Recent developments related to the energy transition pose particular challenges for distribution grids. Hence, precise load forecasts become more and more important for effective grid management. Novel modeling approaches such as the Transformer architecture, in particular the Temporal Fusion Transformer (TFT), have emerged as promising methods for time series forecasting. To date, just a handful of studies apply TFTs to electricity load forecasting problems, mostly considering only single datasets and a few covariates. Therefore, we examine the potential of the TFT architecture for hourly short-term load forecasting across different time horizons (day-ahead and week-ahead) and network levels (grid and substation level). We find that the TFT architecture does not offer higher predictive performance than a state-of-the-art LSTM model for day-ahead forecasting on the entire grid. However, the results display significant improvements for the TFT when applied at the substation level with a subsequent aggregation to the upper grid-level, resulting in a prediction error of 2.43% (MAPE) for the best-performing scenario. In addition, the TFT appears to offer remarkable improvements over the LSTM approach for week-ahead forecasting (yielding a predictive error of 2.52% (MAPE) at the lowest). We outline avenues for future research using the TFT approach for load forecasting, including the exploration of various grid levels (e.g., grid, substation, and household level).
26 November 2014 in Computer Science - Research and Development
Studies regularly demonstrate how well intelligent agents (IAs) can support humans or are demonstrably superior to them in some areas. Given that some tasks likely remain unsuitable for even the most intelligent machines in the mid-future, work in hybrid teams of humans and IAs—where the capabilities of both are effectively combined—will most likely shape the way we work in the coming decades. In an abductive study, we investigate an early example of hybrid teams, consisting of a conversational intelligent agent (IA) and humans, that aims to improve health behavior or change personality traits. We theorize Transactive Intelligent Memory System (TIMS) as a new vision of collaboration between humans and IAs in hybrid teams, based on our empirical insights and our literature review on transactive memory systems theory. Our empirical evidence shows that IAs can develop a form of individual and external memory, and hybrid teams of humans and IAs can realize joint systems of transactive memory—a competence that current literature only ascribes to humans. We further find that whether individuals view IAs merely as external memory aids or as part of their teams’ transactive memory is moderated by the tasks’ complexity and knowledge intensity, as well as the IA’s ability to complete the task. This theorizing helps to better understand the role of IAs in future team-based working processes. Developers of IAs can use TIMS as a tool for requirements formulation to prepare their software agents for collaboration in hybrid teams.
Heat pumps embody solutions that heat or cool buildings effectively and sustainably, with zero emissions at the place of installation. As they pose significant load on the power grid, knowledge on their existence is crucial for grid operators, e.g., to forecast load and to plan grid operation. Further details, like the thermal reservoir (ground or air source) or the age of a heat pump installation renders energy-related services possible that utility companies can offer in the future (e.g., detecting wrongly calibrated installations, household energy efficiency checks). This study investigates the prediction of heat pump installations, their thermal reservoir and age. For this, we obtained a dataset with 397 households in Switzerland, all equipped with smart meters, collected ground truth data on installed heat pumps and enriched this data with weather data and geographical information. Our investigation replicates the state of the art in the area of heat pump detection and goes beyond it, as we obtain three major findings: First, machine learning can detect the existence of heat pumps with an AUC performance metric of 0.82, their heat reservoir with an AUC of 0.86, and their age with an AUC of 0.73. Second, heat pump existence can be better detected using data during the heating period than during summer. Third the number of training samples to detect the existence of heat pumps must not be necessarily large in terms of the number of training instances and observation period.