Environmental context: Galvanic corrosion has been recently reported as the main cause of lead contamination in drinking water in urban cities. Conditions that can deter or promote galvanic corrosion, however, are not well understood. Fundamental investigations exploring the mechanisms and processes involved in galvanic corrosion in drinking water could help to implement proper corrective measures to safeguard public health from lead contamination. This study investigates the effects of pH value, chloride and sulfate concentrations on galvanic corrosion between lead and copper in drinking water. We hypothesised that galvanic corrosion would occur immediately when a lead–copper couple is first formed and that the release of lead would be suppressed by the subsequent formation of lead corrosion products. Therefore, unlike previous long-term studies using harvested lead pipes, batch experiments employing high-purity lead and copper (99.9 %) wires under stagnant and completely mixed conditions were conducted for a 7-day period to test our hypotheses. It was found that enhanced lead release was indeed observed after the lead–copper couple was formed and the lead profiles after 48 h were strongly influenced by lead corrosion products formed in the system. Under stagnant conditions, reducing pH and increasing either chloride or sulfate concentrations promoted lead release, leading to the formation of lead corrosion products such as cerussite and hydrocerussite as experiments proceeded. The effect of chloride concentration on total lead concentration measured in the aqueous phase was similar to that of sulfate at the same molar concentration, showing that the chloride-to-sulfate mass ratio may not provide a good indication for total lead concentration in water. This study provides essential information on fundamental mechanisms and processes involved in galvanic corrosion in drinking water and may be used to explain related phenomena observed in real drinking-water distribution systems.
In this pilot study, a modified sampling protocol was evaluated for the detection of lead contamination and locating the source of lead release in a simulated premise plumbing system with one-, three- and seven-day stagnation for a total period of 475 days. Copper pipes, stainless steel taps and brass fittings were used to assemble the “lead-free” system. Sequential sampling using 100 mL was used to detect lead contamination while that using 50 mL was used to locate the lead source. Elevated lead levels, far exceeding the World Health Organization (WHO) guideline value of 10 µg·L−1, persisted for as long as five months in the system. “Lead-free” brass fittings were identified as the source of lead contamination. Physical disturbances, such as renovation works, could cause short-term spikes in lead release. Orthophosphate was able to suppress total lead levels below 10 µg·L−1, but caused “blue water” problems. When orthophosphate addition was ceased, total lead levels began to spike within one week, implying that a continuous supply of orthophosphate was required to control total lead levels. Occasional total lead spikes were observed in one-day stagnation samples throughout the course of the experiments.