Kyong Ho Ryu

Mr. Kyong Ho Ryu


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
JOJung-Eun Oh
Jung-Eun Oh
Yeon S. ChangYeon S. Chang
Yeon S. Chang
Weon-Mu JeongWeon-Mu Jeong
Weon-Mu Jeong
KKKi Hyon Kim
Ki Hyon Kim
KRKyong Ho Ryu
Kyong Ho Ryu
Video monitoring systems (VMS) have been used for beach status observation but are not effective for examining detailed beach processes as they only measure changes to the shoreline and backshore. Here, we extracted longshore sediment transport (LST) from VMS in order to investigate long- and short-term littoral processes on a pocket beach. LST estimated by applying one-line theory, wave power, and the oblique angle of incident waves were used to understand shoreline changes caused by severe winter storms. The estimated LST showed good agreement with the shoreline changes because the sediments were trapped at one end of the pocket beach and the alongshore direction of transported sediments was corresponded to the direction of LST. The results also showed that the beach that was severely eroded during storms was also rapidly recovered following the evolution of LST, which indicates that the LST may play a role in the recovery process while the erosion was mainly caused by the cross-shore transport due to storm waves. After the beach was nourished, beach changes became more active, even under lower wave energy conditions, owing to the equilibrium process. The analysis presented in this study could be applied to study inhomogeneous beach processes at other sites.

Verified
Journal Article
Open access
PDF file
JDJong Dae Do
Jong Dae Do
SHSang-Kwon Hyun
Sang-Kwon Hyun
JJJae-Youll Jin
Jae-Youll Jin
BLByunggil Lee
Byunggil Lee
Weon-Mu JeongWeon-Mu Jeong
Weon-Mu Jeong
Yeon S. ChangYeon S. Chang
Yeon S. Chang
Severe shoreline erosions are commonly observed due to the side effects of breakwaters constructed to protect the habitat. These breakwaters can cause wave energy differences behind the structure due to diffraction, inducing longshore sediment transport and resulting in shoreline changes. Therefore, it is essential to correctly simulate the effect of wave transformation in the lee side of structures, but such studies reporting performance of models in the field have been relatively rare. In this study, two wave models of the TELEMAC system were used to investigate the accuracy of modeling the wave transformation effect in a lee area of a breakwater built to secure the harbor’s tranquility, near Jukbyeon Port in Korea, through comparisons with field observations. Two cases of wave conditions with different wave heights and directions were tested. In both cases, the TEL EMAC–ARTEMIS model had lower errors than TELEMAC–TOMAWAC at the onshore wave location, confirming that the phase-resolving ARTEMIS showed better performance in simulating the wave transformation than the phase-averaged TOMAWAC, as expected. However, ARTEMIS had slightly higher errors than TOMAWAC at the offshore location, probably due to the interference by reflected waves from the complex coastlines formed by the different coastal structures. The results also provide various implications learned from the numerical experiments, which can be usefully applied to engineering aspects, such as for the estimation of harbor tranquility.

Verified
Journal Article
Open access
PDF file
KRKyong Ho Ryu
Kyong Ho Ryu
Weon-Mu JeongWeon-Mu Jeong
Weon-Mu Jeong
JOJung-Eun Oh
Jung-Eun Oh
WBWon-Dae Baek
Won-Dae Baek
Yeon S. ChangYeon S. Chang
Yeon S. Chang
The effect of a detached breakwater, which was constructed to improve harbor tranquility inside Pohang New Port, was examined through the comparison of wave data measured before and after the construction of the breakwater. The observation data showed that the wave energy was effectively reduced by the breakwater, although the wave height measured outside the breakwater was higher after its construction. The wave energy was reduced in all of the measured wave-propagating directions, but it was also observed that the breakwater became less effective in protecting against northeastwaves than in protecting against NNE waves. The BOUSS-2D Boussinesq-type wave model was employed to analyze the pattern of wave propagation, showing that, before the breakwater’s construction, NE waves could directly enter the port, increasing the wave energy inside the port. After the breakwater’s construction, simulations showed that the detached breakwater effectively blocked the waves approaching the port from both the NNE and NE directions, although the wave heights of the waves from the extreme NE direction inside the port increased. Considering that the estimated probability of failing to preserve the port tranquility was only 0.2–0.5% for these extreme NE waves, it was concluded that no secondary structures were necessary, and the existing breakwater was sufficient for the protection of the port.

30 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JOJung-Eun Oh
Jung-Eun Oh
Weon-Mu JeongWeon-Mu Jeong
Weon-Mu Jeong
KRKyong Ho Ryu
Kyong Ho Ryu
JPJin-Young Park
Jin-Young Park
Yeon S. ChangYeon S. Chang
Yeon S. Chang
Once a beach is eroded by storm waves, it is generally recovered under milder wave conditions. To prevent or reduce damage, it is therefore important to understand the characteristics of the site-specific recovery process. Here, we present the results, based on a data set from a video monitoring system and wave measurements, of the recovery process in a pocketed beach located inside a bay where the shoreline retreated harshly (~12 m, on average, of beach width) during Typhoon TAPAH (T1917) in September 2019. It took about 1.5 years for the beach to be recovered to the level before the typhoon. During this period, the erosion and accretion were repeated, with the pattern highly related to the wave power (Pw); most of the erosion occurred when Pw became greater than 30 kWatt/m, whereas the accretion prevailed when Pw was no greater than 10 kWatt/m. The recovery pattern showed discrepancies between different parts of the beach. The erosion during storm events was most severe in the southern part, whereas the northern shoreline did not significantly change even during TAPAH (T1917). In contrast, the recovery process occurred almost equally at all locations. This discrepancy in the erosion/accretion process was likely due to human intervention, as a shadow zone was formed in the northern end due to the breakwaters, causing disequilibrium in the sediment transport gradient along the shore. The results in this study could be applied in designing the protection plans from severe wave attacks by effectively estimating the size of coastal structures and by correctly arranging the horizontal placement of such interventions or beach nourishment. Although the application of these results should be confined to this specific site, the method using wave energy parameters as criteria can be considered in other areas with similar environments, for future planning of beach protection.

13 December 2022 in Journal of Korean Society of Coastal and Ocean Engineers
Verified
Journal Article
Open access
PDF file
JBJong-Dai Back
Jong-Dai Back
KRKyong Ho Ryu
Kyong Ho Ryu
JLJong-In Lee
Jong-In Lee
WJWeon-Mu Jeong
Weon-Mu Jeong
YCYeon-S. Chang
Yeon-S. Chang
This study estimates the design wave in the event of a typhoon attack at Busan new port using the wind field, the revised shallow water design wave estimation method proposed by the Ministry of Oceans and Fisheries in 2020, and proposed a reliable method of calculating the shallow water design through verification with the wave observation data. As a result of estimating typhoon wave using the wind field and SWAN numerical model, which are commonly used in the field work, for typhoon that affected Busan new port, it was found that reproducibility was not good except typhoons KONG-REY(1825) and MAYSAK(2009). In particular, in the case of typhoon MAEMI(0314), which had the greatest impact on Busan new port, the maximum significant wave height was estimated to be about 35.0% smaller than that of the observed wave data. Therefore, a plan to improve the reproducibility of typhoon wave was reviewed by applying the method of correcting the wind field and the method of using the Boussinesq equation numerical model, respectively. As a result of the review, it was found that the reproducibility of the wind field was not good as before when the wind field correction. However as a method of linking wind field data, SWAN model results, and Boussinesq numerical model, typhoon wave was estimated during typhoon MAEMI(0314), and the maximum significant wave was similar to the wave observations, so it was reviewed to have good reproducibility.