more than 45 million inhabitants in Sumatera Island. For the transmission topology and load characteristic, there are some dynamic stability problems in Sumatera power system such as voltage and small signal stability. To support the system operators, since the mid of 2014 all transmission lines in the system have been monitored by Digital Fault Recorder (DFR). Furthermore, all DFRs are equipped with synchrophasors facility based on IEEE Std. C37.118 protocol. This paper will tell the assignment of a special team regarding utilization of DFR devices located in the remote substations not only for disturbance data recording but also for dynamic system monitoring and control of Sumatera power system from the control centers. It will explain chronological steps of the team in remotely monitoring DFR devices, solving bottleneck in data traffic, and tuning data parameter in the Master PMU in order to implement dynamic monitoring of Sumatera power system. Furthermore, since the limitation of basic synchrophasors software, the team try to use enhance PMU Data acquisition that support Wide Area Monitoring System (WAMS) based on DFR Data. This paper will describe the experience of the system operators in using the application to control power transfer from southern to the Central Sumatera by monitoring voltage stability phenomena in certain transmission lines. It will also include future plan of the team to synchronize northern and central-southern subsystems while monitoring the small signal stability phenomena between both subsystems. Finally, this paper will tell lesson learned by the team in implementing the action plans.
Indonesia consists of many isolated electrical power system networks. Sumatera power system is one of the power system networks in Indonesia. It consists of 2 major networks, which are Northern Sumatera system and Central-Southern Sumatera system. Northern Sumatera system supplies two provinces, which are North Sumatera province and Aceh province. North Sumatera province has a loop topology while Aceh province has a radial one. In the last 3 years, there are four significant disturbances in the system that caused blackout situation in Aceh province. It caused so many complaints from customers and local government. The root cause of the problem came from the big power transfer along the radial topology and significant Force Outage Rate (FOR) along the transmission line. This situation was happened since more than 50% of power supply come from North Sumatera province and significant rate of lightning flash along the transmission line. This paper will give details about the implementation of No Load Shedding (NLS) Scheme in Aceh province network. With a a complete and smart combination with other special protection scheme, NLS scheme will increase reliability of electricity power supply to the local customer. This paper will explain the steps in designing the scheme, the need of coordination meeting with other stakeholder, and some constraints faced by the team in implementing NLS Scheme to the system. Finally, this paper will tell lesson learned in implementing NLS scheme and the benefit of this scheme to increase reliability of the system.