Branislava Ratković

Dr. Branislava Ratković

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2014 in International Journal of Production Economics
Verified
Journal Article
Closed access
MVMilorad Vidović
Milorad Vidović
DPDražen Popović
Dražen Popović
BRBranislava Ratković
Branislava Ratković

1 June 2016 in Expert Systems with Applications
Verified
Journal Article
Closed access
MVMilorad Vidović
Milorad Vidović
BRBranislava Ratković
Branislava Ratković
NBNenad Bjelić
Nenad Bjelić
DPDražen Popović
Dražen Popović

31 December 2011 in Resources, Conservation and Recycling
Verified
Journal Article
Closed access
MVMilorad Vidovic
Milorad Vidovic
BDBranka Dimitrijevic
Branka Dimitrijevic
BRBranislava Ratković
Branislava Ratković
Vladimir SimicVladimir Simic
Vladimir Simic

8 February 2016 in International Transactions in Operational Research
Verified
Journal Article
Closed access
PDF file
MVMilorad Vidović
Milorad Vidović
DPDražen Popović
Dražen Popović
BRBranislava Ratković
Branislava Ratković
GRGordana Radivojević
Gordana Radivojević

11 November 2011 in Waste Management & Research: The Journal for a Sustainable Circular Economy
Verified
Journal Article
Closed access
PDF file
BRBranislava Ratković
Branislava Ratković
MAMilan Andrejic
Milan Andrejic
MVMilorad Vidovic
Milorad Vidovic
In 2007, the Serbian Ministry of Health initiated specific activities towards establishing a workable model based on the existing administrative framework, which corresponds to the needs of healthcare waste management throughout Serbia. The objective of this research was to identify the reforms carried out and their outcomes by estimating the efficiencies of a sample of 35 healthcare facilities engaged in the process of collection and treatment of healthcare waste, using data envelopment analysis. Twenty-one (60%) of the 35 healthcare facilities analysed were found to be technically inefficient, with an average level of inefficiency of 13%. This fact indicates deficiencies in the process of collection and treatment of healthcare waste and the information obtained and presented in this paper could be used for further improvement and development of healthcare waste management in Serbia.

28 April 2023 in Mathematics
Verified
Journal Article
Open access
PDF file
DPDražen Popović
Dražen Popović
NBNenad Bjelić
Nenad Bjelić
MVMilorad Vidović
Milorad Vidović
BRBranislava Ratković
Branislava Ratković
In this study, we consider a production lot-sizing and scheduling problem found in the fruit juice production industry from an enhanced inventory management perspective. The problem can be classified as a P2SMM (two-stage multi-machine lot-scheduling) problem. We extended the classical P2SMM problem by incorporating an additional inventory management aspect of finished products to reflect a possible real-life case problem, specifically regarding the shelf-life concept and limited warehouse capacity, with a possibility of outsourcing the warehousing demand to a third-party logistics company. We developed the mixed integer linear programming (MILP) model to fully represent the considered problem (due to the NP-hard nature of the problem, only small-scale instances could be solved to optimality), and the hybrid variable neighborhood search with linear programming (VNS/LP) model to solve both small and real-life large-scale problem instances. The goal of the developed models is to minimize total costs that consist of the cost of backordering, the cost of planned minimum and maximum stock level violation, the cost of warehouse capacity overflow, the costs of production setup time and unused available production time. The main idea of the VNS/LP model is to solve the scheduling segment of P2SMM (the production sequence) via a VNS heuristic, and the lot-sizing segment of P2SMM via the linear programming (LP) model. Based on the results from five variants of the problem setup, a potential decision maker can have an overview of the impact of different important input parameters (production time costs, warehouse capacity and costs, inventory related costs and production demand) on the total cost of a production process and improve its efficiency in changing conditions.