Purpose: Value co-creation amongst project stakeholders is often necessary for situations where the expertises or resources required are beyond a single stakeholder. Certain project delivery models (PDMs) with strong emphasis on relationships and trust are especially suited to value co-creation approach by encouraging collaborations amongst stakeholders and innovations. However, anecdotal evidence suggests that value co-creation impacts positively on particular types of projects but not on others. The purpose of this paper is to investigate the effect of value co-creation on project performance (PP) and how the effect is moderated by requirements uncertainty (RU). Design/methodology/approach: Based on the data from a cross-sectional survey of 120 Chilean construction project managers, the study validated a conceptual framework on the moderated effects of value co-creation process. Findings: Value co-creation process underpinned through relational engagement, collaboration and innovativeness positively impacts on PP, and project’s RU moderates this relationship. Practical implications: The findings empirically show that collaborative PDMs are best suited to projects where requirements are uncertain. Identifying the most suitable delivery model for a given context can reduce the project’s risk of failure and help maximise project value. When RU is low, the co-creating value is less critical to PP; whereas, when RU is high, choosing a collaborative PDM is fundamental to superior PP. Originality/value: This study provides much-needed evidence on the effects of value co-creation process on PP. Additionally, it contributes to the literature by conceptualising and validating the moderated impact on PP by RU.
In the Industry 4.0 scenario, innovation emerges as a clear driver for the economic development of societies. This effect is particularly true for the least developed countries. Nevertheless, there is a lack of studies that analyze this phenomenon in these nations. In this context, this study aims to examine the impact of perceived barriers to innovation to predict companies′ innovative intentions in an emerging economy. This study is a preliminary effort to use data mining and symmetry-based learning concepts, especially classification, to assist the identification of strategies to incentivize intention to innovate in companies. Using the decision tree classification technique, we analyzed a sample of Chilean companies (N = 5876). The sample was divided into large enterprises (LEs) and small and medium enterprises (SMEs). In the group of large companies, the barriers that most impact the intention to innovate are innovation cost, lack of demand innovations, and lack of qualified personnel. Alternatively, in the group of small-medium companies, the barriers that most impact the intention to innovate are lack of own funds, lack of demand innovations, and lack of information about technology. These results show how the perceptions of barriers are significant to predict the intentions of innovation in Chilean companies. Furthermore, the perceptions of these barriers are contingent on the organizational sizes. These findings contribute to understanding the effect of contingencies on innovative intention in an emerging economy.
5 May 2022 in Mathematical Problems in Engineering
Prior literature recognizes two schools of thought on value creation in projects: one based on transaction cost economics and the other on relational-based theories. There is little empirical research on the impacts of these approaches within different project contexts. This study aims at analyzing the effect of value creation processes on the project value moderated by requirements uncertainty and project complexity, two critical contextual variables. We used a cross-sectional survey to collect data from 168 project managers in Chile. Three groups were distinguished from a cluster analysis considering the requirements uncertainty and project complexity. A proposed conceptual framework is validated globally and for each group through a multigroup analysis via partial least squares structural equation modeling (PLS-SEM). The global model results indicate an R2 of 0.37, and for the groups, the R2 ranges from 0.33 to 0.85, and the path coefficients range from 0.57 to 0.92. Additionally, the PLS-SEM multigroup analysis shows significant statistical differences. Group 3 (low complexity and low uncertainty) is different from Group 1 (high complexity and high uncertainty) and Group 2 (high complexity and low uncertainty), with p values of 0.027 and 0.023, respectively. Therefore, these empirical findings contribute to the literature demonstrating that value creation processes impact the project value. In particular, these effects are moderated by the current level of project requirements uncertainty and complexity in different contexts.
1 December 2018 in Revista ingeniería de construcción
Resumen: La investigación propone una estrategia para elaborar planes de entrenamiento cruzado para ser implementado en empresas de ingeniería que realizan proyectos multidisciplinarios. A través de datos empíricos recolectados mediante la aplicación del método del caso, el estudio efectúa un análisis para determinar las actividades y tareas que podrán realizar los especialistas de disciplinas diferentes pero complementarias. El estudio se apoya en diferentes teorías existentes, tales como la rotación de los puestos de trabajo, los modelos de madurez en la gestión de proyectos, el capital intelectual y las teorías motivacionales y de liderazgo. Como resultado, cada especialista obtiene una visión holística sobre el manejo de proyectos interdisciplinarios, aportando en su desarrollo y mejorando las coordinaciones de las diferentes áreas. La aplicación de estos planes de entrenamiento a personal clave en proyectos multidisciplinarios beneficia a las relaciones interpersonales dentro del equipo del proyecto, y en consecuencia, colabora en la obtención de proyectos con mejor desempeño.
Formal contracts and relationships are the two main types of project governance approaches. Some studies have found that the two approaches are substitutive, while others have shown that they are complementary rather than mutually exclusive. In the construction industry where is common to contract out most of construction work to contractors specializing in project delivery, there has been a marked shift from reliance on tight contract to relationship oriented agreements. The dominant logic of the former is, through exchanges of mostly technical information, to coordinate project’s tasks to delivery project outcomes specified in the contract: a process synonymous to independent value creation. In contrast, the dominant logic of the latter is that by looking after each other’s interests and even sharing gains and pains, parties bounded by common interests collaborate strategically much beyond simple technical level coordination in order to deliver the project: a process referred to as value co-creation. Coordination, however, is not isolated from collaboration. Increased collaboration leads to more and effective coordination. This study examines how coordination and collaboration jointly impact on project value. Adding to the literature, the study shows that the effect of collaboration on project value is mediated by coordination.