When prestressing tendons are corroded, a bridge owner must decide whether to replace or repair them. If this decision must be based on a destructive inspection method, section losses in the steel strands must be estimated by measuring either the corrosion depth or the perimeter of the corrosion area. For this study, models for the determination of corrosion progress in corroded wires were investigated in a preliminary study of evaluating section losses in strands. Corroded strands were sampled from a post-tensioned concrete box-girder bridge that demonstrated external tendon failure due to chloride- and moisture-induced corrosion. The strands were cut into equidistant lengths, and the corroded areas of the cross sections were measured. Analysis showed that using models of existing corrosion progress routinely underestimated the section losses for maximum corrosion depth. Actual measurements showed that corrosion rapidly progressed along the perimeter in the earlier stages, and the result was a corroded surface with a convex shape. Herein, new corrosion-progress models that more-accurately reflect the actual corroded sections of wires are proposed. Although the measurements showed a large degree of dispersion, the proposed models were verified as more effective in estimating section losses.
The surface of a quenched and tempered spring steel may have a decarburized layer from which the carbon component has been reduced. The fatigue strength of the decarburized layer is low compared to the base metal, which can easily develop fatigue cracks. Recently, fatigue failure was reported in the tension clamp (SKL 15) of the DFF-300 rail fastening system during use on one urban transit route in South Korea. As a result of measuring the depth of the decarburized layer of the SKL 15 tension clamp where the fatigue failure occurred, a decarburized layer thinner than the manufacturer’s maximum allowable decarburized layer was found in one of the eight tension clamps. To check the depth of the decarburized layer where the fatigue crack may have initiated, the decarburized layer was assumed to be the initial crack, and fatigue crack initiation was assessed based on the linear elastic fracture mechanics. The manufacturer’s maximum allowable decarburized layer depth of 0.2 mm may result in fatigue cracks.
The demand for electric resistance welded (ERW) pipe for deep-water installation has increased, which necessitates a higher degree of accuracy in evaluating the strength of pipe in order to satisfy the design limit state, otherwise referred to as the collapse performance. Since ovality and residual stress governs the collapse performance, an accurate evaluation of these factors is needed. An analytical approach using a three-dimensional finite element method was proposed to simulate the roll-forming and sizing processes in manufacturing ERW pipe. To simulate significant plastic deformation during manufacturing, a nonlinear material model that included the Bauschinger effect was incorporated. The manufacturing of ERW pipe made of API 5L X70 steel was simulated and analyzed for collapse performance. Controlling the ovality of the pipe significantly decreased the amount of pressure that would cause a collapse, whereas the effect of residual stress was minor. These two factors could be improved via the use of a proper sizing ratio.