Bruno Colonetti

Mr. Bruno Colonetti


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 June 2022 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
BCBruno Colonetti
Bruno Colonetti
EFErlon Cristian Finardi
Erlon Cristian Finardi
SBSamuel Brito
Samuel Brito
VZVictor Zavala
Victor Zavala
Unit commitment has been at the center of power system operations for over 50 years. Yet, this problem cannot be considered solved due to its size and complexity. Today, operators rely on off-the-shelf optimization solvers to tackle it, and often resort to simplifications to make the problem tractable and solvable in reasonable times. Nonetheless, despite the simplifications and advancements in commercial optimization solvers, solving the unit commitment in a timely manner is still a challenge. In this work, we propose a parallel dual dynamic integer programming approach for solving this problem. Different from what can be currently found in the literature, our parallel approach is applied to a deterministic problem and thus requires induced parallelization. Our strategy is assessed on 20 cases of a hydrothermal system with over 7,000 buses and it is able to solve all instances to a 0.1% gap in less than two hours with speed-ups up to 9.2 compared to a sequential strategy. We also apply our strategy to a purely thermal, large-scale academic system with 9,241 buses, 16,049 transmission lines and 1,445 generating units, for which our strategy returns a 0.1% solution in less than 30 min.

22 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
BCBruno Colonetti
Bruno Colonetti
EFErlon Cristian Finardi
Erlon Cristian Finardi
Lucas Borges PicarelliLucas Borges Picarelli
Lucas Borges Picarelli
As we move towards electrical networks with a growing presence of renewable generation, the representation of the electrical components becomes more important. In hydro-dominated power systems, modelling the forbidden zones of hydro plants becomes increasingly challenging as the number of plants increases. Such zones are ranges of generation that either should be avoided or are altogether unreachable. However, because representing the forbidden zones introduces a substantial computational burden, hydrothermal unit-commitment problems (HTUC) for large systems are usually formulated ignoring the forbidden zones. Nonetheless, this simplification may demand adjustments to the solution of the HTUC, because the generation of the hydro stations may fall in forbidden zones. In practice, the adjustments are usually performed based on the experience of system operators and, then, can be far from an optimal correction. In this paper, we study the impact of explicitly representing the hydro-generation forbidden zones in a large-scale system with more than 7000 buses, 10,000 lines, and 700 hydro units. Our findings show that the simplified model that is current used can deviate significantly from the model with forbidden zones, both in terms of the generation of hydro plants, as well as the generation of thermal plants and the system marginal costs.

18 September 2020 in Algorithms
Verified
Journal Article
Open access
PDF file
BCBruno Colonetti
Bruno Colonetti
EFErlon Cristian Finardi
Erlon Cristian Finardi
WOWelington de Oliveira
Welington de Oliveira
Independent System Operators (ISOs) worldwide face the ever-increasing challenge of coping with uncertainties, which requires sophisticated algorithms for solving unit-commitment (UC) problems of increasing complexity in less-and-less time. Hence, decomposition methods are appealing options to produce easier-to-handle problems that can hopefully return good solutions at reasonable times. When applied to two-stage stochastic models, decomposition often yields subproblems that are embarrassingly parallel. Synchronous parallel-computing techniques are applied to the decomposable subproblem and frequently result in considerable time savings. However, due to the inherent run-time differences amongst the subproblem’s optimization models, unequal equipment, and communication overheads, synchronous approaches may underuse the computing resources. Consequently, asynchronous computing constitutes a natural enhancement to existing methods. In this work, we propose a novel extension of the asynchronous level decomposition to solve stochastic hydrothermal UC problems with mixed-integer variables in the first stage. In addition, we combine this novel method with an efficient task allocation to yield an innovative algorithm that far outperforms the current state-of-the-art. We provide convergence analysis of our proposal and assess its computational performance on a testbed consisting of 54 problems from a 46-bus system. Results show that our asynchronous algorithm outperforms its synchronous counterpart in terms of wall-clock computing time in 40% of the problems, providing time savings averaging about 45%, while also reducing the standard deviation of running times over the testbed in the order of 25%.

26 November 2024 in Electric Power Systems Research
Verified
Journal Article
Closed access
BCBruno Colonetti
Bruno Colonetti