In this study, we present a meso-scale simulation of the urban microclimate in Berlin, Germany, using the Weather Research and Forecasting (WRF) numerical weather prediction platform. The objective of the study is to derive an accurate estimate of the near-surface urban heat island (UHI) intensity. The simulation is conducted over a two-week summer period. We compare different physical schemes, different urban canopy schemes and different methods for estimating the UHI intensity. The urban fraction of each urban category is derived using the Copernicus Impervious Density data and the Corine Land Cover data. High-resolution City Geography Markup Language (CityGML) data is used to estimate the building height densities required by the multi-layer urban canopy model (UCM). Within the single-layer UCM, we implement an anthropogenic heat profile based on the large scale urban consumption of energy (LUCY) model. The optimal model configuration combines the WRF Single Moment Five-Class (WSM5) microphysics scheme, the Bougeault–Lacarrère planetary boundary layer scheme, the eta similarity (Mellor–Yamada–Janjic) surface layer scheme, the Noah Multi-Parameterization land surface model, the Dudhia and Rapid Radiative Transfer Model (RRTM) radiation schemes, and the multi-layer UCM (including the building energy model). Our simulated UHI intensity results agree well with measurements with a root mean squared error of and a mean bias error of . After model validation, we proceed to compare several UHI intensity calculation methods, including the ‘ring rural reference’ (RRR) method and the ‘virtual rural reference’ (VRR) method. The VRR mthod is also known as the ‘urban increment’ method. We suggest and argument that the VRR approach is superior.
Within the framework of the project TESIN funded by the German Ministry of Economic Affairs and Energy, a high temperature latent heat thermal energy storage unit is being developed and will be designed, built, commissioned and tested in an operating cogeneration plant in Saarland, Germany. This plant provides superheated steam to industrial process customers from a gas turbine with a heat recovery steam generator. Currently, a secondary boiler is operated at minimal load, from which it can be heated to full load in 2minutes. With the integration of the thermal energy storage into the plant, the secondary boiler will be reduced from minimal to warm load operation. In case of a failure of the gas turbine, the storage will produce steam for 15min. while the secondary boiler is heated from a warm to a hot operating load. This standby load reduction in the secondary boiler will reduce the use of fossil fuels.The steam demand from the thermal storage is for 8 t/h at around 25bar and a minimum temperature of 300°C. This results in a high power level of about 6 MWth and a necessary storage capacity of 1.5 MWh. At this pressure level, the steam is superheated about at least 75K. The combination of the superheating and the required power level has led to a smaller tube distance than in previous storage units as well as a new axial fin design. The basic storage as well as the fin design combined with nitrate salts as the storage material have been analyzed with simulation tools. Detailed design planning, permitting and build of the system are the coming steps in this part of the project. The design of these fins, storage unit design and planned integration in the cogeneration plant are presented here