Haijiang LI

Prof. Haijiang LI

BIM for Smart Engineering Center, Cardiff University, Queen’s Buildings, Cardiff CF24 3AA, Wales, UK

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 December 2024 in Neural Computing and Applications
Verified
Journal Article
Closed access
PDF file
CZChangting Zhong
Changting Zhong
GLGang Li
Gang Li
ZMZeng Meng
Zeng Meng
HLHaijiang LI
Haijiang LI
AYAli Rıza Yıldız
Ali Rıza Yıldız
Seyedali MirjaliliSeyedali Mirjalili
Seyedali Mirjalili

28 March 2015 in Natural Hazards
Verified
Journal Article
Closed access
PDF file
SASaud Ali Alshehri
Saud Ali Alshehri
YRYacine Rezgui
Yacine Rezgui
HLHaijiang LI
Haijiang LI

13 August 2014 in The Scientific World Journal
Verified
Journal Article
Open access
PDF file
BWBin Wang
Bin Wang
HLHaijiang LI
Haijiang LI
YRYacine Rezgui
Yacine Rezgui
ABAlex Bradley
Alex Bradley
HOHoang N. Ong
Hoang N. Ong
Recent building emergency management research has highlighted the need for the effective utilization of dynamically changing building information. BIM (building information modelling) can play a significant role in this process due to its comprehensive and standardized data format and integrated process. This paper introduces a BIM based virtual environment supported by virtual reality (VR) and a serious game engine to address several key issues for building emergency management, for example, timely two-way information updating and better emergency awareness training. The focus of this paper lies on how to utilize BIM as a comprehensive building information provider to work with virtual reality technologies to build an adaptable immersive serious game environment to provide real-time fire evacuation guidance. The innovation lies on the seamless integration between BIM and a serious game based virtual reality (VR) environment aiming at practical problem solving by leveraging state-of-the-art computing technologies. The system has been tested for its robustness and functionality against the development requirements, and the results showed promising potential to support more effective emergency management.

30 September 2014 in Natural Hazards
Verified
Journal Article
Closed access
PDF file
SASaud Ali Alshehri
Saud Ali Alshehri
YRYacine Rezgui
Yacine Rezgui
HLHaijiang LI
Haijiang LI

8 August 2017 in Energies
Verified
Journal Article
Open access
PDF file
IPIoan Petri
Ioan Petri
SKSylvain Kubicki
Sylvain Kubicki
YRYacine Rezgui
Yacine Rezgui
AGAnnie Guerriero
Annie Guerriero
HLHaijiang LI
Haijiang LI
Reducing carbon emissions and addressing environmental policies in the construction domain has been intensively explored with solutions ranging from energy efficiency techniques with building informatics to user behavior modelling and monitoring. Such strategies have managed to improve current practices in managing buildings, however decarbonizing the built environment and reducing the energy performance gap remains a complex undertaking that requires more comprehensive and sustainable solutions. In this context, building information modelling (BIM), can help the sustainability agenda as the digitalization of product and process information provides a unique opportunity to optimize energy-efficiency-related decisions across the entire lifecycle and supply chain. BIM is foreseen as a means to waste and emissions reduction, performance gap minimization, in-use energy enhancements, and total lifecycle assessment. It also targets the whole supply chain related to design, construction, as well as management and use of facilities, at the different qualifications levels (including blue-collar workers). In this paper, we present how building information modelling can be utilized to address energy efficiency in buildings in the operation phase, greatly contributing to achieving carbon emissions targets. In this paper, we provide two main contributions: (i) we present a BIM-oriented methodology for supporting building energy optimization, based on which we identify few training directions with regards to BIM, and (ii) we provide an application use case as identified in the European research project “Sporte2” to demonstrate the advantages of BIM in energy efficiency with respect to several energy metrics.

1 December 2012 in Automation in Construction
Verified
Journal Article
Closed access
MDMichael Dibley
Michael Dibley
HLHaijiang LI
Haijiang LI
YRYacine Rezgui
Yacine Rezgui
JMJohn Miles
John Miles