A sustainable, balanced energy portfolio is necessary for a country's continued economic growth. This portfolio must collectively be able to provide reliable, resilient electricity at stable, affordable prices. Nuclear energy is an important contributor to global clean energy supply, both as a primary source and by complementing and enabling other clean energy sources. As we look to the design and operation of future energy systems, we see an increasing need to think differently about how we utilize our energy resources to meet all of our energy needs—not just electricity but also industrial and transportation demands. Resource utilization in light of a broader desire to reduce environmental impacts leads us to consider transforming how we use nuclear energy, which currently provides more than half of the nonemitting electricity generated in the United States. A paradigm shift is required to develop optimal energy generation and use configurations that embrace novel approaches to system integration and process design. The US Department of Energy (DOE) Office of Nuclear Energy (NE) program on Integrated Energy Systems (IES)—formerly the Nuclear‐Renewable Hybrid Energy Systems (N‐R HES) program—was established to evaluate potential options for the coordinated use of nuclear and renewable energy generators to meet energy demands across the electricity, industrial, and transportation sectors. These formerly independent sectors are becoming increasingly linked through technology advances in data acquisition, communications, demand response approaches, and control technologies. Advanced modeling and simulation tools can be employed to design systems that better coordinate across these sectors. Implementation of integrated multi‐input, multi‐output energy systems will allow for expanded use of nuclear energy beyond the grid in a manner that complements the increased build‐out of variable renewable energy generation. These integrated systems would provide enhanced flexibility while also providing energy services and supporting the production of additional, nonelectric commodities (eg, potable water, hydrogen, and liquid fuels) via excess thermal and electrical energy from the nuclear system. Increased flexibility of traditionally baseload nuclear systems will support energy security, grid reliability, and grid resilience while maximizing the use of clean energy technologies. This paper provides an overview of current efforts in the United States that assess the potential to increase utilization of nuclear energy systems, in concert with renewable energy generation, via the IES program. Analysis tools and approaches and preliminary analysis results are summarized, and planned experimental activities to demonstrate integrated system performance are introduced.
This report discusses the different options for coupling thermal energy storage (TES) systems to advanced nuclear power plants (A-NPPs) in order to enable flexible and hybrid plant operation. An advanced light-water reactor (A LWR), a high-temperature gas-cooled reactor (HTGR) and a liquid-metal fast reactor (LMFR) were selected as the initial use cases for demonstrating a thermally balanced energy storage coupling design for thermal power extraction. The models presented herein showcase several design considerations, focusing on optimal deployment methodologies for achieving steady-state and transient-state operation with minimum disruption to the nuclear power cycle. This first part of the study presents steady-state models developed using Aspen HYSYS®, with the thermal energy bypass for NPP-TES coupling being varied at up to 50%. The various components were sized using the Aspen Process Economic Analyzer (APEA) and Aspen Exchanger Design and Rating (EDR), when applicable. Cost functions from these models were developed using the latest publicly available data obtained from APEA V11. The TES-coupled A-NPP steady-state models and cost functions then provided a baseline for dynamic operation and process optimization by using Idaho National Laboratory (INL)’s Framework for Optimization of Resources and Economics (FORCE) tools. A stochastic optimization of the various energy storage systems coupled to the A-NPPs was then performed using the Risk Analysis Virtual Environment (RAVEN) and its dispatch optimization plugin, the Holistic Energy Resource Optimization Network (HERON). The signal processing and synthetic history capabilities of RAVEN were used to account for the unpredictable behavior of electricity markets. An autoregressive moving average (ARMA) model was used to analyze price signals from the Pennsylvania-New Jersey-Maryland (PJM) market and were applied to the HERON analysis in order to optimize a system with the best economics. Transient modeling evaluation was then performed using Modelica models within the HYBRID repository, which was developed at INL for the Department of Energy Integrated Energy Systems program for the characterization of dynamic integrated system behavior and feedback. This includes evaluation of the TES-coupled A-LWR systems’ impact on physical and thermal system response during imposed system demands. Additional TES-coupled reactor types, coupling approaches, markets, and TES technologies will be evaluated in future work.
This study has addressed the technical feasibility and economic viability of LWR hybrid system operations based on realistic market around a specific reactor site in the Upper Midwest United States within the Great Lakes Region and near an industrial center that could benefit from more direct use of nuclear energy. The diverse industrial user and the electricity grid to optimize the revenue of the nuclear plant, depending on specific day-ahead electricity-grid capacity commitments and reserve capacity agreement requirements. For this market arrangement to work, the non-grid user is sold electricity without paying grid service fees (i.e., being considered a house load). This mode of energy sharing may require approval of governing utility commissions, depending on whether the hybrid operations can affect grid supply and manufacturing, agriculture, and transportation systems in this region provides several advantages to converting a nuclear plant into a hybrid plant that produces hydrogen and other feedstock commodities, such as polyethylene or formic acid, for example. Large-scale hydrogen production can essentially service several refineries within 20-30 miles of the nuclear plant. This would results in a measurable reduction of air-pollutant emissions reduction in the region. In addition, a large, consistent supply of hydrogen would draw new industriesmore » to the area—especially other steel-reduction and ammonia plants. For example, the nation’s first synthetic-fuels plant could also be sited near this hydrogen plant to convert CO2 collected from the several ethanol plants in the region into methanol-based chemical feedstock and biofuels. With these perspectives in mind, this study has evaluated the business case for the following hybrid plant options. « less
Integrated energy systems (IES)—including the intimate coupling between thermal generators, the grid, ancillary processes, and energy storage—are becoming increasingly pertinent to the energy grid. To facilitate a better understanding of IES, Idaho National Laboratory (INL) has developed the experimental Thermal Energy Distribution System (TEDS) to test the interoperability of nuclear reactors, energy storage, and ancillary processes in a real-world setting. This paper provides an overview of the development of TEDS within INL’s Modelica dynamic process modeling ecosystem as part of the IES initiative. The model will bridge the gap between lab-scale experimental results and desired grid-scale energy solutions. Two simulation sets were run. The first was a 5-h test simulating a facility shakedown test, putting the facility through five potential operating modes and showcasing the ability of the valving, control sensors, and component controllers to meet system demands. The second case imposed a typical summer day demand on the system from a region with mixed commercial and residential electrical needs. In this case, the generator alone could not meet peak demand but instead required the thermal-storage unit to act as a peaking unit.