The destruction of shallow aquifers by water-conducting fractures of overlying strata caused by underground coal mining is the most representative form of mining-induced damage in the Yushenfu mining area. It has become an important factor restricting the green mining of coal in the Yushenfu mining area and even the ecological protection and high-quality development of the middle reaches of the Yellow River. As the key scientific problem of water-preserved coal mining, the scientific understanding of the development law and main influencing factors of water-conducting fractures in overlying strata has attracted great attention. Taking the geological occurrence characteristics of the main coal seam in Yushenfu mining area as the prototype, 24 different types of numerical models are constructed with the key characteristics of the overburden structure, such as the number of layers of sandstone in the overburden (sand layer coefficient) and the thickness ratio of sandstone and mudstone in the overburden (sand–mud ratio), as the main variables. By means of numerical simulation experiment and theoretical calculation, combined with field measurement and comparison, the influence of the key characteristics of overburden structure on the development height of water-conducting fracture is studied and revealed. It is proposed that the effective area for the study area to achieve water-preserved coal mining by using the height-limited mining method must conform to the coal seam overburden structure characteristics of “sand–mud ratio 6:4 and sand layer coefficient less than 70%” and “sand–mud ratio 8:2 and sand layer coefficient less than 80%”. The results not only enrich and deepen the research on the influence of geological factors and the law of controlling the development of water-flowing fractures in overlying strata, but also provide theoretical support for the precise protection of groundwater resources in the Yushenfu mining area in the middle reaches of the Yellow River.
In this study, to address the overlying strata control issue for the isolated working face of a super-thick coal seam confined by surrounding goafs and open-pit boundaries, we focus on mining via upward slicing strip paste filling in a Ningxia coal mine. We adopt strip coal pillar stability theory for safety factor analysis and conduct FLAC3D three-dimensional numerical simulations to quantitatively reveal overlying strata displacement, stress redistribution, plastic zone evolution, and surface subsidence response. Our theoretical calculations show that, when the mining width is 5 m, the safety factors of retained coal pillars with widths of 5, 10, and 15 m are <1, 1.3, and 1.8, respectively. Our numerical results indicate that the overlying strata of the first slice are dominated by continuous bending subsidence, with a maximum vertical displacement of 21.4 cm, increasing to 55.5 cm after four slices without through damage. High stress is mainly controlled by mined-out area boundaries and inter-face coal pillars, with the maximum principal stress of the fourth slice reaching 18.9 MPa. The surface subsidence center stably corresponds to the underlying backfill goaf, with a maximum value of 11.4 cm. Our research demonstrates that slicing strip filling can suppress deformation and stress concentration risks by reconstructing load transfer and realizing synergistic bearing, as reflected by the limited surface subsidence of 11.4 cm, the controlled maximum principal stress of 18.9 MPa, and the improved coal pillar safety factor from <1 to 1.3–1.8 under wider retained pillars, providing a basis for optimizing strip pillar width and mining–filling parameters.