The utility tunnels used for electricity transmission are in high demand these days. The literature presents many limitations in the currently used cutterhead drive design procedure while using a shield tunnel boring machine (TBM) for the excavation of these relatively small diameter tunnels. In order to develop an appropriate design method specially for cutterhead drive, experimental data obtained through the operation of a 3560 mm diameter shield TBM were used in this research work. For experimental purpose, an earth pressure balance (EPB) shield TBM was manufactured and a facility was established for performing the full-scale tunneling tests. Numerous tests were performed through the variation of TBM operational parameters such as thrust force and the rotational speed of the cutterhead at four UCS (Uniaxial compressive strength) levels of artificial rock mass. The relationships between thrust force and torque were mainly established and the effects of UCS and rotational speed of cutterhead on these relationships are analyzed through a representative case of 100 MPa UCS. A novel torque estimation method is also presented in this study which can be conveniently used in the cutterhead drive design while using small diameter shield TBMs.
The TBM disc cutter, which is the main cutting tool of tunnel boring machines (TBMs), is replaced when it is excessively worn during the boring process. Disc cutters are usually monitored by workers at cutterhead chambers, and they check the status and wear of disc cutters. Manual measurement occasionally results in inaccurate measurement results. In order to overcome these limitations, real-time disc cutter monitoring techniques have been developed with different types of sensors. This study evaluates the distance measurement performance of an eddy-current sensor for measuring disc cutter wear via a series of laboratory experiments. This study focused on identifying the effects of various measurement environments on the sensor’s accuracy. The study considered conditions that the eddy-current sensor may encounter in shield TBM chambers, including air, water, slurry, and excavated muck. Experiments were conducted using both a small-scale disc cutter and a 17-inch full-scale disc cutter. The results indicate that the eddy-current sensor can accurately measure the distance to the disc cutter within a specific range and that its performance remains unaffected by different measurement environments.
The non-open-cut method is used for constructing tunnels under existing roads without blocking traffic. Various non-open-cut methods use pipe roofs made of medium- and large-diameter steel pipe piles. However, the risk of ground settlement or heave is involved during the application of such piles. Therefore, research is conducted through model tests and numerical analysis on the non-open-cut method to investigate these problems using small-diameter piles. The progress of tunnel construction is divided into two repetitive steps. The first step (Stage 1) involves pulling back the pressure panel, and the second step involves propelling the precast structure (Stage 2). The behaviors of the pipe piles and ground displacement are analyzed according to the cover depth, tunnel size, existence and nonexistence of the shoe structure, and progress of tunnel construction. Small-diameter piles reduce the displacement during both stages. With a decrease in cover depth, the stress acting on the pile decreases during Stage 1 and increases during Stage 2. The presence of the shoe structure reduces the stress on the pile during both stages. The ground behavior based on the construction progress indicates that the ground settlement increases during Stage 1; however, no correlation is observed during Stage 2 at low depth.